CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000400020003-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 1, 2005
Sequence Number: 
3
Case Number: 
Publication Date: 
August 21, 1972
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000400020003-8.pdf97.13 KB
Body: 
CONFIDENTIAL 620191 DA ^ UNCLASS FIED CONTRACT I N3KCT I O-N PORT TO: DATE 21 August 1972 INSPECTION REPORT NO. (If final, so state) ESTIMATED COMPLETION DATE 1 October 1972 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE High-Intensity Light Sour(ee'' THE CONTRACTOR IS ON SCHEDULE THE,CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED M FUNDS 13 YE5 a NO IF ANSWER IS "NO" ADVISE REC. Y E S_ N OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON 9 g g 7 REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED DITIONAL FUNDS INVOLVED. 99% PER CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN NECEIVED FROM THE CONTRACTOR DURING THE PERIOD? a YE5 1 No (If yes, give details on reverse side ) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? El YES fJ No (If yes. indicate items. quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES Iq NO NOTE . IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ COST 0 k--RD PERFORMAN CE ^ OECP FF FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ? ABOVE AVERAGE 7. UNSATISFACTORY AVERAGE 2. El EXCELLENT S. El 3. D VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION a CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 0 CLOSE OUT a OTHER (Specify) f IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR Declassification Review b NGA/DoD 2 August 1972 y FOM USE 12'67 1897 EDITIONS ^ UNCLASSIFIED ? CONFIDENTIAL ^ SECRET 12-36) SECRET NARRATIVE RRT I J INTERIM_ ^ FINAL 1. has designed, developed, and demonstrated a tracking light source that appears to be satisfactory in every respect. The sources are capable of producing better than 25,000 foot-lamberts of high quality illumination, and tracks the optics satisfactorily within areas of eight inches by fourteen inches on both sides.'of the .split in the middle of the table. Prpject Manager, appears to be doing a very mine fob with a development faced with severe physical constraints. 2. The prototype light source, retrofitted to a GFE 1540.Light Table, is expected to be delivered and ready tor testing and.evalluation in mid-September. Original Contract Overrun 2/18/72 Overrun 7/11/72 (] UNCLASS IF' CONFIDENTIAL ^ SECRET