PROPOSED CONTRACT WITH THE (Sanitized) FOR THE CONSTRUCTION OF A PROTOTYPE 1540 LIGHT TABLE, MODEL II, AT A COST OF(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000800050043-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
April 18, 2003
Sequence Number:
43
Case Number:
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 297.16 KB |
Body:
25X1..
Approved Fort
e of j CIA-RDP78BO51 1A000800050043-0
~Rf t - .
Proposed Contract with the
of a Prototype 15+0 Light Table, Model It
for the Construction
2:X1
2 X1
3. In response to our request, both I Isubmitted propo- 2 X1
tale that were technically satisfactory to the -esearc en Engineering
25X1 Division. However. whereas II submitted a cost proposal that was
25X1
considered to be satisfactory, the cost proposal submitted by "was con- 21'_)X1
siderei to be unreasonably high. In view of this cost disparity, the
decision was made to enter into a contract with 0 at the cost sub- 21'_)X1
mitted in their proposal, and to then renegotiate with =in an attempt to 21'_)X1
arrive at a more satisfactory cost proposal. This approach was selected
due to the tight scheduling required to insure that the 15+0 tables will be
available in production quantities in time to handle the aterials. 2 X1
4. Buccesstul completion of this contract will result in a prototype
instrument, maintenance manuals, operating instructions, estimated costs
of production instruments, and any special tools required for operation or
maintenance,
5. Acceptance of the prototype by the operating divisions as being a
desirable equipment could result in a production procurement of substantial
numbers of instruments at a total estimated cost of perhaps or
2X1
more. The technical risk involved in developing this second model 1540 Light
Table is considered to be minimal because many of the basic technolo ies were
developed on the earlier VIC contract with the for X1
the first 1540 Light Table.
contract with the
7. It is requested that approval be granted to negotiate a fixed priced
Chief, Technical Services & upport Group,
C
Director
National Photographic Interpretation Center
Distribution:
Original - NPIC/TSSG;J'SC&PS (After approva]_ )
i - IIC/QD.r
1 - ~/T G
l - HI'IC,'G/tEp
X1
X1
X1
Approved For Releas 3/0 / 4 : CTi -RDP78BO5171AOO 800050043-0
25X1 Approved For Release 2003/05/14: CIA-RDP78BO5171A000800050043-0
Approved For Release 2003/05/14: CIA-RDP78BO5171A000800050043-0
L4SSIFIE't3 CONi-IDENTIAL
t'E QUEST PROCURE SENT DI v I S
(other than property or building; main ten an cc and rcpnirs)
`F -:C -SG/- D 55-6001-70
r ilL
PROJECT TITLE PROJECT OR CONTACT OFFICER
Akt tLLightaTablef
CONTRACTOR (if known)
CESE AR CH/DEV
y I GRANT
R E P A I R
~, Al1 N I I. N A N CF.
TRANSFER OF FUNDS TO
OTHER GOVT. AGENCY
(specify if applicable)
SECRET
APPLICABLE ONLY TO REPAIRS AND MODIFICATIONS
TECHNICAL INSPECTION 15 REQUIRED BY
I CERTIFY
AMOUNT OF
AVAILABLE - CHARGE T O FAN
siiecity)
~ AR E
40
2-55---5
SIGNATURE OF BUDGET OFFICER DATE
L._ 1 ._---
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
OF SERVICE TO BE PERFORMED
SUBSTANTIVE TITLE AND/OR D
Manufacture of a prototype Split-Format 1540 Light Table. The contractor will
also supply operating and maintenance manuals, required reports, estimated costs of
production quantities, any special tools required to maintain the equipment, and
spare parts necessary to maintain the equipment in the field.
(See reverse for specific information
required on R&D requests.)
DATE RECEIVED IN PD
Approved For Releas
f FOkM 242 .EPLAC E S F O RMS 3- 67 V L420 AND 241 6 UNCLASSIFIED
CONFIDENTIAL
F7$ X1000800050043-0
25X1
25X1
SECRET (specify)
)
0 (specify
=? [ . A S S I CONFIDENTIAL ATTACHMENTS OR STATEMENTS ~_ I btc"Kt t
JUSTIFTCATION FOR SOURC PPJrd elease 2003/05/14 :CIA-RDP78B051 A000800050043-0
2 5X1 successfully produced a previous prototype Split-Format 151+0 Light
Ta e.
1 2. PROPOSAL
25X1
has submitted a proposal to accomplish this work that is both techni-
cally and financially acceptable.
3. DELIVERADLE ITEMS
REPORTS REQUIRED
F-1
F]
HARDWARE (state type and number) One prototype instrument, operating and maintenance manuals,
estimated costs of production instruments, and special tools required to main-
OTHER tain the instruments, spare parts necessary to maintain the equipment in the
field.
S S. GFE REQUIRED
Approved For Release 2003/05/14 ? CIA RDP7RRO5171 AOOnRnnnsnn43-n
l UNCLASSIFIED ? CONFIDENTIAL [J SECRET
Acceptance tests will be performed by the technical representative at the com-
pletion of the work to insure that the instrument meets the technical require-
ments.
Final acceptance here.
(specify)