MONITOR VISIT TO(Sanitized) IN REGARD TO THE HIGH PRECISION STEREO COMPARATOR PROGRAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000800070102-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 17, 2003
Sequence Number: 
102
Case Number: 
Publication Date: 
May 8, 1969
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000800070102-2.pdf188.38 KB
Body: 
Approved For Release 03/12/19: CIA-RDP78BO5171A000800070102-2 :Cf TSSG/DED-1.602-6g 8 `1969 IMORANTUM FOR THE RECORD SU'ECT: Monitor Visit to in Regard to the Hi h C g Precision Stereo o orator Program 1. The followin g named TS indicated SG Pero el visited ; ril 21 on the dates 25X1 April 22 25X1 ? On 21. Affil, 1'ep0rt a h the roject ma n is monitor visit t nager, gave an oral I st t for the e i 4 25X1 r a od 1 es that they are n -1$ April -L>1051. ainire ox p have the tptical system completed and afanned schedule and riri.l, the acceptance tests the fi o start th ~ A=t 25X1 rst eir would not b part of November e surprised . stated that he if li s d h 25X1 ppe sc edule.. He said that iat abou a month on the planned has experienced l FKft50 g ass used in the zoom system, that the oe trouble working in cementing some of the optical elements together as cemryi used which resulted in slipping of some elements bile i Slow r dthat lens sent out for coating were scratched in shi 'rand that repolishing. papi ng and could require has finished the concrete slab arrangement that will hold the Optical bridge during tests of the optical system. vac The plant will be closed the entire month of August a ation (this has been for n reported in previous reports). has agreed to have an optical engineer and five technicians work roug this period testing components and subsystems for the optical system. The mechenical work at sent 0 about 8o% ~ is Progressing very well. has that are required, of t e cables, slip rings, small aotorsI etc. indicated that some of the material= ,rished to ship to to be included in the optical system is on the U.S. Government rt an List. This includes potentiometers, dial indicators, copper wire harness, etc. He also stated that a ment they hope to use at great deal of the test equip- ec4pes) is also on the e ~or the final tests (example: oscil,lo-All returned, to the U.S. at the completion-of the of thissubcontracte q pment will be sted that we attempt to get authorization so that permit for these items. exp may obtain an 0 xpoUort t Approved For Release 2003/12/19: CIA-RDP ?j?j;JWgpB970102-2 ~4T NIMA/DOD 25X1 25X1 SECRET Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800070102-2 J?1 Igave a brief _progress report on the Image Analysis System subcontract with xpects to have this nnm?1 ra+=A 4., ass.. -- developed on this task. '" ~J " V tia61G A-,-vy, arv enamor problems have LOA I . On the morning of 22 April, the project manager described the operation of the stereo cpmparator, conducted a tour of the Clear Room