(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000400020031-7
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
7
Document Creation Date:
December 28, 2016
Document Release Date:
February 1, 2005
Sequence Number:
31
Case Number:
Publication Date:
March 17, 1972
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 316.92 KB |
Body:
Approved or Release
USA Comics Um ice Clr
Office Ior 72
NAS Mesa P msld, Iti- '
WG#shj
&W*WVW as asawd? - t1) .
"oss Of
f"" to
Declassification Review by NGA/DoD
Nosy truly gyro`s?
Approved For Release 2005/02/17 : CIA-RDP78BO5171A000400020031-7
25X1
MONTHLY TECHNICAL PROGRESS REPORT #10-ATTACHMENT #1
Testing of the background lighting system was started during this reporting
.period and is continuing. A large majority of procured components have been
received and mechanical assembly is approximately 75% complete. The program is
on schedule with no problem areas anticipated.
The attached photographs show several views of a high intensity light source
partially assembled and situated within the framework which houses the X-Y motion
mechanisms and seats over the light tray (not shown).
Technical Progress for the Period
o Testing of background lamps in progress.
o Majority of procured components received and inspected.
o Mechanical assembly 75% complete.
.0 Electrical harness diagrams are completed.
Objectives for the Next Period
o Completion of mechanical, electrical assembly and installation of
HILS system into GFE light table.
o Preliminary system tests.
o Completion of draft of ATP.
o Completion of draft of operating manual.
Approved For Release 2005/02/17 : CIA-RDP78BO5171A000400020031-7
Approved For-Release 2005/02/17 : CIA-RDP78BO5171A000400020031-7
ATTAC .'. z:: T A
25X1 ita.:.e of Contractor
F-
.:0::TELY CC::-ACT SLATUS REPOT NO. 10
For Period 1 February .1972 to 29 February 1972 Date: 13 March 1972
25X1, Contract ::o. Task ::o. Project No.
Period of Contract 26 Apri 1 1971
30 May 1972
25X1
Amount of Obligation
and/or Ex.e nditwres This Period:
Amount of Obligations
and/or Expenditures to Date
Estimate of Funds to Complete :
Percentage of Funds Expended to date 92%
Percentage of Work Completed to date 87%
(Note: All amounts shown must include
overhead, G&A; handling charges, fees, etc.)
(Attach sheets if necessary)
2. Can the Contract be-completed in the authorized time? Yes
3. Can the Contract be completed with the authorized funds? No**
Comments: (Attach sheets if necessary) '
** Request to Contracting Officer for additional funds as a result of 1971 higher indirect rates has be9X1
25X1 submitted. Reference Oletter MLT-2023-L-6354 dated 14 January 1972. A reply has been
received from the Government and this matter is in the process of negotiation. Amount of $
25X1 is based upon requestedi in said letter.
Technical Progress in Period: (Attach sheets if necessary)
SEE ATTACHMENT #1
Objective for the Next Period: (Attach sheets if necessary)
SEE ATTACHMENT #1
25X1
Submitted by
Approved For Release 2005/02/17 CIA-RDP78BO5171A000400020031-7
SNAP IN ELH LAMP
%A/I T11 1 1% AAI nn/1n
FILTERS / ABSORBER
COLD MIRROR
Approved For Release 2005/02/17 : CIA-RDP78B05171A000400020031-7
HIGH INTENSITY LIGHT PACK
Approved For Release 2005/02/17 : CIA-RDP78B05171A000400020031-7
COLLIMATOR
~? ~01fli7 ~~#A=RB~`8B8547'FAf}@0#)0820031-7
SNAP IN ELH LAMP
WITH COLD MIRROR
IRIS CONTROL FRESNEL LENS
AND LENSES COLLIMATOR
IRIS DRIVE COLOR COMPENSATING
MOTOR FILTERS
HIGH INTE IGHT PACK
COLD MIRROR
Approved For Release 2005/02/1 .-C RDP78B05171A000400020031-7
Approved For Release 2005/02/17 : CIA-RDP78B05171A000400020031-7
COLOR COMPENSATING
FILTERS
FRESNEL LENS
COLLIMATOR
HIGH INTENSIT'P LIGHT PACK
SNAP I N ELH LAMP
HEAT WITH COLD MIRROR
ABSORBER
Approved For Release 2005/02/17 : CIA-RDP78B05171A000400020031-7
SNAP IN ELI] LAMP
WITH COLD MIRROR IRIS CONTROL FRESNEL LENS
AND LENSES COLLIMATOR
. I
COLOR COMPENSATING
HEAT ABSORBER
RIS DRIVE
I
MOTOR
HIGH INTE LIGHT PACK
Approved For Release 2005/02/1 '' RDP78B05171A000400020031-7