REQUEST FOR APPROVAL OF A CHANGE-IN-SCOPE TO CONTRACT (Sanitiz (AUTOMATED STEREO SCANNER) FOR ENGINEERING CONSULTATION SERVICES BY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05703A000200030028-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
February 10, 2004
Sequence Number:
28
Case Number:
Publication Date:
July 17, 1970
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 117.01 KB |
Body:
SECRET
Approved For Release 2004/03/26 : CIA-RDP78BO5703A000200030028-1
NPIC/TSG-035-70
17 JUL 1970
MEMORANDUM FOR: Director, National Photographic
Interpretation Center
SUBJECT Request for Approval of a Change-in-Scope
to Contract (Automated Stereo
Scanner) for Engineering Consultation
Services by
from FY-1971 R&D Funds
1. This memorandum requests approval for the commit-
ment of R&D funds for a Change-in-Scope to Contract
Paragraph 5.
The specific request is stated in
25X1
I 25X1
25X1
2. By Amendment #19 the government changed the scope
of work u d r Contract adding Phase III which 25X1
covers engineering consultation services, at a total
cost of These services encompass 320 man-hours of
assistance on an Engineering Audit of the Automated
Stereo Scanner being conducted by 25X1
The first task consisted of an engineering review at I 25X1
during the period 1-4 June 1970. Following this, the
Automated Stereo Scanner will be partially disassembled
and shipped to The second task under Amendment
#19 is for engineering services, to assist in the 25X1
reassembly of the equipment ati 25X1
3. It was estimated initially that one man-week at
by an unspecified 0 engineer and one technician,
was required. As a result of the initial consultation
and subsequent analysis, it was determined by the govern-
ment Project Officer and the two contractors involved,
that two specific Otechnicians, 5X1
will be required at 0 or two weeks each, along 5X
with one week's services of 25X1
Program Manager. It is estimated that these services will
be required for the period 2-15 August 1970. The addi-
tional technician man-hours, travel and per diem costs,
along with the higher salary resulting from the substitu-
tion ofl _J require additional funds over those
covered by Amendment #19. Therefore, the I engineering 25X1
A r ed For Release 2004/03/2V-! CI DD78 5 e a~ t pds~ 30028-1
Declass Review b~'f~GA uecfas8f8ca1f04
Approved For Release 2004/03/26 : ~8B05703 000200030028-1
SUBJECT: Request for Approval of a Change-in-Scope to
Contract (Automated Stereo Scanner)
for Engineering Consultation Services by
from FY-1971 R&D un s
services at 0 will require approximately 0 in addi-
tional funds for Phase III for a total commitment of
4. Project officer for
this contract, will be at during the second week of
the reassembly and will coordinate the technical consulta-
tion between is appropriate
for this work; Agency association ana complished are
to be classified SECRET.
5. Approval is requested for a Change-in-Scope
Contract l covering Engineering Consultation
at at a cost of up to
Category o nds.
to
Services
from
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Chief, Technical services Group, ,.PIC
Attachment:
Form 2420
25X1
6 AUG 1970
ARTHUR C. LUNDAHL
Director
National Photographic Interpretation Center
Distribution:
original - NPIC/TSG/SC&PS (After Approval)
1 -- NPIC/ODir
2 -- NPIC/TSG
1 - NPIC/TSG/RED