DISCUSSION OF(Sanitized)SUBCONTRACT OF(Sanitized) CONTRACT FOR HIGH PRECISION STEREO COMPARATOR ON 26 MARCH 1968
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000100010179-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
September 9, 2003
Sequence Number:
179
Case Number:
Publication Date:
March 27, 1968
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 108.54 KB |
Body:
Approved For Release 2003/1g'/DP78B05171fififl 0100010179-1'
... S
NPIC/TSSG-47/68
27 March 1966
PARTICIPAWS i
! If3RA1 DU FOR THE RECORD
SUBJECTS D, s ion of I ubcontract o
Contract for High Precision Stereo Cc-sra or
on 26 liar eh 1968
;h Precision Stereo Con arator with particular reference o
t
1. The NPIC representatives met with the above 3 individuals to
discuss the current status of approval of the 0 Contract fortt e
.
ubaontract for the Optical System of that equipmen
bowed us a copy of the note that had
e
2.
written to calling his attention to the I Ima .er and
recommending that C not be constrained from proceeding with the
might go in
subcontract
contract.
personally
contract.
contract, includi
enorted that he had discussed the matter
who had approved the negotiation of the
J
not object to the inclusion of the
contrac
ly aware that the optical System Subcontract
t direction.
3. O showed *eseral a draft
memorandum reiterating NPIC's views on the destreabil.ity? o' using
for the optical System, but it was their unanimous opinion
that another memorandum was not necessary. -' fear as they were concerned
they considered the matter approved.
25X
25X1
25X1
25X1
25X1
25X1
25X1
1. mL. ,.?_.-4.4.,.. aaiAssri w4th the understanding that would 25X1
convey their views verbally tol I 4.1 v=A.,max~.~. 25X1
not surfice would. prepare a memorandum for the signature of
reassuring f their understanding on the 25X1
matter.
Declass Review by NIMA/DOD
Executive Officer, TSSG, NPIC
Distribution ExC!utl :t:
final - dCHII ~v n d
78B05171A00010001017 de o" ;' "
App oved Eoc ease 2003/1 2/
OL j' L: I
3 CP
25X1
SECRET
Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010179-1
NPIC/TssG-67-68
22 May 1968
MEMORANDUM FOR: Chief, Planning, Programming and Budgeting Staff
SUBJECT: Site Preparations for the( (Comparator
The attached memorandum describes the historical development
of the change in cost for site preparations. I would like to note
that the Project Monitor was also included in the visits. The two
trip reports described the problems at the time. The first trip
was 17 April 1967; the second trip was November 1967; and the
third trip, 13 May 1968. These trips were specifically designed
to plan for the on-site preparations.
Chief, T n n Group,
Stereo Compara or
Attachment:
Estimated Cost for Site
Preparations in
to House the precision
Approved For Release 2003/12/04: CIA-RDP78BO5171A000100010179-1
SECRET
25X1
25X1
uv:assit~atisa