REQUEST FOR APPROVAL (Sanitized FROM R&D FUNDS FOR AN OVERRUN TO CONTRACT (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05703A000200030021-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 10, 2004
Sequence Number: 
21
Case Number: 
Publication Date: 
September 10, 1970
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B05703A000200030021-8.pdf175.65 KB
Body: 
CENTER R TING SLIP FRO 021-8 DATE /// j TO INITIALS DATE 91E RKS DIRECTOR 01 DEP/DIRECTOR EXEC/DIRECTOR SPECIAL ASST ASST TO DIR 11 ? HISTORIAN eis/t CH/PPBS - -- / DEP CH/PPBS Iu EO/PPBS CH/IEG DEP CH/IEG _ '~ ` ?., EO/IEG CH/PSG DEP CH/PSG EO/PSG Gob% CH/TSSG DEP CH/TSSG EO/TSSG / CH/SSD/TSSG - -- k PERSONNEL LOGISTIC S TRAINING RECORDS MGT SECURITY ~ p- DIR/IAS/DDI CH/DIAXX-4 CH/DIAAP-9 CH/SPAApprov d Fo Relea e 2004 /03/26 :CIA-RDP78B05703A0002000 25X1 25X1 Declass Review by NGA 0021-8 25X1 Approved For Release 2004/03/26 : CIA-RDP78BO5703A000200030021-8 Approved For Release 2004/03/26 : CIA-RDP78BO5703A000200030021-8 Approv4 d For Rease 2004/03/26: ~I- !6P'8B05703A 00200030021-8 25X1 10 Copy, No. MEMORANDUM FOR: Director, National Photographic Interpretation Center SUBJECT Request for Approval ofi r== from R&D Funds for an Over? Task 10, with the 1. This memorandum requests approval for the commitment of additional funds for an existing contract. The specific request is stated in Paragraph 8. 2. NPIC currently has a cost-plus--fixed-fee contract with to fabricate a Target Indexing Device (TID) and an Electronic Screening Breadboard (ESB). This effort currently totals This equipment will provide NPIC with the capability of rapidly and automati- cally scanning 0 film to specify those targets that are cloud covered or cloud free. Furthermore, when operating in the general analysis mode, the equipment will permit an accurate determination of the percent of cloud cover of an area on a frame-by-frame basis. 3. The fabrication of the TID was made possible by previous NPIC research efforts in developing optical dif- fraction pattern technology. The diffraction patterns of images of clouds are very distinctive from the-diffraction patterns of nonclouded land areas, and it is upon these differences that the TID operates to distinguish cloud- covered targets from clear targets. 4. The Electronic Screening Breadboard uses a solid-state linear array of photo-transistors to derive electrical sig- nals from light tranmitted through the film. After process- ing, these signals provide the Clue Extractor Elements with image density and density gradient data for computing clues to determine the presence or absence of clouds, target signatures, etc. As such the ESB will not only serve as a technical back-up on the optical system (TID) but will triuu? y ExciLaed rr?m e rtornd For Release 2004/03/26 5703A000 Wwngradii End ~proved f O d~~f25SIfICarion ~ 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Approved If or Rel~"ase 2004/03/1 C ~44 B05703AO9d200030021-8 0 SUBJECT: Request for Approval ofl from R&D Funds for an Overrun to Contract 25X1 with the 25X1 provide a future capability to investigate the implementa- tion of other automatic target recognition functions. 5. The subject overrun is due to increases in the cost of materials over those initially programmed. This was the direct result of the Clue Former in the TID being far more complex than originally estimated, thereby resulting in an overall material cost increase of about In addition, G&A (after disallowance) is estimate o e overrun by about However, during the course of the contract, labor costs, travel, and computer useage were underrun by about 0-leaving an actual deficit of Although the overage in material cost had been known for some time there was a consistent underrun in travel, computer usage, and labor. The contractor had until very recently felt that this would offset the increased material cost. It was only after the detailed accounting of the week ending 4 September that it was apparent that there .would be an actual overrun. 6. The fabrication of the TID is virtually complete with preliminary acceptance tests scheduled for the week of 14-18 September. The ESB, which is the other deliverable hardware under this contract, is currently scheduled for demonstration by 1 November. In view of the Center's needs and the advanced stages of development and fabrication of both pieces of hardware, it appears to the government's advantage to complete both the TID and the ESB. 25X1 7. The Project Officer for this contract i 25X1 The contract association is SECRET, the Title UNCLASSIFIED, and the work SECRET. 8. In view of the progress to date and the urgent Center requirement for the TID your approval is requested for the authorization ofF--_~ from past year R&D funds. 25X1 Chie r, ec nlca , ervic Group, NPiC Approved For Release 2004/0 I8B05703A0002 0030021-8 25X1 Approved Fq IUaf 0j.a It,'. I r Reuse 2004/03/26 : CIA-RDP78B05703A0S0200030021-8 SUBJECT: Request for Approval of from R&D Funds Attachments: 1. Proposal 2. Form 2420 ARTHUR C. LUNDAHL Director National Photographic Interpretation Center Distribution: Cy 1 - NPIC/SS/SC&P (After approval) 2 - NPIC/ODir 3&4 - NPIC/TSG 5 - NPIC/TSG/RED 25X1 25X1 25X1 25X1 SLP i970 Date 25X1 Approved.For Release 2004/03/ IT 05703A 00200030021-8