REQUEST FOR PROPOSAL TO(Sanitized) AND STOP WORK ORDER ON AUTOMATIC STEREO SCANNER PROJECT (CONTRACT(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000800080039-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 18, 2003
Sequence Number: 
39
Case Number: 
Publication Date: 
April 9, 1969
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000800080039-2.pdf126.97 KB
Body: 
SECRET Approved For Release 03/12/19: CIA-RDP78B054W71A000800080039-2 9 April 1969 Chief, Special Contracting a Request for Proposal tv Ind Stop Work Eider on Automatic Stereo scanner Project 1. It is requested that be instructed to stop 2. In place of this activity, request frog 1 detailed proposal (technical, cost and scheduled or the ex or nc~:e 1hail; S eries Effort, revised proam describ d to the C-overnm~ert by n the meeting at Vl'IC on 7 April 1969. This program involves the use of Pentamirrors, Custom Relays in the Rhombqld and T p Support Arms and a redesigned irepiece and was estimated at a,nd 63 weeks to coapleta. 3. In addition to overfill cost figures for this program, , d First Milestone shall be added -- for the completion of Optic Tests o one optical path, approximately 6 months into this progrim. Specifically, must provide an accerate prediction of costs (Which we etro bei1 v should be no more than one half the overall Optics coe o the total approach, as estimated on 7 April 1969) to design and procure all, ne?, optics needed to complete the Automatic Stereo Scanner, conduct appropriate bench tests on one optical path, and demonstrate (on the bench) optical performance meeting existing automatic Stereo Scanner specifications. 4. The proposal should consider that mechanical redesign to support, align, and enclose the optical redesigns called for by this approach shall be limited (prior to this First Milestone) to the bare minimum necessary to the demonstration of satisfactory optical performance on the bench. 5. All other tasks to complete the project shall be scheduled and coated in series, fo1lo;ring successful completion of the Optical Bench Test. The Government will give its approval to continuz at each Declass Review by NIMA/DOD Approved For Releas --DBOJP 1 txyMH trs-' aianftc T2/ 9 : ~i ; n 78 05171 A000800080039-2 25X1 25X1 25X1 Approved Fjr Release and 9t l to Work. Ord er 25X1 Request for Proposa Automatic Stereo Scanner Prof ect Contract 125X1 on Milestone and no costa will be incurred -.-ithout that apProVL:L. Tu approval period in the case of the First Milestone (conclusion of the Bench Test) shall be two weeks. be delivered to us by the 25X1 t that this proposal from 6. Reques morning of i6 April 3.969 -- in lieu of a preparing for delivery by that date. ll other cost eetiin rtes they ire 5X1 refs Dwelcspren ne vision igal - Addressee 1 wC,SBC f D- DXDJR&D Br I NPIC/TSS(/DED/. Approved For Release 2003/12/19 : IA-RDP78B05171A000800080039-2 SECRET