STANDARD IMAGERY TARGET DEFINITION (SITD) PRODUCTION COSTS

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05703A000100030013-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 12, 2004
Sequence Number: 
13
Case Number: 
Publication Date: 
September 21, 1970
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B05703A000100030013-8.pdf130.85 KB
Body: 
~ovFol~Release 2004/03/26 ;~~P7~9~0~7~~,~001 ~~fE~MORANDUM FOR: f ~.,.? :. ~.2~.~ v o y.z ~ Approved For Fuse 2004/03/26: CIA-RDP78B05703~0100030013-8 21 September 1970 --`~ -~2)~~ otfier considerations (e, g.- lhere~has T~eeii discussion-of - a requirement to establish an automated storage and retrieval capability at such time as there are sufficient numbers of SITD's to warrant such a move. Costs have not been estimated for this requirement.) 4. It should be noted that NPIC produced SS6 SITD's for DIA in FY 70, and that DIA has estimated 400-500 would be required in support of their FY 71 Basic Reporting Program. SITD's are currently published as a page of a Basic Report, with a 135-copy distribution. SUBJECT: Standard Imagery Target Definition (SITD) Production Costs ~~ ~uv~.,: I ~r-- 1. In December 1968, NPIC completed an analysis of the impact that could be expected if it were to produce and print target delineation graphics. Included in that analysis was an assessment of direct labor, material, and equipment costs. Indirect costs Caere.not considered. Information relative to the expected quantities and types of target deli___neation graphics that would be needed during.the period 1969-1974 was obtained from the Chairman of the Data Base iVor}:ing Group. He estimated that the cumulative total could be frarn 1300-3800 for the five year period. The NPIC analysis estimated that the unit cost of producing a standard target delineation graphic was 2. In November 1969, the Center completed an evaluation of Standard Imagery. Target Definitions (SITD) as requested?by the EXSUBCC~1. As apart of this evaluation, production costs were included. A total of 57 SITD's were prepared, 40 of which were produced completely by NPIC acid 17 were `"supplied in cameia~ copy ready form-by~the"~1avy.~" "~The~SITD's-produced completely by NPIC had an average cost of ~ those received camera --~{opy-ready, f-r-om-Navy-,-cost NPIC ~ea - - o--produce. 3. As a result of the 1968 analysis and the evaluation of a limited s Ie produced in October 1969 it is considered that a unit cost figure of per SITD is a reasonable estimating figure. Total program costs wou e dependent upon (1) t}Ze number of SITD's to be produced and 25X1 25X1 25X1 25X1 Chief, Planning, rogramming u ge ing Staff .NPIC Approved For Release 2004/03/6 ~~~t{~,P78B05703A000100030013-8 .. MEMORANDUM FOR: J~M~- ~~~ y~ A~9ro'tAed ~?r F~~I~ 45Ap3V~6:CIA-RDP78B05703A00010~QQ~Oa Appi~n~t#'For Release~004/03%26TINA RDP78B05703A00 01 DATE Chief, PPBS Attached is an proach to the question of SITD costs. 2. You had earlier considered something along these lines for 0 info. 16 Sept 1970 3. The cost figure, hich originate in Bagnall`s office, w 'ved at by using the cost figure and an estimate of he nlunber of SITD` s to be prepared - which was supplied ciA~ pr O~'-~-'~N