REQUEST FOR APPROVAL OF A CHANGE-IN-SCOPE TO CONTRACT (Sanitiz (AUTOMATED STEREO SCANNER) FOR ENGINEERING CONSULTATION SERVICES BY

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05703A000200030028-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 10, 2004
Sequence Number: 
28
Case Number: 
Publication Date: 
July 17, 1970
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B05703A000200030028-1.pdf117.01 KB
Body: 
SECRET Approved For Release 2004/03/26 : CIA-RDP78BO5703A000200030028-1 NPIC/TSG-035-70 17 JUL 1970 MEMORANDUM FOR: Director, National Photographic Interpretation Center SUBJECT Request for Approval of a Change-in-Scope to Contract (Automated Stereo Scanner) for Engineering Consultation Services by from FY-1971 R&D Funds 1. This memorandum requests approval for the commit- ment of R&D funds for a Change-in-Scope to Contract Paragraph 5. The specific request is stated in 25X1 I 25X1 25X1 2. By Amendment #19 the government changed the scope of work u d r Contract adding Phase III which 25X1 covers engineering consultation services, at a total cost of These services encompass 320 man-hours of assistance on an Engineering Audit of the Automated Stereo Scanner being conducted by 25X1 The first task consisted of an engineering review at I 25X1 during the period 1-4 June 1970. Following this, the Automated Stereo Scanner will be partially disassembled and shipped to The second task under Amendment #19 is for engineering services, to assist in the 25X1 reassembly of the equipment ati 25X1 3. It was estimated initially that one man-week at by an unspecified 0 engineer and one technician, was required. As a result of the initial consultation and subsequent analysis, it was determined by the govern- ment Project Officer and the two contractors involved, that two specific Otechnicians, 5X1 will be required at 0 or two weeks each, along 5X with one week's services of 25X1 Program Manager. It is estimated that these services will be required for the period 2-15 August 1970. The addi- tional technician man-hours, travel and per diem costs, along with the higher salary resulting from the substitu- tion ofl _J require additional funds over those covered by Amendment #19. Therefore, the I engineering 25X1 A r ed For Release 2004/03/2V-! CI DD78 5 e a~ t pds~ 30028-1 Declass Review b~'f~GA uecfas8f8ca1f04 Approved For Release 2004/03/26 : ~8B05703 000200030028-1 SUBJECT: Request for Approval of a Change-in-Scope to Contract (Automated Stereo Scanner) for Engineering Consultation Services by from FY-1971 R&D un s services at 0 will require approximately 0 in addi- tional funds for Phase III for a total commitment of 4. Project officer for this contract, will be at during the second week of the reassembly and will coordinate the technical consulta- tion between is appropriate for this work; Agency association ana complished are to be classified SECRET. 5. Approval is requested for a Change-in-Scope Contract l covering Engineering Consultation at at a cost of up to Category o nds. to Services from 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Chief, Technical services Group, ,.PIC Attachment: Form 2420 25X1 6 AUG 1970 ARTHUR C. LUNDAHL Director National Photographic Interpretation Center Distribution: original - NPIC/TSG/SC&PS (After Approval) 1 -- NPIC/ODir 2 -- NPIC/TSG 1 - NPIC/TSG/RED Approved For Release 2004/03/26 f:14~ f8B05703A000200030028-1 9 YY 4 /