PROJECT REQUIREMENTS UNDER AL-14
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000800070088-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
November 17, 2003
Sequence Number:
88
Case Number:
Publication Date:
May 23, 1969
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 172.22 KB |
Body:
Approved For ReleaW2003/12/l B-978BO5171AO0080_0070088-9
NPIC/TSSG/DDD-1623-69
23 MIay 1969
ME4ORAIMUM FOR: Chief, Development & Engineering Division, TSSG/NPIC
SUJ:CT : Project Requirements Under AL-14
I. The following projects are recommended for execution under the
AL-14 program with F7 -1
a.. Is a Enhancement Studies s Using RiRg Smear Techniques
nc?
(1) Period of execution - 12 months. Commencing - 15
'tine 1969.
(2) Cost
0
(3) Description: This project is essentially a re-
tivation of PAR 251, cancelled in December 1968
ft
a
er an
evaluation which concluded that the process, as demonstrated,
did not provide sufficient image improvement to proceed and.
if required, could be designed and constructed in-house. The
first objection was based on only one test; the second objec-
tion fails to take advantage of the expertise developed by
II Current R&D planning necessitated a re
e
l
-
va
uation of
the project and as a result, reactivation is recommended.
Successful completion of this project will provide NPIC with
rc..
rent on various types of operational imagery, 'M The of project
ect
provides for a unique data base or point of departure for
NPIC. All new enhance=zit techniques could be evaluated and
s
a ima
e
..:-._.___a
aa
g
r . Intl
present there is no such capability. To acquire it digitally
or optically would be very costly and time consuming. With
this capability to produce enhanced images on a controlled
basis, a variety of experiments could be performed to answer
some of the critical questions concerning the value of an
enhanced image to the photo interpreter; i.e., under what
conditions does it help significantly? Does it enable the
PI to work faster, easier, more accurately; are different
degrees of enhancement critical; etc.
Declass Review by NIMA/DOD
GROUP 1
Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800070088-9 Excluded from antmattc
gewngrydiag aed
dSC~BS~iijSailnr ._1
P R E1: ..w_
SECRET
Approved For Release 2003/12/19 : CIA- DP78BO5171A000800070088-9
'AW 1"W
SUBJECT: Project Requirements Under AL-l1
b. Improvement of the Precision Enlarger Fluid Injection
stem PAR 252)
(l) Period of execution - 9 months. Commencing - 15
June 1969.
(2) Cost - Study-
Equipment-LL=
(3) Description: This project will result in an im-
proved fluid injection system applicable to both the Beacon
Precision Enlargers (BPE) and the 10-20-40 Precision En-
largers. Corrosion and mechanical failures in the present
systems necessitate this action. Initial efforts by F
indicate a good chance of success. It is anticipated that
at the conclusion of the project improved units will be
furnished for the two BPE's and the three 10-20-10 Enlargers
in NPIC.
c. Ste 'eogram Maker Feasibility Study
(1) Period of performance - 9 months. Commencing - 15
June 1969.
(2) Cost - (est).
high resolution printing. Present operational methods depend
upon the photo interpreter using high performance, high cost
(3) Description: This project is a theoretical inves-
gation into those aspects concerned with optically corrected,
oscopes for his interpretation. It is felt that a
printer which furnishes a high quality, optically corrected
output could service 20-30 interpreters, thus reducing the
requirement for many of the costly stereoscopes. The study
phase will investigate the optics required for optimum en-
largement, anamorphic correction, lamp sources, correlation
circuitry, variable magnification, and like parameters. This
effort is anticipated to furnish a comprehensive report which
will identify those areas of potential danger in design appli-
cation as well as areas of probable success.
2. Approximately 0 of AL-14 contract funds are still available
for allocation to study efforts in the current fiscal year. Query of the
contracting officer indicates that he is very desirious of terminating this
Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800070088-9
SECRET.
25X1
Approved For Release 2003/12/19: CIA-RDP78 5171A000800070088-9
w
SUBJECT: Project Requirements Under 4-14
contract at the end of FY-69.y cable dated 9 May 1969, has agreed to
the price and dates on PAR 251 an PAR 252. As a result of a meeting with
them on 19 May, they are investigating the Stereogram Maker approach and
will submit a PAR on that effort shortly.
25X1
DED/R&DJ3-I
Distribution;
Orig - Addressee
1 - IUD Chrono
2 ,. DED/ROD13-I
NPIC/TSSG/DED/R&DB-I (23 May 69)
Approved For Release 2003/12/19: CIA-RD~V14 x000800070088-9