REQUEST FOR APPROVAL OF A CHANGE-IN-SCOPE TO CONTRACT (Sanitized) FROM FY-1971 RED FUND
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000600010053-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
March 31, 2004
Sequence Number:
53
Case Number:
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 198.17 KB |
Body:
ApproMd For Release M105 : CIA-RDP7VS05171A000600010053-5
NPIC/ G- 25-70
ational Photographic
ation Center
uest for Approval of a Change-?in- c
This memorandum requests approval for the cc.-nit-
; for Z- l97l. The specific request
stated in Paragraph 7.
2. NPIC currently has a fixed-price contract with
to fabricate a high precision stereoc v-parator
SC) . The H C will provide 1_1.'G/P' D with a capability
of obtaining sub icroa titer (micron) accuracy in - asurin .
conjugate imagery of different scales and varying perspec-
tive distortions. To obtain this high degree of accura
this instrument must be used in a clean roan, and air use
to cool various parts of the instrument nust be processed
(temperature and hu i:.idity wise) by an environmental control
unit. TS C/S D has had a clean room constructed in UPIC to
house the .:PSC and has provided a specially, configured en.-
vironnental control unit to process the air .
is in the final stages of fabricating the, UPSC at t.. e
plant. 0 has a clean roar. to house the ?CSC but does no,
have a suitable environmental control unit or the facilities
to accommodate the unit fabricated by TS C/SS ). The HPSC
annot be operated safely or accurately without using a
processed by an environmental control unit.
3. In order to facilitate the checkout of the forty
the HPSC and to allow 11:11,11C/ RED and ESD p-0
sonnel to perform preacceptance tests at the Oplant,
is proposed that a change-in-scope be made to Contract
to allow 0 to provide the necessary facilities to accarfp-
odate the TSSG/ SD environs mental control unit. The work
Declass Review by
NIMA/DOD
5X1
25X1
5X1
25X1
01
Sr a U, '. rt 1re7i 3C1CCIIItiC
Approved For Re ease 2004/05/05 : CIA-R 174A 00600010053-5
Approved For Release( Q 9('05: CIA-RDP78B05171A0006OOO1OO53-5
a. the purcaas
tower,
25X1
accomplish
25X1
25X1
25X1
contract
to
ion of a cooii na
b. the installation of a stable
C? p+leovl.c.i
nct ions r and
environmental control unit to
d.
is no
in-scope.
a modification to their
only contractor ccnsi
by , G/ D and is at th
: ant .1 iv ra.:
clinical risk involved in the
4. rya en irouAent x.l control unit has ;.:.ac n
5. There is no artici a.
since, by its nature, this is
change-in- scope. h.e security cla_ssifi.c ti
sage as the origin 1 contract.
c zane
to t; i s W.
6.
monitor for the or = :na contract any
7. It is
change-in-scope
and to c1hr,
r'orn. FY-l971 !'un'9s
f the following
0
rante l
in an a'-?Otnt not to e ceed,
C .te waory VI ".Y--71 Funds.
Chie s Techni al. :'aerv ces ;,, ,.=art rr'oup r N.3:"1.&.
5X1
25X1
5X1
S
Approved For Release 2004 7O5: CIA-RDP78BO5171A000600010053-5
Approved For Relea 2004/05/05 : CIA-RDP78S05171A000600010053-5
I)r
SECR
ET
S:3J'. CI'. Re-quest for Approval of a Chanqe-in--cope to
25X1
Contract
trn .
Attachments.
1. Proposal
2. 'o 2420
Director
i:onal. Photographic Interpretation Center
Distr. ibutiori
Original -- NPIC/T CSC/SC&P (After approval)
2-NXC/D
2 - ZIPIC/xS
2 - EPIC/T S(,,',/r-E:J)
25X1 NPIC/TSSC/RED/sD14
25 June 70)
SECRET
Approved For Release 2004/05/0 CIA-RDP78BO5171A000600010053-5
X1