CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000400020003-8
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
February 1, 2005
Sequence Number:
3
Case Number:
Publication Date:
August 21, 1972
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 97.13 KB |
Body:
CONFIDENTIAL 620191 DA ^ UNCLASS FIED
CONTRACT I N3KCT I O-N
PORT
TO:
DATE
21 August 1972
INSPECTION REPORT NO. (If final, so state)
ESTIMATED COMPLETION DATE
1 October 1972
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
High-Intensity Light Sour(ee''
THE CONTRACTOR IS ON SCHEDULE
THE,CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
M
FUNDS 13 YE5 a NO IF ANSWER IS "NO" ADVISE REC.
Y E S_ N
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
9 g g
7
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED
DITIONAL FUNDS INVOLVED.
99%
PER CENT OF FUNDS EXPENDED -
HAS AN INTERIM REPORT. FINAL
REPORT. PROTOTYPE. OR OTHER END ITEM BEEN NECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? a YE5 1 No (If yes, give details on reverse side )
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? El YES fJ No
(If yes. indicate items. quantity,
and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0 YES Iq NO
NOTE .
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
^ COST 0 k--RD PERFORMAN
CE ^ OECP FF
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
FEE
OVERALL PERFORMANCE OF CONTRACTOR
1. ^ OUTSTANDING 4. ? ABOVE AVERAGE 7. UNSATISFACTORY
AVERAGE
2. El EXCELLENT S. El
3. D VERY GOOD 6. ^ MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION
a CONTINUE AS PROGRAMMED
^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
0 CLOSE OUT
a OTHER (Specify)
f
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE
ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
Declassification Review b
NGA/DoD
2 August 1972
y
FOM USE
12'67 1897 EDITIONS ^ UNCLASSIFIED ? CONFIDENTIAL ^ SECRET 12-36)
SECRET
NARRATIVE RRT I J INTERIM_ ^ FINAL
1. has designed, developed, and demonstrated a
tracking light source that appears to be satisfactory in every
respect. The sources are capable of producing better than
25,000 foot-lamberts of high quality illumination, and tracks
the optics satisfactorily within areas of eight inches by
fourteen inches on both sides.'of the .split in the middle of the
table. Prpject Manager, appears to be doing
a very mine fob with a development faced with severe physical
constraints.
2. The prototype light source, retrofitted to a GFE
1540.Light Table, is expected to be delivered and ready
tor testing and.evalluation in mid-September.
Original Contract
Overrun 2/18/72
Overrun 7/11/72
(] UNCLASS IF'
CONFIDENTIAL ^ SECRET