CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000100010119-7
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
September 9, 2003
Sequence Number:
119
Case Number:
Publication Date:
January 15, 1970
Content Type:
CONT
File:
Attachment | Size |
---|---|
![]() | 113.19 KB |
Body:
L MS ved For Rouse 2003/12/04 : CFAIRIDPW F4
FICIPP 00 0119-7
o
LI yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY DEEN DELIVERED TO CONTRACTOR DURING.THIS PERIOD?
(If yes, indicate items, quantity, and cost on reverse side.)
TO : ---
UVLRALL PERFORMANCE OF CONTRACTOR
ABOVE AVERAGE 7. UNSATISFACTORY
Ej El
4- ~''? J ~
5- ~L''`y1 AVERAGE
6, 1 I MINIMUM ACCEPTABLE
OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
1-5 January 1970
CONTRACT NO,
INSPECTION REPORT NO. (If final, so state)
11
F~TIM ~ -- -
AT
NTME OF CONTRACTOR
Stereo Comparator
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS IN YES El No IF ANSWER IS "NO" ADVISE REC.
-_ OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
REVERSE. HEREOF, IF KNOWN. INDICATE MAGNITUDE OF AD-
DITIONAL FUNDS INVOLVED.
25X1
Fabrication of a High Precision
THE CONTRACTOR IS ON SCHEDULE
-_ 1 1 YE S n x N O
PER CENT OF WORK COMPLETED -
PER CENT OF FUNDS EXPENDED -
INCENTIVES
IS THIS AN INCENTIVE CONTRACT YES 0 NO
IF YES, CHECK TYPE
? COST O AA WARD LaI PERFORMANCE 6 DELIVERY
RECOMMENDED ACTION
2. fl
CONTRACT INSPECTION REPORT
7 T?1
78%
HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM
DURING THE PERIOD? ri YES N
erf
3, U VERY GOOD
IF OVERALL PERFORMANCE
REASONS ON REVERSE SIDE.
m
CONTINUE AS PROGRAMMED
0 CLOSE OUT
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
IJ
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE
APPLICABLE, THE FOLLOWING:
DRAWINGS AND SPECIFICATIONS
PRODUCTION AND/OR OTHER
END ITEMS
DOES NOT
APPLY
ED COMPLETION DATE
1 October. 1970
[j [1NCI.ASa` Ir_,
D
THE CONTRACTOR
LI
NOTE: --
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
ITEM
DATE OF LAST CONTACT WITH CONTRACTOR
9 January 1970
897 PREVIOUS
E D I T I ON
UNCLASSIFIED [X] CONFIDENTIAl~
REC 'D
D SECRET
Declass Review by
NIMA/DOD
DOES NOT
APPLY
--25-1
Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010119-7
1 UPdCLASS IFlFD
~_. ~ ed For Re sey2003/12/04 a1~tAD0966'4~~ ,L4Q ~U119.-7...
flARRATIVE REPORT . l IINTERIM D FINAL
1. The program schedule calls for 82% of the work to be completed and. 77%
is actually complete.
72o spent and 6% committed.
2. The front of this report lists '78% of the funds expended, this includes
25X1
3. reject Manager visited. from 5-1.6 December 1969 to determine
the cause 01' slip in the optical- subcontract schedule. The delay was due to
a 3 week strike at the lane and mechanical problems with an optical
subsystem. The new date for o start acceptance tests on the optical system
is 25 February 1970. On 9 January'1970 reconfirmed this date in a cable
to t Yd reported that work was progressing very well. 25X1
4. has informed the technical monitor that the memory capacity of the
Computer (16,000 core memory) is not adequate to handle the entire
computer program. 0 and NPIC are investigating the best approach (drum vs core)
for added memory. When this is resolved I will be requested to submit a pr X a:
for a change-in-scope to increase the memory storage.
out a test plan for the optical system. I 25X1
5. 'roject Manager will. visit
6. Total Authorized Funds: Original Contract -{
the last week of January to work
25X1
25X1
Total
0 UNCLASSIFIED [] COF,FIDENT IAL