PROGRESS REPORT ON HPSC PROGRAM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000600010038-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
March 31, 2004
Sequence Number:
38
Case Number:
Publication Date:
August 25, 1970
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 197.3 KB |
Body:
Approved4or Release 200SWB JA-RDP78B05171A000600010038-2
/T /P/Y
25 Auguat 1970
d1nating Group
25X1
25X1
)t underway on l1~ August. Now that
lied, the computer prog'sm bec roes the new
achedt:led completion date of 16 October.
25X1
25X1
~E4 ee t with the L-Jpeople
e tan and procedures. The
J=e, eusmtary erieci out dated 3 f w ust,
testing were re+`iewed in a four hour
have resolved moat of the major diffi-
25X1
25X1
5X1
5X1
5X1
5X1
45X1
t on HPSC
1. Messrs. isited NPIC on 19 and
20 August 1970. They report that the HPSC is essentially on the schedule
distributed to the Coordinating Group on I r-) June 1970. The optics have
been installed and checked out. They report that the systems re solvea
1,ooo line pairs/mm with white light. The correlation system has been
checked oat in a test ivture and is performing to epeeifications. The
ter
u
t
probably 6-20 November) .
seceptsnee testa for about two weei-s during the rs 1
.
he conap
ire h-az been re ei -ed and inat ailed in
er gram work on the HE'S system was scheduled
duled at 0 Three weeks of this is =running
U U0 L. debugging the TIM system. Following this, WIC pe
404 rsonnel t
prepare the test procedures and submit
to 14 September 1970.
4. ~(as provided some unclassified frame and pan photo
xnrormtiatics to use in c seeking out the meter program.
'ay
25X1
25X1
25X1
will se conies of operfatio l imagery early in
fir. copies will be sent, one for =to use in checking
out the various systems and the second copy to be used by EPIC in the
preacceptaaee tests.
r, + ,+ 1-max ra:tor training will take place at
0
on the r ss of the computer prigs rsua.a- ; I"
b r to t"
N
i
tests.
m
re
o
per: for fill return to 0 in
?xcillk , ;"n au1c+^atic
Approved For Release 2004.1 RDP78B 510 ni d `~ Oi
a[~R[ ate,., .....
for a week
a later date
ently underway.
,rt in the Pre..
Declass Review by
N
10038=2A/DOD
5g~RET
CApproved-For Release 2004 : GIA-RDP78E 5171A000600010038-2
take place at I taming the
will h-ja?e to be fired up a little later
on the present work being done in outer pro-
0
will also be worked
f A of a
Jo provide certain mate model infor-
SDto discuss the type of inst
purchase to do routine maintenance and trouble
Log building consultant) met
4th to es a s ll changes required in the
olean ro to dec ate the recently approved 16K computer memory
storage . for the Ho 11. 516. Indications are that this can be easily
secs ltehe 1. A tote of the clean roam brought to light that a slight
change in a cable tray will be required to acs to the left illumina
tion system of the Ham. =std favorably impressed with the clean
ro
32.
routine
reenta of completion for the
is 91%.
Approved For Release 2004/05/05 : CIA-RDP78BO5171A000600010038-2
as Report on H Program
absence of
met wit.
attanTt to provide replacement test tar is for those
by during the Optic-"l tests at
25X1
25X1
25X1
25X1
5X1
SECRET