MONITOR VISIT TO(Sanitized) IN REGARD TO THE HIGH PRECISION STEREO COMPARATOR PROGRAM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000800070102-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
November 17, 2003
Sequence Number:
102
Case Number:
Publication Date:
May 8, 1969
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 188.38 KB |
Body:
Approved For Release 03/12/19: CIA-RDP78BO5171A000800070102-2
:Cf TSSG/DED-1.602-6g
8 `1969
IMORANTUM FOR THE RECORD
SU'ECT: Monitor Visit to in Regard to the Hi
h
C
g
Precision Stereo
o orator Program
1. The followin
g named TS
indicated
SG Pero
el visited
; ril 21
on the dates
25X1
April 22
25X1
?
On 21. Affil,
1'ep0rt a
h
the
roject ma
n
is monitor
visit t
nager, gave an oral
I st
t
for
the
e
i
4
25X1
r
a
od 1
es that they are n
-1$ April -L>1051.
ainire
ox p
have the tptical system completed and afanned schedule and riri.l,
the
acceptance tests the fi
o start th
~ A=t
25X1
rst
eir
would not b
part of November
e surprised
. stated that he
if li
s
d
h
25X1
ppe
sc
edule.. He said that iat
abou a month on the planned
has
experienced
l
FKft50
g
ass used in the zoom system, that the oe trouble working
in cementing some of the optical elements together as cemryi used
which resulted in slipping of some elements bile i Slow r dthat
lens sent out for coating were scratched in shi 'rand that
repolishing. papi ng and could require
has finished the concrete slab arrangement that will hold
the Optical bridge during tests of the optical system.
vac
The plant will be closed the entire month of August a
ation (this has been for
n reported in previous reports).
has agreed to have an optical engineer and five technicians work
roug this period testing components and subsystems for the optical
system.
The mechenical work at
sent 0 about 8o% ~ is Progressing very well. has
that are required, of t e cables, slip rings, small aotorsI etc.
indicated that some of the material= ,rished to ship to
to be included in the optical system is on the U.S. Government
rt an List. This includes potentiometers, dial indicators, copper
wire harness, etc. He also stated that a ment they hope to use at great deal of the test equip-
ec4pes) is also on the e ~or the final tests (example: oscil,lo-All returned, to the U.S. at the completion-of the of thissubcontracte q pment will be
sted
that we attempt to get authorization so that
permit for these items. exp
may obtain an 0 xpoUort
t
Approved For Release 2003/12/19: CIA-RDP ?j?j;JWgpB970102-2
~4T NIMA/DOD
25X1
25X1
SECRET
Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800070102-2
J?1 Igave a brief _progress report on the Image Analysis System
subcontract with xpects to have this nnm?1 ra+=A 4., ass.. --
developed on this task. '" ~J " V tia61G A-,-vy, arv enamor problems have LOA I
. On the morning of 22 April, the project manager described the
operation of the stereo cpmparator, conducted a tour of the Clear Room