INSTALLATION SITE FOR THE HIGH PRECISION STEREO COMPARATOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000100020004-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 17, 2003
Sequence Number: 
4
Case Number: 
Publication Date: 
April 17, 1968
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000100020004-3.pdf79.6 KB
Body: 
CONFIDENTIAL #`//oqg Approved For Release 2003/05/14: CIA-RDP78B05171A000100020004-3 X1 25 NFlc/TSSG/ID-1181--68 17 April 1968 MMRARDT24 FOR: Chief, Support Services Division, TSSG/NPIC installation Site for the High Precision Stereo Comparator 25 X1 25X1 25 X1 1. lhas e~nawards a contract to fabricate the high Frecislon Stereo Comparator. The fabrication of this instrument is to be in accord- ance with the specifications that evolved from the design and development contract recently completed by 0 for NPIC. 2. The program schedule calls for the instrument to be fabricated, installed and. completely checked out in 92 weeks. plan calls for the installation of the instrument in 'o co ence the 73rd week of the program. The Contractor has agreed to supply NPIC with the environmental, and utilities requirements for the instrument no later than 90 days from the start of the contract. The Contractor does not expect any significant change in the site preparation requirements that were dis- cussed faith at earlier coordination meetings. 3. The Contractor was authorized to proceed with the contract on 5 April 1968 so the following dates may be considered to be key dates if the program is to be completed on schedule. a. 5 July 1968 - Firm requirements to be levied on NPIC for site environment and utilities. b. 1August 1969 - Site Preparation completed by 1IPIC and ready for installation of the instrument. c. 1 January 1970 -- Instrument and Clean Room Site completely checked out and ready to be turned over to the Imagery Exploitation Group. 25X1 4. It is requested that appropriate site preparation plans be ini- tiated to insure completion of the environmental and utilities require- ments prior to delivery of the instrument. Chiefs Development Engineering Division, TSSG Distribution: Orig - Addressee 1 - NPIC/TSSG/Exec. Off. v - RPIC/TSSG/DED (11038) NPIC/TS ed For Release 2003/05 '(t7 RW78B0517'W0U @@&b4-3 25X1 25X11 25X1 25XI1 Exct da tr4S tntDMatk OewngrH. g 1*4 ._ des#aealilQattat CNFIDENTIAL