HIGH PRECISION STEREO COMPARATOR PROGRAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000100010167-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 9, 2003
Sequence Number: 
167
Case Number: 
Publication Date: 
May 21, 1970
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000100010167-4.pdf131.05 KB
Body: 
Approved F Release NOW: : CIA-RDP78B05 1A000100010167-4 NPIC/TSSG/RED/SDB-023-70 21 May 1970 25X1 25X1 SUBJECT: High Precision Stereo Comparator Program 1. The HPSC Coordinating Group met on 18 Ma 1970. In attendance were IEG/PHD; PSG/AID; SSG APSD; TSSG RED? 2. The following items were discussed: 25X1 25X1 25X1 25X1 25X1 25X1 a. The environmental black box has been delayed in shipment and has not arrived at the = plant as of 18 May. b. The optical system will be shipped on 21 May instead of 19 May. This delay is caused by the They must inspect eacn package an crate atter packing and prior to final sealing. c. The acceptance tests on the correlation system at are going very well. The testing is complete an the data is being run through a computer. This should be completed on 20 May. est engineer, reports that the area pu -in range of the correlator is much better than was anticipated. d. project manager, returned from I Ion 15 May 1970. e. PHD stated that limiting the upper zoom range to 25X - 200X instead of 20X - 200X does not appear to create a serious problem since there is adequate coverage in the lOX to 100X range. Declass Review by NIMA/DOD "I'll 1 E laded fro' I' Mompt:e c x Approved For Release 20 T CIA-RDP78B05' 71A QP'00O10167-4 Approved FQ. Release a6lff : CIA-RDP78B05J1A000100010167-4 SUBJECT: High Precision Stereo Comparator Program f. has informed the project monitor a storage area has been approved for operational material. g. PHD is in the process of selecting operational material for use in the pre-accep- tance tests at iI During the discussion of this material, it was suggested that it might be advan- tageous to get this material out to by early August. It could be used by I uin debugging his programs and also by NPIC programmers in their on-the-training in mid-August. h. AID stated that they expect to have the stereo program on-line by the first of October. This will be ready when we need it for the HPSC checkout the latter part of October. i. The project monitor had a telephone conversation with on 18 May. Mr. stated that the optical tests had gone very well and the only problem areas were in range of reticle adjustment, 2.5 to 1 instead of 4 to 1 (previously reported); vignetting at 20X in the higher zoom range (previously reported) but overcome by limiting the zoom from 25X to 200X; and that distortion had also exceeded the speci- fication at the same 20X point. gave the following results from the distortion tests at The specification calls for no more than + 2% of the edge and + 1% at 2/3 of field. Magnification 2/3 Edge 20 +1.55% +3.25% 31 +1.0 +2.0 37 +0.8 +1.5 40 +0.7 +1.3 50 +0.45 +0.8 63 +0.4 +0.6 Distortion tests on the eyepiece alone produced the following figures. The eyepiece is 18mm in diameter. 25X1 25X1 Approved For Release 2003/1 2 EC TRDP78B05171A000100010167-4 Approved F,Release 2 'Gail : CIA-RDP78B051 1A000100010167-4 SUBJECT: High Precision Stereo Comparator Program Center 0 % lmm 0 2mm 0 3mm +0.13 4mm +0.2 5mm +0.3 6mm +0.39 7mm +0.5 8mm +0.6 j. The project monitor pressed on getting the operating manuals and test p -Lan in on schedule. He was not very optimistic about meeting the schedule. The main holdup is in getting a good technical writer to put these items together. 0 claims to have interviewed many writers but could not find a satisfactory type. There has not been any Progress on the operating manuals since January. reports that was required by contract to provide 0 with a test plan prior to the optical acceptance tests but failed to deliver. put together his own test plan at k. AID requested thati be included in the on-the-job programmer training at This is tentatively scheduled to start 12 August for a two-week period. 1. I Las notified 0 that the Change- in-Scope to add an additional 16K memory to the 516 computer has been approved. II will have to provide an additional half size cabinet to house this addi- tional memory. Logistics will have to make provisions for this cabinet to be located in close proximity to the regular computer cabinet. Logistics will have to provide air ducts in the Clean Room to cool this added cabinet. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 2003/12/~ ~ A- RDP78BO5171A000100010167-4 Approved Fo Release 200SE TCIA-RDP78B051. JA000100010167-4 SUBJECT: High Precision Stereo Comparator Program Distribution: Original - 11038 File 2 - IEG/PHD 2 - PSG/AID 1 - TSSG/APS 1 - PPBS 1 - TSSG/SSD 1 - TSSG/RED 1 - TSSG/ESD 1 - TSSG/ESD 25X1 Approved For Release 200 `EfIA-RDP78B05171A000100010167-4