HIGH PRECISION STEREO COMPARATOR PROGRAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000600010067-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 31, 2004
Sequence Number: 
67
Case Number: 
Publication Date: 
April 20, 1970
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000600010067-0.pdf177.01 KB
Body: 
Approved.. For Release 29 997 TCIA-RDP78BG5171A000600010067-0 Q SS*/.020-70 Q April 1970 SUBJECT: ion Stereo Comparator Pro; ner al Manager of 0 telephoned the technni- fra monitcsx` w:nnd pissed sane te e attthe information Pl.aantein ac0perfor~irs from .{. the ccep nce tests on a ~:ei.optical system. 2 1 3-10 ,pril 1970, mostly on the main sc,.::nnminn?; branch 0 f ran some tests, but these r optical system. The reticle branch has had major rework done on It and had not been instilled in the optical system until the week - A 13 April 1970. Tice optic i potentiometer parameter tests, the final tests of the fully ~. + sembled optical system, will start between the `) to 27 ."April and will be completed by 14 to 6 May. These tests exercise all the c .n_ ponent s and subsystems of the optical system. a 3 to 10 working days 3. The delay in the tests have been due to problems with: the reticle branch, limit switches, and the main as system. v been completely redesigned and h as n. The reticle systems rebuilt in the -ast two months. Tt.e original reticle was un.iccept- able clue to ill defined edges. II states that the new reticles look good, but the range of reticle sizes All h ve to be limited to 2.5 times diffrac t? on limit (Specs called for juzt bo aove d -c~ fraction limit to 14 times diffraction limit). Just ter - in the al one of t': e eye_ Lion limit gives a lot of 35 micro-- t dot sire of 1 /it Uzi c piece. This will give .af equivalen at the film pl .ne at 200X m if`?ic .tion. This is based o method of computatiozn% Declass Review by NIMA/DOD x. 0 to pack the MY now expect to ship the optics by ..air freight on 19 ay _.., , ...1 a"wa t l In shin on 30 April. Approved For Release 2004/01 ", RDP78B05171 ~ Gecf:.==tie" `r:lti '!e!t3:ila(!~ 5X1 ?x1 5X1 25X1 25X1 Approved For Release 2004/05/05 CI4-RDP78B,a171A000600010067-0 High Precision Stereo Comparator Program Example: 3 _ U - 1.75 At 2.5 diffraction limit the size of reticle in the plane of the eyepiece will be 88 micrometers. This will have to be discussed with IEG/PIED. b. There have been some problems with interference with the limit switches but this is being resolved. has been working with ~to insure that the moving operation. At one point, two elements move to within 2 thousandths of an inch of each other and safeguards must be installed to prevent their ever colliding. IS has run resolution tests on the main scanning system with both the and 80mm objective lenses. He reports that both exceed specifications. He also reports that some vignetting is visible at 20X in the 20X to 20OX zoom range. He would like to know if limiting this zoom range to cover 25X to 20OX and keeping the other range from lOX to 10 OX is objectionable to NPIC. This will also have to be resolved with lEG/PHD. In regard to the correlation system have agreed 5X1 5X1 5X1 on the main points for an acceptance test gill start the acceptance tests at the 0 plant on 21 April 1970. 6. The slippage in the optical schedule will cause the entire program to slide. A new schedule will be produced for preacceptance tests at when more is known about the results of the optical tests. The start the preacceptance tests a'Iwill definitely slide from 15 June until sometime in July or August. 7. The technical monitor will visit "from 27-29 April 1970. At this time it is hoped that firm training and test schedules can be worked out. 5X1 5X1 5X1 Distribution; Original - Route & File IAPp>~F 3... NPIC/PPBS {Att. 2 . IC/IEG/PPHD (C 2 - IC/TSSG ESD EPIC/TSSG SSD 5X1