REQUEST FOR APPROVAL (Sanitized FROM R&D FUNDS FOR AN OVERRUN TO CONTRACT (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05703A000200030021-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
February 10, 2004
Sequence Number:
21
Case Number:
Publication Date:
September 10, 1970
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 175.65 KB |
Body:
CENTER R TING SLIP
FRO 021-8
DATE
/// j
TO
INITIALS
DATE
91E RKS
DIRECTOR
01
DEP/DIRECTOR
EXEC/DIRECTOR
SPECIAL ASST
ASST TO DIR
11
?
HISTORIAN
eis/t
CH/PPBS -
--
/
DEP CH/PPBS
Iu
EO/PPBS
CH/IEG
DEP CH/IEG
_ '~ ` ?.,
EO/IEG
CH/PSG
DEP CH/PSG
EO/PSG
Gob%
CH/TSSG
DEP CH/TSSG
EO/TSSG
/
CH/SSD/TSSG
- --
k
PERSONNEL
LOGISTIC
S
TRAINING
RECORDS MGT
SECURITY
~
p-
DIR/IAS/DDI
CH/DIAXX-4
CH/DIAAP-9
CH/SPAApprov
d Fo
Relea
e 2004
/03/26 :CIA-RDP78B05703A0002000
25X1
25X1
Declass Review by NGA
0021-8
25X1 Approved For Release 2004/03/26 : CIA-RDP78BO5703A000200030021-8
Approved For Release 2004/03/26 : CIA-RDP78BO5703A000200030021-8
Approv4
d For Rease 2004/03/26: ~I-
!6P'8B05703A 00200030021-8
25X1
10
Copy, No.
MEMORANDUM FOR: Director, National Photographic Interpretation
Center
SUBJECT Request for Approval ofi r== from R&D
Funds for an Over?
Task 10, with the
1. This memorandum requests approval for the commitment
of additional funds for an existing contract. The specific
request is stated in Paragraph 8.
2. NPIC currently has a cost-plus--fixed-fee contract
with to fabricate a Target Indexing Device
(TID) and an Electronic Screening Breadboard (ESB). This
effort currently totals This equipment will
provide NPIC with the capability of rapidly and automati-
cally scanning 0 film to specify those targets that are
cloud covered or cloud free. Furthermore, when operating
in the general analysis mode, the equipment will permit an
accurate determination of the percent of cloud cover of an
area on a frame-by-frame basis.
3. The fabrication of the TID was made possible by
previous NPIC research efforts in developing optical dif-
fraction pattern technology. The diffraction patterns of
images of clouds are very distinctive from the-diffraction
patterns of nonclouded land areas, and it is upon these
differences that the TID operates to distinguish cloud-
covered targets from clear targets.
4. The Electronic Screening Breadboard uses a solid-state
linear array of photo-transistors to derive electrical sig-
nals from light tranmitted through the film. After process-
ing, these signals provide the Clue Extractor Elements
with image density and density gradient data for computing
clues to determine the presence or absence of clouds, target
signatures, etc. As such the ESB will not only serve as
a technical back-up on the optical system (TID) but will
triuu? y
ExciLaed rr?m e rtornd For Release 2004/03/26 5703A000
Wwngradii End ~proved f O
d~~f25SIfICarion ~
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Approved If
or Rel~"ase 2004/03/1 C ~44 B05703AO9d200030021-8
0
SUBJECT: Request for Approval ofl from R&D Funds
for an Overrun to Contract 25X1
with the 25X1
provide a future capability to investigate the implementa-
tion of other automatic target recognition functions.
5. The subject overrun is due to increases in the cost
of materials over those initially programmed. This was
the direct result of the Clue Former in the TID being far
more complex than originally estimated, thereby resulting
in an overall material cost increase of about In
addition, G&A (after disallowance) is estimate o e
overrun by about However, during the course of the
contract, labor costs, travel, and computer useage were
underrun by about 0-leaving an actual deficit of
Although the overage in material cost had been known
for some time there was a consistent underrun in travel,
computer usage, and labor. The contractor had until very
recently felt that this would offset the increased material
cost. It was only after the detailed accounting of the
week ending 4 September that it was apparent that there
.would be an actual overrun.
6. The fabrication of the TID is virtually complete
with preliminary acceptance tests scheduled for the week
of 14-18 September. The ESB, which is the other deliverable
hardware under this contract, is currently scheduled for
demonstration by 1 November. In view of the Center's
needs and the advanced stages of development and fabrication
of both pieces of hardware, it appears to the government's
advantage to complete both the TID and the ESB.
25X1
7. The Project Officer for this contract i 25X1
The contract association is SECRET,
the Title UNCLASSIFIED, and the work SECRET.
8. In view of the progress to date and the urgent Center
requirement for the TID your approval is requested for
the authorization ofF--_~ from past year R&D funds.
25X1
Chie r, ec nlca , ervic Group, NPiC
Approved For Release 2004/0
I8B05703A0002
0030021-8
25X1
Approved Fq
IUaf 0j.a It,'. I
r Reuse 2004/03/26 : CIA-RDP78B05703A0S0200030021-8
SUBJECT: Request for Approval of from R&D Funds
Attachments:
1. Proposal
2. Form 2420
ARTHUR C. LUNDAHL
Director
National Photographic Interpretation Center
Distribution:
Cy 1 - NPIC/SS/SC&P (After approval)
2 - NPIC/ODir
3&4 - NPIC/TSG
5 - NPIC/TSG/RED
25X1
25X1
25X1
25X1
SLP i970
Date
25X1
Approved.For Release 2004/03/ IT 05703A 00200030021-8