CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000400020001-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 1, 2005
Sequence Number: 
1
Case Number: 
Publication Date: 
May 15, 1973
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000400020001-0.pdf120.21 KB
Body: 
i.,~ JLa.:~L I LJ L F' Approved For RWhse CONTRACT INSPECTION REPORT ~ To. DATE 15 May 1973 INSPECTION REPORT NO. (If final, so state) (3) FINAL ESTIMATED COMPLETION DATE 1.Apri1 1973 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE High-Intensity Light Source THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS (YES ^ No IF ANSWER IS "NO" ADVISE REC- ? YES ^. No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- PER CENT OF'WORK COMPLETED 100% DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - 100% ORT. F?INAL? REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR EP HAS AN INTERIM R 7 ~ YES ^ No (If yes, give details on reverse side.) DURING THE PERIOD? Pe:'I .-HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES y 3 ND 6~7 (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT ^ YES No NOTE: IF Y ES. CHECK TYPE p F F USE REVERSE SIDE FOR COMMENTS. ARD ^ PERFORMANCE 0 DELIVERY 0 COST ^ FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. `W OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 5? ^ AVERAGE 3, ^ VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ^ CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE CLOSE OUT - ^ OTHER (Specify) IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY. THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES - X MANUALS X DRAWINGS AND SPECIFICATIONS X FINAL REPORT X PRODUCTION AND/OR OTHER SPECIAL TOOLING X END ITEMS X OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR Declassification Review by NGA/DoD 15 Aril 1973 12-67 1897 PREVIOUS EOI TION ^ UNCLASSIFIED ? CONFIDENTIA ^ SECRET 25)1 25X L J;JEC E I O INTERIM FINAL 1. The prototype high-intensity light source has completed operational evaluation in conjunction with the prototype 1SX eyepieces and 2.6X objective lenses developed by Results of this evaluation indicate that with representative imagery, and with the new 15X/ 2..6X optics, a light intensity of 6000 foot-lamberts appears sufficient. As a test instrument for this deter- mination, the prototype high-intensity light source has proven useful. '40 Z~VT;77- 2. The above evaluation did not relate to known image density of black and white film, intensity required for color film, or to the effect, if any, of the tungsten source of the high-intensity light source compared to the fluorescent source of the normal light table. An in-house follow-on effort-is contemplated, in conjunction with to expand the operational evaluation to include these para- meters. 3. Contractor's performance during this contract is considered above average. The problems of the development 25 were solved in a competent manner and all requirements were sa.tisfied. Reports were submitted as required and instruc- tions and requests promptly complied with. 4. Total Authorized Funds: Original Contract 25 Overrun 2/18/72 - Overrun 7/11/72 - S. I hereby certify that all deliverable items under the terms of this contract have been received. 25 ^ UNC LASS IF4fo roved For Release 20gfQ1p7 l:D4I RWP78B05171A000400020001-0 ^ SECRET