ACCEPTANCE TEST PROCEDURE FOR LIGHT TABLE MLT-1540

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000400030003-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 6, 2005
Sequence Number: 
3
Case Number: 
Publication Date: 
October 30, 1970
Content Type: 
REQ
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000400030003-7.pdf316.6 KB
Body: 
Approved For Release g DOCUMENT NO. 005/06/23: CIA-RDP7$B0517f004 0030003-7 CLASSIFICATION ~- ACCEPTANCE TEST PROCEDURE FOR LIGHT TABLE MLT-1540 30 October 1970 REVISION (See last sheet for record) SERIAL NUMBER"__dL ?Q& r TEST BY - J DATE p TIME /3. 40 Declass review by NGA/DoD This item has successfully performed to all of the requirements as itemized and checked in the body of this procedure. Date Signature TAT USED ON MLT-1540 Approved For Release 20 5/06/23 :CIA-RDP78130517 0040 CLASSIFICATION SHEET NO. 2 1.0 PURPOSE The purpose of the Acceptance Test Procedure is to verify that the Modular Light Table, MLT-1540, meets its functional and performance requirements. STAT 2.0 EQUIPMENT REQUIRED 2.1 MLT-1540 Lomplete perrawing No. 2.2 Test film as follows: EID 9.5 inch wide, 4 mil base, 1,000 foot roll 2.3 Empty take-up spools (This should be commensurate with the number of films required as listed above.) STAT STAT 5 inch film, 1,000 foot, 2 rolls 70mm film, 1,000 foot, 2 rolls 2.4 Stop watch 2.5 GFE foot lambert meter (Weston Model 759) 3.0 ACCEPTANCE TEST Completion and verification of each of the following items shall be noted by the inspector's stamp or initials in the space provided. 3.1 Mechanical and visual inspection.. The MLT shall be carefully examined to determine conformance to the requirements of =Drawing ; Outline Drawing. Moving parts such as covers, latches and gear mechanisms shall be checked to assure proper fit and operation without sticking or binding. Quality of workmanship, proper materials and finishes, nameplate. installation, etc. shall be verified. Approved For Release 2005 .3.2 3.3 Turn lights on to max intensity, both sides. a) Record time turned on. 3,4 Operate the elevating mechanism. Olt, "001"? - 7T 3.5 Check operation of manual hand elevation for smoothness of operation. 3.6 Check film rollers for smoothness of operation and surface. I 3.7 Check that the coating on bottom cover is in place and smoothly applied. 3.8 Check that wheel locks operate properly, both for rotation and rolling. 3.9) Mount two 1,000 ft rolls of 70mm film on table, dual __ _ web configuration, emulsion up. L06123: fCIA-RDP.78B051700040 CLASSIFICATION 1 SHEET NO. 3 Connect table to regulated 117 VAC, 25 amp power source. a) Note max and min distance from floor. (Max = 40" Min = 22") a) Note time to rewind completely, both rolls at some time, in opposite direction. (:!~ 3 minutes) b) Note tracking characteristics. c) Note effect on stationary web when other roves and stops rapidly. Check both webs. (No interreaction) 3. 10 Mount two 1,000 ft rools of 70mm film on table, dual web configuration, emulsion down. TAT Measure min speed on front roll ohly. (Smooth control from 0 to 1 inch/ rn,n,) Note time to rewind completely, both roofs at same time, in opposite direction. (-:55 3 minutes) DI Note tracking characteristics. 69/5 t/ ? J , (-P6* 4`2r 0 Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030003-7 STAT, , DOCUMENT NO. Approved For Release 2 05/06/23: CIA-RDP78B05174P0040 030003-7 I i CLASSIFICATION Note effect of stationary roll when other moves and stops rapidly. Check both webs. (No iterreaction) 3. 11 Mount two rolls 5" film (1,000 ft) on table, split vertical mode, emulstion up and emulsion down. a) Operate to insure split vertical capability. 3.12 Mount 1,000 ft roll 9 1/2" film, emulsion up. a)' Note time to completely rewind. (< m/n.) b) Operate take-up mechanism. Note max capability. '(? 76 inches) c) Scan slowly with loop take up. Note tracking problems. d) Start and stop rapidly from full speed (no loop). (No slack loops or excessive tension) 3.13 Operate tilt mechanism. a) Note that full tilt provides15?+1d slope. b) Note that horizontal table is level +1 0 3.14 Operate carriage motion system with table horizontal, and weight of optics on carriage. Set friction locks. a) Note force required to move carriage with locks set. (?10lbs) Release friction locks. b) Check operation of adjustable stops, "x" direction. STAT 4 V Approved For Release 2 '16 t;k baekld,4 lwe` r~ /t /X11 lGea - i) Note force required to move carriage with motors _ pduwered`in-x a y direction. 1~R,Q.2 'Pee, 1~~ 0140 h) Verify that-10 lbs. will not move bridge 1, It motors g) uetermine miri"spee y direc It on. r/ 05/06/23: 61A-RDP78B051 0040 CLASSIFICATION Check that "Y" motion cover full depth of the formats. . Ve" T) i`tloTe max speea,,y airection ( .. in/see/._ ____ / e) D termine mn