KH-4 MISSION 1109 IPIR NUMBER 12 OAK SUPPLEMENT PART VIII 5-23 MARCH 1970

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04562A000300080001-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
77
Document Creation Date: 
November 17, 2016
Document Release Date: 
August 4, 2000
Sequence Number: 
1
Case Number: 
Publication Date: 
April 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04562A000300080001-4.pdf2.14 MB
Body: 
Approved For Release 2000/08/22 : CIA-RDP78T04562A00030&1W 0 iC9ET PHOTOGRAPHIC INTERPRETATION REPORT NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER DECLASS REVIEW by NIMA/DOD KH-4 MISSION 1109 IPIR NUMBER 12 OAK SUPPLEMENT PART VIII 5-23 MARCH 1970 Handle via TOP SECRET Talent-Keyhole Channels Only TCS-20114/70 GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING APRIL 1970 COPY NO..2.0 7 ..86..PAGES OAK-057/70 Apprb dAFI r TRelease 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 This document contains information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission or the r,velotion of its contents in any manner to on unauthorized potion, as well as its use in any manner prejudicial to the safety or Interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially Indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT-KEYHOLE Control System. TARGET CATEGORIES AND ASSOCIATED NTP FUNCTIONAL AREAS (CODES) 1. STRATEGIC SSM Deployed Strategic SSM Facilities (A) 2. MISSILE RANGES Missile Ranges: Strategic SSM/Space Facilities (P) Missile Ranges: Air- Launched Missile Facilities (0) Missile Ranges: Naval Launched Missile Facilities (R) Missile Ranges: Tactical SSM Facilities (S) Missile Ranges: SAM/AMM Facilities (T) 3. AIR DEFENSE MISSILES Deployed AMM Facilities (B) Deployed SAM Facilities ID) 4. ELECTRONICS/ COMMUNICATIONS Deployed Communication/Electronic/Radar Facilities (C) 5. AIR Air Bass Facilities (E) 6. NAVAL Naval Base Facilities (F) 7. GROUND Ground Force Facilities (G) 8. TACTICAL SSM Deployed Tactical SSM Facilities (H) 9. LOGISTICS Military Logistics Facilities (K) 10. NUCLEAR ENERGY Atomic Energy Facilities (O) 11. CBR CBR Facilities (V) 12. INDUSTRY Strategic Weapons Industrial Facilities (J) General Purpose Weapons Industrial Facilities (L) Non -Military Industrial Facilities (N) Communication/Electronic/Radar R&D Facilities (U) 13. MISCELLANEOUS Non-Military Logistics Facilities (M) Miscellaneous/Unidentified Facilities (Z) These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional association (i.e. missile range tracking facilities ate reported under "MISSILE RANGES. fly-away airfields ataircraft plants are reported under "INDUSTRY," airfield nuclear weapons storage facilities are reported under "AIR: etc.l. iO46352 ?, L; 11-1 9 ; Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 TablbVlrgl ed For Release 2000 /EicP&T4-&FF78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KH-4 MISSION 1109 TABLE OF CONTENTS PAGE 1 MISSION HIGHLIGHTS 2 CHINA, COMMUNIST GROUND FORCE FACILITIES NUCLEAR ENERGY MISCELLANEOUS CZECHOSLOVAKIA AIR DEFENSE MISSILES 8 AIR BASE FACILITIES l0 GROUND FORCE FACILITIES 11 25X6 HUNGARY GROUND FORCE FACILITIES 21 KOREA, NORTH AIR DEFENSE MISSILES 22 GROUND FORCE FACILITIES 26 DEPLOYED TACTICAL SSM FACILITIES 37 LOGISTICS 38 INDUSTRY 40 MISCELLANEOUS 44 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES 45 MISSILE RANGES 51 AIR DEFENSE MISSILES 54 COMMO/ELEC/RADAR FACILITIES 57 AIR BASE FACILITIES 58 NAVAL BASE FACILITIES 63 GROUND FORCE FACILITIES 64 NUCLEAR ENERGY 77 INDUSTRY 80 MISCELLANEOUS 84 I Handle Via Approved For Release 200 / Cet-ffW8TO4562A0003000T3bd64 LE Control System my T .W?tpd For Release 200d g/z c@FA-gRR78TO4562A000300080001-4 Control System Only TCS-2011+/70 - IPIR 12 PREFACE KH-4 MISSION 1109 PREFACE THIS IS THE EIGHTH OAK SUPPLEMENT REPORT ON MISSION 1109, FOR COMPLETE PREFACE SEE THE FIRST OAK SUPPLEMENT REPORT. 1 Handle Via Approved For Release 2001fgp/4t-Weff8T04562A00030c00ro1'PHa yste lm diy 25X1 B Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Hanle a yed For Release 200 8W4TAMA78TO4562A000300080001-4 Tal n Control System Only TCS-20114/10 - IPIR 12 CHINA' COMMUNIST KH-4 MISSION 1109 GROUND FORCE FACILITIES SIGNIFICANT RESULTS N -LO-KO ARMY BKS S,SE AL 1 25X1 D STATUS:OCCUPIED REMARKS: 25X1 D THE CONSTRUCTION REPORTED ON COMPLETE GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D OTHER RESULTS-NO APPARENT CHANGE S + STORAGE AREA 25X1 D NAC STATUS OCCUPIED 25X1 D 43-34-40N 082-31"30E 25X1A IS NOW 43-16-33N 089-15-221E 25X1A 3 Handle Via Approved For Release 2009I RC1Rt-RR 78T04562A0003gpgM -" iy 25X2 Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Next 3 Page(s) In Document Exempt Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Tal`Wl fljqed For Release 200 0QP8/iic - &F 78TO4562A000300080001-4 Control System Only TCS-X20114/70 IPIR 12 KH-4 MISSION 1109 SIGNIFICANT RESULTS CZECHOSLOVAKIA AIR DEFENSE MISSILES CHOMUTOV SAM SITE A31-2 5O-3O-551 013-16-+2E 25X1D 25X1A STATUS: ABANDONED 25X1 D 25X1 D 25X1 D REMARKS: ONLY TWO LAUNCH POSITIONS EXIST AT THE SITE. BUILDINGS ARE OE3SERVL1 WHERE THE OTHER LAUNCH POSITIONS USED TO BE, THIS SITE HAS PROBABLY BEEN CONVERTED TO SERVE A STORAGE FUNCTION? PLZEN SAM SITE B30-2 STATUS;OCCUPIED REMARKS: THE SITE IS PROBABLY OCCUPIED, THREE OF THE LAUNCH POSITIONS APPEAR TO BE COVERED. POSSIBLY BY NETTING. PLZEN SAM SUPPORT FACILITY 25X1 D NAG STATUS:OPERATIONAL 25X1 D 49.51-21N 01.3-04-57E 49-X57-27N 013.26-17E OTHER RESULTS-NO APPARENT CHANGE PLZEN SAM SITE A21-2 25X1 D 25X1A 25X1A 49-36-20N 0.13-18-35E 25X1A Handle Via Approved For Release 200C1?p/2ACRR FMrr8TO4562A000309ego?VpI!AL?iy T 8y d For Release 2001 a n- Control System Only a /5fCRfi1-78T04562A000300080001-4 TCS-20114/70 - IPIR 12 CZECHOSLOVAKIA KH-?4 MISSION 1109 AIR DEFENSE MISSILES 25X1 D STATUS:UNKNOWN REMARKS: FOUR LAUNCH POSITIONS ARE COVEREOP PROBABLY BY NETTING. 9 Handle Via Approved For Release 2000# 623EdI ST04562A00030(~gpp siem Only TaiAlP Et~byEed For Release 200bPA/5iCPIb-~ 78T04562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 CZECHOSLOVAKIA KH-4 MISSION 1109 AIR BASE FACILITIES SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 49-40-28N 013. 16-ZOE NAC 25X1A AIR ORDER OF BATTLE: 26 SMALL SWEPT/DELTA-WING 46 SMALL STRAIGHT-WING OTHER RESULTS-NO APPARENT CHANGE VANKA AIRFIELD 48*-10-13N 017-12-50E NAC AIR ORDER OF BATTLE; NONE DISCERNIBLE Handle Via 8TO4562A00030 n ~jEY OEE A roved For Release 200 10 pp ~~ l~ ~dfi~jsYemmnly 25X1A Tanrr Ypd For Release 2006,Qg/if~Ul-RW78TO4562A000300080001-4 Control System Only TES--20114/70 - IPIR 12 CZECHOSLOVAKIA KH-4 MISSION 1109 GROUND FORCE FACILITIES SIGNIFICANT RESULTS PLZEN ARMY BARRACKS E3ORECH 1/2 25X1 D NAC 49-43-35N 013-21^-45E 25X1A STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: 25 VEHICLES AND PIECES OF EQUIPMENT (AT LEAST) 25X1 D PLZEN ARMY BARRACKS NA SLOVANECH SE 3 49-43-13N 013-24--23E 25X1 D NAC STATUS; OCCUPIED GROUND FORCE ORDER OF BATTLE: 100 VEHICLES AND PIECES OF EQUIPMENT (AT LEAST) 25X1 D STRASICE ARMY BARRACKS 1 25X1 D NAC 49-44-00N 013-45-50E 25X1A 25X1A GROUND FORCE ORDER OF BATTLE: 100 VEHICLES AND PIECES OF EQUIPMENT (AT LEAST) 25X1 D Handle Via Approved For Release 2000fV2 %CRF f8TO4562A00030QAdogAtEm my Ta le.v pd For Release 200aIQUE/gct4A-RB 78TO4562A000300080001-4 25X1 D 25X1 D 25X1 D 25X1 D NAC OTHER RESULTS-NO APPARENT CHANGE KOMARNO ARMY BARRACKS FORTRESS 201 47-45-22N 018-08-21E 25X1 D NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE NONE DISCERNIBLE 25X1 D Control System Only TCS-2011.4/70 -- IPIR 12 KH-4 MISSION 1109 CZECHOSLOVAKIA GROUND FORCE FACILITIES STRIt3RO ARMY BKS w 001 49-45-12N 012-59-12E NAC GROUND FORCE ORDER OF BATTLE: 75 VEHICLES AND PIECES OF EQUIPMENT (AT LEAST) T - O RM BARRACKS PARTIZANSKE. 1 49-48-19N 012-38-23E 2 GROUND FORCE ORDER OF BATTLE: 100 VEHICLES AND PIECES OF EQUIPMENT (AT LEAST) 12 Handle Via Approved For Release 200LVC/2~EiCIRFF~ F 1F?8TO4562A000306da96e0PR Only 25X1A 5X1A 25X1A Ta 00?QKpd For Release 200d1?g/HC&9-kBHI8TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 CZECHOSLOVAKIA KH-4 MISSION 1109 GROUND FORCE FACILITIES 25X1 D NOVE ZAMKY ARMY BKS 1 NAC 47-58-45N 018-X09-49E 25X1A 25X1 D STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE NONE DISCERNIBLE 13 Handle Via Approved For Release 200~W 8T04562A00030 n0`SA m pp EYVOLEnly qA 25X6 Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Next 6 Page(s) In Document Exempt Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Tale"nf!j0KI Yed For Release 20dO08 RETAWfP78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 HUNGARY KH-4 MISSION 1109 GROUND FORCE FACILITIES SIGNIFICANT RESULTS 25X1 D CSAPOO SUSPECT MILITARY -" w "0E REMARKS: THE INSTALLATION AT THE REFERENCED COORDINATES DOES NOT APPEAR TO BE MILITARY. 21 Handle Via Approved For Release 26k 1 478T04562A0003900 on ro em Only Talent AULEed For Release 20d Li)88FHRETAR h5 78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREA, NORTH KH-4 MISSION 1109 AIR DEFENSE MISSILES SIGNIFICANT RESULTS HUNGNAM PROS SAM SITE C24-2 39-37-22N 127-14-12E NAC 25X1 D STATUS: UNOCCUPIED 25X1 D HUNGNAM SAM SITE A25-a2 25X1 D NAC 39-48-30N 127-32-42E 25X1A 25X1A REMARKS: ALL SIX LAUNCH POSITIONS AND THE CENTRAL GUIDANCE AREA ARE OCCUPIED0 MISSILE ORDER OF BATTLE: 6 PROB LAUNCHERS 1 PROB FAN SONG RADAR 25X1 D 22 Handle Via 0 em Approved For Release 20081 01~fM78T04562A00039O T y Only TXp.prQKpd For Release 200JI99/2SIc -RBP78TO4562A000300080001-4 Control System Only TCS-20114/70 .. IPIR 12 KOREAa NORTH KH-4 MISSION 1109 AIR DEFENSE MISSILES PYONGYANG SITE C05-2 NAC 25X1 D 25X1 D 25X1 D 25X1 D 39i .~, r " 7E 25X1A REMARKS: SIX LAUNCH POSITIONS AND THE CENTRAL GUIDANCE AREA ARE OCCUPIEDo MISSILE ORDER OF BATTLE: RO CHERS (2 WITH 1 FAN SONG RADAR PUSS MISSILES) 6 POSS LAUNCHERS 1 PROB FAN SONG RADAR PYONGYANG SAM SITE C29-2 3907-p5ON 125-18-15E 25X1D NAC 25X1A 25X1 D 25X1 D REMARKS: ALL SIX LAUNCH POSITIONS AND THE CENTRAL GUIDANCE AREA ARE OCCUPIED, MISSILE ORDER OF BATTLE: 6 PROS LAUNCHERS (2 WITH 1 PROB FAN SONG RADAR POSS MISSILES) 23 Handle Via Approved For Release 2000'0 1r2,gE:%L*8TO4562A00030Q ~j lam ly T pW,c! d For Release 200fT199/2V~g~d-RBP78T04562A000300080001-4 Control System Only TCS*-20114/70 - IPIR 12 KOREA? NORTH KP-4 MISSION 1.109 AIR DEFENSE MISSILES 25X1 D OTHER RESULTS-NO APPARENT CHANGE 25X1 D HAMHUNG POSSIBLE SAM SITE 39-53-ION 127-25--20E NAC 25X1A 25X1 D HAMHUNG SAM SITE A25A-2 25X1 D NAC STATUS. UNOCCUPIED 25X1 D 39-52-15N 127--22-06E HAMHUNG SAM SITE A25-2 39-53-20N 127-24-45E 25X1 D 25X1 D 25X1A 25X1A 24 Handle Via Approved For Release 2000r(W2S,jEM 8T04562A00030Q~,~eWOnly 25X1 D Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 iAppraied For Release 200 0/08/2 -C8 -R'QPP8T04562A000300080001-4 Control System Only TCS-20114/70 -, IPIR 12 KOREA, NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES ANHYOP ARMY BKS + HQ 45TH INF DIV 38-20-44N 126-X54-53E 25X1 D STATUS:OCCUPIED PHYSICAL DESCRIPTION; 4.1 NM ESE OF CHANGPO-RIO THE FACILITY CONSISTS OF SIX SEPARATE AREAS. AREA A, AT 38-20?-44N 126-54-53EP CONSISTS OF 14 BARRACKS, EIGHT QUARTERS, THREE ADMINISTRATION BUILDINGS, ONE AUDITORIUM, ONE T-SHAPED MESSHALLP AND 13 SUPPORT BUILDINGS. AREA B, AT 38-20-40N 126-55-05E, CONSISTS OF 33 QUARTERS. AREA Cr AT 38-20-40N 126-551-35E, CONSISTS OF 13 BARRACKS, 37 QUARTERS, 12 STORAGE BUILDINGS, AND APPROXIMATELY 20 SUPPORT BUILDINGS. AREA D, AT 38-20?-30N 126?56.10EP CONSISTS OF 24 BARRACKS, THREE QUARTERS, ONE ADMINISTRATION BUILDING, ONE T-SHAPED MESSHALLP AND APPROXIMATELY TEN SUPPORT BUILDINGS. AREA Er AT 38-20-OON 126x-55-30EP CONSISTS OF NINE BARRACKS, ONE ADMINISTRATION BUILDING, AND THREE SUPPORT BUILDINGS. AREA F. AT 38-19-1ON 126-m54-10E, CONSISTS OF 26 BARRACKS, ONE ADMINISTRATION BUILDING, AND FOUR SUPPORT BUILDINGS. GROUND FORCE ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1A 26 Handle Via Approved For Release 20007 22EC(R$~F 8TO4562A0003OQQ,i6gng my ialerit Elff V, d For Release 200d/(W/fi~RFT-FWP~8TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREA. NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES CHONSO-RI HO 102 TK REGT A BKS AREA 25X1 D NAC GROUND FORCE ORDER OF BATTLE: 25X1 D 15 UNIDENTIFIED PIECES OF ARMOR (APPROXIMATELY) 25X1 D 25X1 D 25X1 D 39-09-40N 125-39-40E 25X1A KANGGYE BARRACKS AND STORAGE AREA 40-51-30N 126-31-30E 25X1A STATUS; OCCUPIED PHYSICAL DESCRIPTION: 7 NM SSW OF KANGGYE. ON THE WESTERN EDGE OF A SMALL VILLAGE. THE ROAD-SERVED INSTALLATION IS IN TWO ADJOINING VALLEYS AND CONSISTS OF THREE BARRACKS, ONE POSSIBLE ADMINISTRATION BUILDING, 23 LARGE STORAGE BUILDINGS (POSSIBLY REVETTED)s AND 16 PROBABLE SUPPORT BUILDINGS. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 27 Handle Via Approved For Release 200 8TO4562A00030 ~jEY OLE ~~ Q~ ~Yemmnly T .V pd For Release 200SAR/Hc 1-R~W78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREA# NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES MAEMOL ARMY STORAGE MUNDO - 39-16-20N 12649-25E 25X1 D MANPO-UP MILITARY STORAGE AREA SE STATUS:NEGATED REMARKS: THE FACILITY IS NOT MILITARY. IT APPEARS TO BE A COMMUNE. 41-05-O1N 126-25-1OE 25X1 D 25X1 D STATUS: OCCUPIED PHYSICAL DESCRIPTION: 6.8 NM SW OF MANPO-UP. THE ROAD-SERVED# POSSIBLY SECURED INSTALLATION IS IN FIVE INTERCONNECTED VALLEYS. AND CONSISTS OF THREE BARRACKS, ONE POSSIBLE ADMINISTRATION BUILDING, 94 DISPERSED STORAGE BUILDINGS, AND NINE SUPPORT BUILDINGS. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1A 28 Handle Via Approved For Release 2000 P/25ECRE4-FRgFF8TO4562A00030gQio lm`bn y Hae Via TanJ~l~piprAlked For Release 200bQ 8/Y2c }k-WDF78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KH-4 MISSION 1109 PYONGSAN MILITARY BARRACKS AREA 38-20-40N 126-23-34E 25X1 D PHYSICAL DESCRIPTION: 1 NM NORTH OF PYONGSAN. THE FACILITY CONSISTS OF 27 BARRACKS. 11 QUARTERS. ONE ADMINISTRATION BUILDING, ONE PROBABLE MESSHALLP 16 STORAGE BUILDINGS. FOUR PROBABLE VEHICLE SHEDS, APPROXIMATELY 20 SUPPORT BUILDINGS, AND FOUR REVETTED ARTILLERY POSITIONS. 25X1 D OTHER RESULTS-NO APPARENT CHANGE CHONGJU ARMY BARRACKS AREA SOUTHWEST 39-39-33N 125-09-22E 25X1 D NAC GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KOREA, NORTH GROUND FORCE FACILITIES 25X1A 25X1A 25X1 D CHUNGSAN MILITARY AREA NAC 25X1 D 39-04-40N 125-26-'35E 25X1A STATUS:OCCUPIED Handle Via Talent-KEYHOLE Approved For Release 200QOS/aEItFA-IRI F98TO4562A00030fbM0y0t7nr4nly TaeP.,golpd For Release 2006A8/ffQNX 978T04562A000300080001-4 Control System Only TCS-2U114/70 - IPIR 12 KOREA, NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE HASO-RI ARMY BARRACKS 39-i1-22N 5- " ^48E NAC 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KAEWON-'DONE ARMY BARRACKS NAC 39-44-45N 125-08-05E 25X1A 25X1 D - 25X1 D 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KAN-NI ARMY BARRACKS . 39-~ 7 5- 5-45E NAC 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 30 Handle Via Approved For Release 2000VQ/25ECRF '~8T04562A00030QAdo~''t'6 'nly T i r,qa(gd For Release 2OOd)9g/2ii g~-14BP78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREAF NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES 25X1 D 25X1D KUNDONG-NI ARMY BARRACKS 39-43-55N 1.25-03-55E NAC 25X1A STATU S:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D NAEMOL ARMY i3KS MUNDOK-TONG - 6-30N 126-49-30E 39 25X1 D NAC WWWWW 25X1A i STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D PYORHA-RI ARMY SUPPLY DEPOT NAC 25X1 D STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE . 25X1 D 5E 25X1A 31 Handle Via Approved For Release 200 8T04562A0003 l~rJ~ nl 0 Han le Via ~~pp ; 8/iiC'g~-R"D~11F78TO4562A000300080001-4 TaAPPigf~v d For Release 200 Control System Only TCS-20114/70 ?- IPIR 12 KHt-4 MISSION 1109 KOREA. NORTH GROUND FORCE FACILITIES S -GO ARMY BARRACKS AND STORAGE AREA 39>-45-40N 125-1332E 25X1D NAC 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D SANGSO-RI ARMY BARRACKS + STOR AREA 39.37-35N 125 25X1 D NAC STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 18--30E _ 25X1A SANG-DONG ARMY BKS AREA 39-44-20N 124.5 25X1 D NAC STATUS.OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1A 32 Handle Via "~a1e t-K YHOLE Approved For Release 200Q1oo/ZECR[ -lRIUPP8TO4562A00030Frbhk du6y0c4nr4nly Han le Via T al ptRFqd For Release 200bW8/22~'6b-W'D~78T04562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREA# NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES SINJONG-NI ARMY BKS + STOR AREA 39-45-50N 125-17-00E 25X1D NAC 25X1A GROUND FORCE ORDE--R OF BATTLE: NONE DISCERNIBLE 25X1 D SINO-RI ARMY BARRACKS + STORAGE AREA NAC 25X1 D -08E 25X1 A STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D SOKKOL-SANGDAN ARMY BARRACKS AREA 39-42-42N 125-06-05E 25X1D NAC 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 33 Handle Via Tale t-K YHOLE Approved For Release 20.0Q/Q$/ [R[ -F~IUPP8TO4562A00030 10AI Only T .r" @cpd For Release 200418/ 'tCgA-14BP78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREA# NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES SONCHON ARMY BARRACKS SOUTH 39-45-25N 124-55-OOE NAC 25X1A 25X1 D STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D SO50-R I ARMY BARRACKS AREA 39-39-59N 125-18-35E 25X1D NAC 25X1A STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D SUNAN STORAGE AREA NW 25X1 D NAC 39-14-10N 125-36-20E 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 34 Handle Via Y OLE Approved For Release 200E~IQW/SE[IR~ FWI~'F8T04562A00030Ui6VPt my T I Via . Wpd For Release 200JM8/ 't-CC"rA-RBP78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR, 12 KOREAr NORTH KH-4 MISSION 1109 GROUND FORCE FACILITIES SUNCHON MILITARY AREA SW 25X1 D NAC 39-24-45N 125-55-20E 25X1A STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D TAEGWAN-UP ARMY BARRACKS NORTH 25X1 D NAC 40!16-11N 125-09-40E 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D UNSAN-'NI ARMY BKS NE 39-24-20N 126-03-30E 25X1 D NAC GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1A 35 Handle Via Yy0LE Approved For Release 2000VC/2SEC(RF f 8T04562A000309flio Anly Taedt- HOLEd For Release 200 I I$C Control System Only TCS--20114/70 - IPIR 12 KH-4 MISSION 1109 WONJIN-NI ARMY SUPPLY DEPOT 25X1 D NAC STATUS: OPERATIONAL 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D GROUND FORCE ORDER OF BATTLE. NONE DISCERNIBLE X-RbW78TO4562A000300080001-4 KOREA# NORTH GROUND FORCE FACILITIES 39-49-25N 125-07-48E 25X1A YONGHUNG ARMY BARRACKS AREA NORTH 39.34-40N 127-14-42E NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE YONGWAN-*NI MILITARY AREA SOUTH NAC GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1A 39-33-1ON 125-51-1OE 25X1A 36 Handle Via Approved For Release 2000f(W23E.CRW 8T04562A00030QQO E1,O iy T..P. ty 0y d For Release 2004 EUMA 1~~~78T04562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KOREAr NORTH KH-4 MISSION 1109 DEPLOYED TACTICAL SSM FACILITIES OTHER RESULTS-NO APPARENT CHANGE NAMPO CRUISE MISSILE LAUNCH SITE 25X1 D NAC STATUS: UNOCCUPIED 25X1 D 25X1 D 25X1 D NAMPO CRUISE MISSILE LAUNCH SITE 1 38-34-17N125-01-19E STATUS:UNKNOWN MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 25X1A 25X1A 37 Handle Via Approved For Release 2000 T04562A00030 EY OLE 1`~~E' 8 Q ~~ a my Han le Via A~pp SFF Ta0hRRgfdl ed For Release 200 b1T8/Y2C'gb- 78T04562A000300080001-4 Control System Only TC5-20114/70 - IPIR 12 KOREA# NORTH KH-4 MISSION 1109 LOGISTICS SIGNIFICANT RESULTS 25X1 D 25X1 D OAD YARDS NAC STATUS: OPERATIONAL 39.54-34N 127-32,55E 25X1A REMARKS: ACTIVITY IS MODERATE. THE YARD IS APPROXIMATELY 20 PERCENT FILLED. ASSOCIATED OBJECTS: 4 ROG,LOCOMOTIVES UNDER 120 PIECES OF ROLLING STOCK POWER (AT LEAST) MANPO-UP RAILROAD YARDS 25X1 D NAC 25X1 D 41-08-54N 126-17'05E 25X1A REMARKS: ACTIVITY APPEARS LIGHT. THE YARD IS APPROXIMATELY 5 PERCENT FILLED. 38 Handle Via Talent-KEYHOLE Approved For Release 200cVW2SE(4Zf 8T04562A0003000800014nly 25X1 D Control System Only TCS->20114/70 - IPIR 12 KH-4 MISSION 1109 pYt ed For Release 20008/2"tc'C`f1-K 3 78TO4562A000300080001-4 KOREAp NORTH LOGISTICS PAEGAM RAILROAD YARDS AND SHOPS 41-14-33N 128-48-08E 25X1 D 25X1A 25X1 D REMARKS: THE LEVEL OF ACTIVITY IS LIGHT. THE YARD IS LESS THAN 10 PERCENT FILLED. OTHER RESULTS-NO APPARENT CHANGE SINUIJU PET PROS STR CHANGPO-RI 40-02-26N 124-26-26E 25X1 D NAG STATUS:OPERATIONAL 25X1 D 25X1A 39 Handle Via Talent-KEYHOLE Approved For Release , 2Q0Q/0V/SECIR -FMFP8TO4562A00030001WA04m4nly TpVia ,cmgd For Release 2000/22-CRd-46P78T04562A000300080001-4 Control System Only TCS-20114/70 A- IPIR 12 KOREA, NORTH KH-4 MISSION 1109 INDUSTRY SIGNIFICANT RESULTS 25X1 D 25X1 D CHONGJIN TRANS STN WEST 41-49-29N 129-44-00E 25X1A STATUS:UNKNOWN REMARKS: NO TRANSMISSION FACILITY IS DISCERNIBLE AT THE REFERENCED COORDINATES. KIMCH EK IRON AND STEEL PLANT SONGJIN 40-41-46N 129-12-43E 25X1D NAC 25X1A 25X1 D REMARKS: THE OPEN HEARTH FURNACES ARE IN OPERATION. 40 Handle Via ut-KIYIOLE Approved For Release- 200(ll(*/2QECiREq-FWFg8T04562A00030CQ b t my T yy pd For Release 200d)99/z2V~@~-RB978TO4562A000300080001-4 Control System Only TCS-20114170 - IPIR 12 KOREA# NORTH KH-L MISSION 1109 INDUSTRY 25X1 D STATUS:OPERATIONAL PHYSICAL DESCRIPTION: ON THE SW EDGE OF SINPOa THE RAIL-SERVED FACILITY CONSISTS OF ONE MEDIUM AND ONE SMALL VERTICAL TANKS, F?OUR EARTH-COVERED HORIZONTAL TANK UNITS, TWO OPEN CRADLE UNITS, AND THREE SUPPORT BUILDINGSO 40-s01-30N 128-10-12E 25X1A 25X1 D OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D HUNGNAM CHEMICAL PLANT PONGUNG 39-51-12N 127-34-27E NAC STATUS:OPERATIONAL KANGGYE AMMUNITION PLANT PO-DONE PUG 25X1 D NAC TATUS:OPERATIONAL 25X1 D 25X1A 25X1A 41 Handle Via 0 nd ~EXApproved For Release 200 8TO4562A0003 OLE fily H dle Via T Ipc W d For Release 2000T, Control System Only TCS-20114/70 - IPIR 12 KH-4 MISSION 1109 25X1 D OF AE SAT f8TO4562A000300080001-4 KOREAr NORTH INDUSTRY KANGGYE AMMUNITION PLANT PUG 93 25X1 D NAC 91 STATUS:OPERATIONAL 25X1 D 25X1A PYONG-NI HPP KOKAI NO 1 PUG 40-X59-11N 126-47-38E 25X1 D NAC STATUS:OPERATIONAL 25X1 D PYORHA-RI ARMS + AMMUNITION PLT 81 PUG 40-45'-35N 126-X33-30E 25X1 D NAC STATUS:OPERATIONAL GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D SINUIJU CONSTR MACH NAGWON-NODONJAGU 40-02-29N 124-25-56E 25X1 D NAC STATUS:OPERATIONAL 25X1 D 42 11 Handle Via 25X1A 25X1A 25X1A Approved For Release 200QIq$/ZE[&K-l~UQF8T04562A00030p,Q t M l t m my Ta*hkgyEed For Release 2001 Control System Only TCS-20114/70 R IPIR 12 KH-4 MISSION 1109 a HCH1-RF78T04562A000300080001-4 KOREA# NORTH INDUSTRY SUP N -NO ONG-.)AGU HPP & DAM SUI HO 40--27 '22N 124*-57-46E 25X1D NAC 25X1A STATUS: OPERATIONAL 25X1 D Handle Via Approved For ReleasiV200"~tP1 C -I a ff 8T04562A00030Pe0tro"N m my TaAt fty,?d For Release 200d/W/AE~O T-FW~'~T8TO4562A000300080001-4 Control System Only TCS-20114 '70 - IPIR 12 KOREA, NORTH KHL+ MISSION 1109 MISCELLANEOUS SIGNIFICANT RESULTS 25X1 D 25X1 D S I NU I JU COMPLEX w05-40N 124-23-45E NAC 25X1A STATUS;OPERATIONAL REMARKS: THE POSSIBLE FIBER PLANT IS ACTIVE. FOOD PROCESSING ACTIVITY IS LIGHT. RAIL ACTIVITY IS LIGHT. OTHER RESULTS-NO APPARENT CHANGE MANPO-UP COMPLEX 25X1 D NAG 25X1 D STATUS;OPERATIONAL 25X1" ;1, 09-12N 126-17-20E Approved For Release 2000 fffli23Ed&F ?8TO4562A000309afll 'oLE on rol vs em Only 0 cl For Release 200thQg/2SIc8f-F H' 8TO4562A000300080001-4 Control System Only TCS-20114/70 > IPIR 12 SOVIET, UNION KH-4 MISSION 1109 DEPLOYED STRATEGIC SSM FACILITIES SIGNIFICANT RESULTS AKTYUBINSK IRBM COMPLEX 49-59-ION 056-54-45E 25X1D NAC 25X1A STATUS. OPERATIONAL REMARKS: ALL ELEMENTS OF THE COMPLEX ARE OBSERVED. 25X1 D ANASTASYEVKA MRBM COMPLEX 48-35*-30N 135-39-L0E 25X1D 25X1A STATUS UNKNOWN REMARKS: ALL COMPONENTS OF THE COMPLEX CAN BE IDENTIFIED ONLY. THE WESTERN 50 PERCENT OF THE SEARCH AREA IS OBSERVEDAND NO SILO CONSTRUCTION IS NOTED 25X1 D DOMBAROVSKIY ICBM COMPLEX 50-58-18N 059-44-40E 25X1D 25X1A STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE, COMPLEX ARE OBSERVED. LAUNCH SITES 48H-53H ARE NOW IN A LATE STAGE OF CONSTRUCTION AND LAUNCH SITES 54Ir 55Ir 57Ir 61Jr 62Jr AND 64J ARE NOW IN THE MIDSTAGE OF CONSTRUCTION. LAUNCH SITES 63Jr 65Jr AND 66J ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION, 25X1 D 45 Handle Via Approved For Release 200((6 4CRVpFR?f 8T04562A00030?0$ b Y LE ontro ystem nly ral d00?,dy.?d For Release 200OT/Ol/AEc8U-FWF~ 8T04562A000300080001-4 25X1 D Control System Only TCS-20114/70- IPIR 12 KH-4 MISSION 1109 DZHAMBUL IR/MRBM DIVISION HQ STATUS: OCCUPIED REMARKS; EARTH MOUNDING OF THE TRIPLE-SECTIONED BUNKERS APPEARS TO BE COMPLETE SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES 43*00 41N 071-23 10E 25X1A 25X1 D 25X1 D DZHAMBUL PROB IR/MRBM DIV HQ COMMO FAC 43-00-30N 071-23-40E NAC STATUS:COMPLETE REMARKS: THE SITE IS COMPLETE. 25X1A 25X1 D 25X1 D KHABAROVSK FAR EAST IR/MRBM ARMY HQ 48*-27*-00N 135-00-OOE 25X1A 25X1 D STATUS UNKNOWN REMARKS: THE IR/MRBM ARMY HQ CANNOT BE IDENTIFIED ON PHOTOGRAPHY. MISSILE ORDER OF BATTLES NONE DISCERNIBLE 46 Handle Via Approved For Release 200(1 12 1 1~~8T04562A0003000$QOyfr oLE control ystem my Ta~e'nR'htROyLed For Release 200%/ii~lNb-RW78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR, 12 SOVIET UNION KH-4 MISSION 1109 DEPLOYED STRATEGIC SSM FACILITIES 25X1 D 25X1 D 25X1D KOSTROMA ICBM COMPLEX 58-00-12N 041-22-25E 25X1A STATUS:OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX ARE OBSERVED. INCLUDING TEN NEWLY IDENTIFIED LAUNCH SITES WHICH WERE REPORTED IN THE OAK. NINE MISSILE RAIL CARS ARE IN THE RAIL-TO**ROAD, TRANSFER POINT NEAR THE SS-7` PROPELLANT STORAGE AREA. FOUR TANK CARS ARE-AT THE OFFLOADING RACKS IN, THE SS 11 PROPELLANT FACILITY, AND NINE UNIDENTIFIED RAIL CARS ARE ON THE RAIL SPURS IN THE RAIL-TO-ROAD TRANSFER POINT. POSSIBLE LAUNCH SITE 1024 CAN NOW BE CONFIRMED IN A MIDSTAGE OF CONSTRUCTION. NEWLY IDENTIFIED LAUNCH SITES 104Q AND 112Qr REPORTED TO BE IN AN UNDETERMINED STAGE OF CONSTRUCTION IN THE OAK, ARE IN A MIDSTAGE OF CONSTRUCTION. KREMOVO MRBM COMPLEX STATUS:OPERATIONAL Now -5 N 32-23-20E 25X1A REMARKS: ALL COMPONENTS OF THE COMPLEX ARE VISIBLEQ HOWEVER. THE TRANSFER POINT CAN BE IDENTIFIED ONLY, SNOW HAS BEEN REMOVED FROM THE PADS AT MRBM FIXED FIELD "SITE 1 AND MRBM LAUNCH SITES 1 AND 2. FOUR ERECTORS ARE VISIBLE AT MRBM LAUNCH SITE 2. TRACK ACTIVITY IS EVIDENT AT MRBM FIXED FIELD SITE 2. ANOTHER Handle Via Approved For Release 2000 f 23E9 F 8T04562A0003ogggr it-VIII n r s em Only T g 9Mpd For Release 200d1Qg/2ic&A-I~BPl8TO4562A000300080001-4 Control System Only TCS-2011/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 DEPLOYED STRATEGIC SSMFACILITIES 25X1 D 25X1 D LONG ARCH-ROOFED BUILDING IS UNDER CONSTRUCTION INSIDE THE CIRCULAR LAUNCH AREA AT SCALEBOARD SITE ]. WITH WORK CONTINUING ON THE INITIAL ARCH-ROOFED STRUCTURE. AN UNDETERMINED NUMBER OF VEHICLES OR PIECES OF EQUIPMENT ARE ALSO OBSERVED AT SCALEBOARD SITE t. SNOW HAS BEEN REMOVED FROM THE PADS AT SCALEBOARD SITE 2 WITH ONE AND POSSIBLY TWO VEHICLES VISIBLE. KURGANCHA MRBM COMPLEX 39-37-30N 065-55-30E 25X1A STATUS:OPERATIONAL REMARKS: ALL ELEMENTS OF THE COMPLEX ARE OBSERVED, NO TYPE III0 LAUNCH SITES ARE VISIBLE IN THE SEARCH AREA, 25X1D AT LAUNCH SITE 2 ON A MISSILE IS ALIGNED WITH AN ERECTOR ON ONE PAD AND A SECOND MISSILE ON TRANSPORTER IS 25X1D PARTIALLY OUT OF THE READY BUILDING SERVING THAT PAD. ON ? 25X1D AN EXERCISE IS POSSIBLY UNDERWAY ON ONE PAD AND ONE 25X1D MISSILE IS OBSERVED, ON TWO MISSILES ON TRANSPORTERS ARE VISIBLE, ERECTORS AND OBABLEPROPELLANT VEHICLES ARE VISIBLE.ONALL THREE DAYS. 25X1D AT LAUNCH SITE 1 ON ERECTORS AND VEHICLES OR 25X1D PIECES OF EQUIPMENT ARE VISIBLE.` AT LAUNCH SITE 3 ON THREE PROBABLE TRANSPORTERS ARE OBSERVED. 25X1 D 25X1 D TWO LONG RAIL CARS ARE AT THE TRANSFER POINT ON 8 Handle Via Approved For Release 200"p/2RCkti r-I BFF8TO4562A00030pgt$ b 'W y TARRrf I,,,d For Release 2000 Control System Only TCS-20114/10 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 DEPLOYED STRATEGIC SSM FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D NOVOSYSOYEVKA IRBM COMPLEX STATUS OPERATIONAL 2SIc8 F A~8T04562A000300080001-4 44-09-20N 133-28-1OE 25X1A REMARKS: ALL COMPONENTS OF THE COMPLEX AND THE SEARCH AREA ARE OBSERVED. NO SILO CONSTRUCTION IS NOTED. THE TRANSFER POINT CONTAINS AN UNDETERMINED AMOUNT OF MATERIAL/EQUIPMENT AND TWO POSSIBLE LONG RAIL CARS. AT LAUNCH SITE It FOUR ERECTORS AND AN UNDETERMINED NUMBER OF VEHICLES OR PIECES OF EQUIPMENT ARE VISIBLE, AT LAUNCH SITE 2r AN UNDETERMINED NUMBER OF VEHICLES OR PIECES OF EQUIPMENT ARE OBSERVED. SUCHAN MRBM COMPLEX 43- 6- ON 1.33-18-40E NAC STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX ARE. VISIBLE. AT LAUNCH SITE It A TRANSPORTER IS MATED TO AN ERECTOR ON ONE LAUNCH PAD AND A POSSIBLE ERECTED MISSILE IS ON. ANOTHER PAD, PROPELLANT VEHICLES ARE POSITIONED ALONGSIDE THE ERECTORS ON . ALL... LAUNCH PADS AT BOTH SITES, NO SILO CONSTRUCTION-IS OBSERVED IN THE SEARCH 25X1 D 25X1 D 25X1A 49 Handle Via Approved For Release 200((6W2ACR&F ?f8T04562A00030p0$t 0K?Y4OLE ontro System nly Trfty@d For Release 200th/ Control System Only 21E~B- Fl ' 8T04562A000300080001-4 TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 DEPLOYED STRATEGIC SSM FACILITIES TAMBOV MISSILE SUPPORT FACILITY 52-27-36N 041-27-50E 25X1D 25X1A STATUS; OPERATIONAL REMARKS; CONSTRUCTION CONTINUES IN THE AREA NW OF' THE FACILITY. NO SIGNIFICANT CHANGES IN NUMBERS OR TYPES OF EQUIPMENT ARE OBSERVED. 25X1 D 50 Handle Via Approved For Release 200( IW2 ftd&FQTT8TO4562A00030g0$1~4 OYfy oLE ontro ystem my T;appjrqMgd For Release 200d/H8/2V 8g A-FNf&8TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-++ MISSION 1109 MISSILE RANGES SIGNIFICANT RESULTS 25X1D EM3A MISSILE TEST. CENTER Ll.8. 38-//N 058-03-//E NAC 25X1A STATUS:OPERATIONAL 25X1 D MAKAT MRBM R/R TRANSFER POINT 47-47-37N 053-47-OOE 25X1 D NAC STATUS:OCCUPIED REMARKS: NUMEROUS POSSIBLE RAIL CARS ARE OBSERVED AT THE TRANSFER POINT, REMARKS: THE TEST CENTER IS COMPLETELY COVERED BY PHOTOGRAPHY. AT. THE EMBA MISSILE TEST CENTER LAUNCH COMPLEX. SNOW HAS BEEN REMOVED FROM ALL ROADS AND HARDSTANDS, AN UNDETERMINED NUMBER OF VEHICLES ARE OBSERVED IN BOTH LAUNCH AREAS. THE SA-4 SYSTEMS CHECKOUT AREA CONTAINS SEVERAL PIECES OF EQUIPMENT, SNOW HAS BEEN REMOVED FROM ALL HARD SURFACES AND TRACK ACTIVITY IS APPARENT, THE SA-'6 SYSTEMS CHECKOUT AREA IS COMPLETELY SNOW COVERED. CONTAINS NO EQUIPMENT. AND NO EVIDENCE OF TRACK ACTIVITY, 25X1A 25X1 D 25X1 D SARY-SHAGAN R + D RADAR FACILITY 2 45-56-/./N 073* 38m>/4 25X1A 25X1 D STATUS:OPERATIONAL REMARKS: THE FACILITY NOW APPEARS TO BE COMPLETE, Handle Via Approved For Release 2000pCW2AClRff-F g8TO4562A000309fldogA',-Y,l?l y Han*fjl0roved For Release 20d (8 cCREJARk 78TO4562A000300080001-4 Talent-K YHOLE Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 MISSILE RANGES 25X1 D TYURATAM AIRFIELD 1 45?-37--29N 063-12-32E 25X1D 25X1A STATUS:OPERATIONAL 25X1 D REMARKS: THE POSSIBLE GCA FACILITY REPORTED IN NOW CONFIRMED. AIR ORDER OF BATTLE: 25X1 D 1 CAT/CUB 9 COL T 1 COKE 5 MED IUM HELICOPTERS 4 CAB 25X1 D 2 CAT/CUB 6 COL T 1 COKE 2 MED IUM HELICOPTERS 6 CAB 25X1 D 2 CAT/CUB 7 COL 1 COKE 1 SMA 7 CAB T LL HELICOPTER 25X1 D OTHER RESULTS-NO APPARENT CHANGE MAKAT MRBM FIXED FIELD LAUNCH POINT 47-58-00N 053-42-OOE 25X1D NAC 25X1A 52 Handle Via Approved For Release 200"p/ CRt4-FROFF8TO4562A00030p ioVMt m-?y Ha AiT1~f Yed For Release 2001 81?. i 4J078TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 MISSILE RANGES STATUS:UNOCGUPIEC) MISSILE ORDER OF BATTLE** NONE DISCERNIBLE 25X1 D SARY-SHAGAN R + R RADAR FACILITY 1 46-0O-07N 073-39-O4E 25X1D NAC 25X1A STATUS OPERATIONAL 25X1 D 53 Handle Via Approved For Release 2000M29C. W 8T04562A00030QQ leAn y Han eti,VW yed For Release 200?81 MITA% 78TO4562A000300080001-4 TaI n Control System Only TCS-20114/70.- IPIR 12 SOVIET UNION KH-4 MISSION 1109 AIR DEFENSE MISSILES SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D CHEKHOV ABM/SPACE. RADAR SITE A 55-14-10N 037.18-OOE 25X1A STATUS:UNDER CONSTRUCTION REMARKS THIS TARGET WAS FORMERLY DESIGNATED NORTH OPERATIONS AREA. CHEKHOV PROBABLE ABM/SPACE TRACKING RADAR FACILITY. THE. SOUTH OPERATIONS AREA AND SUPPORT FACILITIES ARE NOW DESIGNATED CHEKHOV ABM/SPACE RADAR SITE B. AT RADAR SITE AP THE INITIAL EMPLACEMENT OF A SEGMENT OF AN ANTENNA STRUCTURE IS PROBABLY UNDERWAY. AT LEAST FIVE PROBABLE STRUCTURAL MEMBERS. PERPENDICULAR TO THE LONG AXIS OF THE 25X1D ANTENNA FOUNDATIONS AND SPACED APPROXIMATELY FEET) APART, ARE OBSERVED ON THE ANTENNA FOOTINGS . CLOSEST. TO THE CONTROL BUILDING, TWO OR MORE OF THESE MEMBERS MAY BE SLIGHTLY INCLINED. BUT ARE PROBABLY NOT IN THEIR FINAL POSITION. FOOTINGS ARE NOW PRESENT AT THE PREVIOUS LOCATION OF THE CENTRAL LINEAR FOUNDATION EXCAVATION. THE CONTROL BUILDING IS IN A MIDSTAGE OF CONSTRUCTION. AND IS APPROXIMATELY 25X1D OVERALL. ONE LARGE. AND TWO SMALLER CONSTRUCTION CRANES. AND NUMEROUS PIECES OF EQUIPMENT AND CONSTRUCTION MATERIEL ARE IN THE IMMEDIATE VICINITY OF THE CONTROL BUILDING AND THE. ANTENNA FOUNDATION. TWO ADJACENT. PARALLEL OPEN TRENCHES. WHICH MAY CONTAIN CONDUITS. EXTEND WESTWARD FROM THE VICINITY . OF THE CONTROL BUILDING AND THE ANTENNA FOUNDATION. ALONG THE NORTHERN SIDE OF THE MATERIEL STORAGE AREA. THE TRENCHES CONVERGE. AND THEN EXTEND SOUTHWESTWARD TOWARD THE ROAD WHICH CONNECTS RADAR SITES A AND B. OPEN TRENCHING DOES NOT PRESENTLY EXTEND BEYOND THE PERIMETER. APPROXIMATELY. THREE-QUARTERS.OF THE MATERIEL STORAGE AREA IS OCCUPIED BY CRATES. PERIMETER SECURITY FENCING IS BEING INSTALLED. 54 Handle Via Y O l E Approved For Release 2000pAP/2RCRE4q FRUFF8TO4562A00030?bQi6vj4t -unly iai .v~a ~l)ted For Release 20OT 8A~CgTA-P78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 AIR DEFENSE MISSILES NARO-FOMINSK ABM/SPACE TRKNG RDR FAC A 55-29^34N 036-41-30E 25X1D 25X1A STATUS:OPERATIONAL 25X1 D 25X1 D 25X1 D 25X1 D REMARKS: SEVERAL UNIDENTIFIED PIECES OF EQUIPMENT ARE STILL ADJACENT TO THE SSE ANTENNA. A NEW POSSIBLE STRUCTUREIS OBSERVED APPROXIMATELY ) WEST. OF THE NNW ANTENNA. NARO-FOMINSK ABM/SPACE TRKNG RDR FAC B 55-29-04N 036-3859E STATUSOPERATIONAL REMARKS: THE TREE CLEARANCE IN FRONT OF THE SSE ANTENNA IS COMPLETE. NO ADDITIONAL CHANGES ARE NOTED. SEVASTOPOL ABM/SPACE RADAR SITE 44>34.45N 03 25X1A 25X1D 25X1A STATUS.UNDER CONSTRUCTION REMARKS: CONSTRUCTION CONTINUES ON THE RADAR AND ITS ASSOCIATED SUPPORT BUILDINGS. THE CONTROL BUILDING OF THE DUAL HEN HOUSE RADAR IS EXTERNALLY COMPLETE AND FRAMEWORK FOR. BOTH OF THE ANTENNA BUILDINGS IS PROBABLY BEING ERECTED. THE OUTBOARD TERMINAL BUILDING FOR THE LEFT ANTENNA IS EXTERNALLY COMPLETE AND THE OUTBOARD TERMINAL BUILDING FOR THE RIGHT ANTENNA IS UNDER CONSTRUCTION. THERE ARE AT LEAST THREE OPERATIONS SUPPORT BUILDINGS IN AN EARLY STAGE OF CONSTRUCTION, HAZE PRECLUDES INTERPRETATION OF SMALLER BUILDINGS AND ACTIVITY IN THE SUPPORT AREA. YUyOLE Approved For Release 200g1~/4EC1RE4 FWff 8T04562A00030QA lw14t Anly Tale"nt tlUlyed For Release 20 dLQ88W? TA P78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KH-4 MISSION 11.09 25X1 D VERKHOYANSK HEN HOUSE SEA SOVIET UNION AIR DEFENSE MISSILES 67'35--//N 133-27-?//E 25X1 D STATUS: UNKNOWN REM 25X1A 25X1D ON THAN 1 PERCENT OF THE SEARCH AREA IS 11 25X1D COVERED. ON THE. ENTIRE SEARCH AREA 15 COVERED. NO HEN HOUSE ACTIVITY IS OBSERVED. 25X1 D 56 Handle Via OLE Approved For Release 200 '8P/2AClE=fEFF8TO4562A00030UJ~ I,,, niy Ha I Tare KEY1i0Eed For Release 200iQB/HCUI-R 78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KH-4 MISSION 1109 SOVIET UNION COMMO/ELEC/RADAR FACILITIES OTHER RESULTS-NO APPARENT CHANGE CHITA KRUG FACILITY 2 52-10-27N 113-*31-19E 25X1 D NAC STATUS;OPERATIONAL 25X1 D 6ULSHAD MICROWAVE FACILITY 25X1 D 25X1A 46uX36-OON 074-26-OOE NAC 25X1A STATUS:OPERATIONAL 25X1 D SERGEYEVKA KRUG FACILITY 1 48-X30-20N 135->17-5+E 25X1 D NAC STATUS: OPERATIONAL 25X1 D 25X1A 57 Handle Via A proved For Release 2 00 8TO4562A00030 nd EY OLE pp Qb7~~ 419 a my HaNIAfik ypd For Release 2006,Q@/Mc16A-fbg78TO4562A000300080001-4 Tre 11Y Control System Only TCS-20114170 -- IPIR 12 SOVIET UNION KH-4 MISSION 1109 AIR BASE. FACILITIES SIGNIFICANT RESULTS 25X1 D ASTRAKHAN AIRFIELD 46-16-54N 048-00-OBE NAC 25X1A 25X1 D STATUS:OPERATIONAL AIR ORDER OF BATTLE: 5 COKE 10 COLT 1 CRATE 10 CREEK ASTRAKHAN AIRFIELD NORTH WEST 46-23-52N.047-53-40E 25X1D 25X1A STATUS*OPERATIONAL REMARKS: 25X1 D EIGHT REVETMENTS HAVE BEEN CONSTRUCTED SINCE 25X1 D THE TWO LAUNCHERS UNDER CONSTRUCTION IN THE DROVE H FACILITY IN ARE NEARING 25X1 D LAUNC COMPLETION. AIR ORDER OF BATTLE: 10 BEAGLE I 46 SMALL SWEPT/DELTA-WING 8 CAB SMALL STRAIGHT-WING (AT LEAST) 2 MEDIUM HELICOPTERS 25X1 D MUROM AIRFIELD 55*-26-31N 042-18--47E 25X1 D NAC STATUS;OPERATIONAL AIR ORDER OF BATTLE: 6 LIGHT SWEPT-WING 6 POS5 HELICOPTERS 16 SMALL SWEPT/DELTA-WING 17 OTHER AIRCRAFT (AT (APPROXIMATELY) LEAST) 3 LIGHT STRAIGHT-WING 58 Handle Via Approved For Release 2000 ffl14t4@f F'Wff 8T04562A0003094j~ Ke ?~~y 25X1A T .p pd For Release 200x12v8/ 't-cC"tA-RBP78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 KH-4 MISSION 1109 SOVIET UNION AIR BASE FACILITIES 25X1 D 25X1 D 25X1 D NIZHNIY TAGIL AIRFIELD NORTHEAST 57>59-25N 060-13-47E NAC 25X1A STATUS: OPERATIONAL AIR ORDER OF BATTLE: 19 PROB SMALL 6 PROB AIRCRAFT SWEPT/DELTA-WING 2 POS5 AIRCRAFT 11 PROB. LIGHT. STRAIGHT-WING ORENBURG AIRFIELD SOUTHWEST 51-43-12N 055.02.52E 25X1 D NAC STATUS: OPERATIONAL AIR ORDER OF. BATTLE 80 AIRCRAFT (AT LEAST) 25X1 D 25X1A 25X1D TALDY KURGAN AIRFIELD NORTHEAST 45-07-ION 078.27-20E 25X1A STATUS:UNDER CONSTRUCTION REMARKS: RUNWAY CONSTRUCTION CAN NOW BE CONFIRMED AS COMPLETE. SURFACING OF THE PARALLEL TAXIWAY, A NEW PARKING APRON, AND END-CONNECTING AND CROSSOVER LINKS WITH PREFABRICATED CONCRETE. BLOCKS HAS BEGUN ALONG THE SW END. IN THE SUPPORT AREA ONE. ADMINISTRATION BUILDING OR MESSHALL, SIX, PROBABLE BARRACKS, AND TEN SUPPORT BUILPINGS,APPEAR TO BE EXTERNALLY COMPLETE. AT LEAST FOUR OTHER BUILDINGS ARE UNDER CONSTRUCTION. 59 Handle Via Approved For Release 200Q/QR/ [&Eg-F~UPF8TO4562A00030QQ t' M'Vn y H:e T pd For Release 2006,Qg/ifc9A-R~V78TO4562A000300080001-4 Control System Only TCS-20114/70 " IPIR 12 KH-4 MISSION 1109 AIR ORDER OF BATTLE. NONE DISCERNIBLE 25X1 D 25X1 D YENBEKSH.I AIRFIELD STATUS: OPERATIONAL SOVIET UNION AIR BASE FACILITIES 46 1-25N 080-50-50E 25X1A REMARKS: CONSTRUCTION OF THE WNW/ESE ASPHALT RUNWAY HAS BEEN COMPLETED, AND THE RUNWAY NOW APPEARS SERVICEABLE. THE PARALLEL TAXIWAY IS PARTIALLY RESURFACED WITH CONCRETE BLOCKS, ALTHOUGH THE NW PORTION MAY BE BLACKTOPPED. IN THE NW DISPERSAL AREA THE ROAD AND 13 HARDSTANDS HAVE BEEN HARD SURFACED, AT LEAST TEN ADDITIONAL HARDSTANDS AND.A PROBABLE READY BUILDING ARE UNDER CONSTRUCTION, AND A GRADED-EARTH ROAD HAS BEEN CONSTRUCTED. LINKING THE DISPERSAL AREA AND THE SUPPORT AREA, A POSSIBLE POL STORAGE AREA IS UNDER CONSTRUCTION ADJACENT TO THE SE EDGE OF THE PARALLEL TAXIWAY. TWO MULTISTORY PROBABLE BARRACKS ARE UNDER CONSTRUCTION IN THE SUPPORT AREA. PROBABLE CONSTRUCTION EQUIPMENT IS OBSERVED IN THE NE DISPERSAL AREAS, AIR ORDER OF BATTLE:. NONE DISCERNIBLE 25X1 D OTHER RESULTS-NO APPARENT CHANGE 25X1D EMBA AIRFIELD SOUTHWEST NAC STATUS:NOT OPERATIONAL AIR ORDER OF BATTLE:. NONE PRESENT 25X1D -~'B-40E 25X1A Approved For Release 200apop/2R>~R[q F JFF8TO4562A00030 JOV~J m-b?nly "%6 "' pd For Release 200419g/2 cUFd-gBF78TO4562A000300080001-4 Control System Only TCS-2011 +/70 - IPIR 12 SOVIET UNION KH-L MISSION 1109 AIR BASE FACILITIES FORT SHEVCHENKO AIRFIELD 25X1 D NAC STATUS;OPERATIONAL 25X1 D AIR ORDER OF BATTLE: NONE DISCERNIBLE 25X1A MOSKVA/SUPONINO AFLO TRACKING FACILITY 55-51-58N 037-57-35E 25X1 D NAC STATUS: OPERATIONAL 25X1 D 25X1 D 2-5X1 D OTROZHNOYE ICE STRIP NAC STATUS: OPERATIONAL AIR ORDER OF BATTLE: NONE DISCERNIBLE 25X1A 47E NAC STATUS. OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE. 25X1 D 25X1A 25X1A 25X1D LENINGRAD?ARMY BKS RADISHCHEVA AL 2 59- 6-31N 030-22-07E NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D LENINGRAD ARMY BKS YANINO NW AL 29 59~-57-^04N 030-34-0OE 25X1 NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1A 25X1A 72 Handle Via RNEYo~E Approved For Release 2000'ffl12q40Pf F8T04562A000309 em my T . ,9Kpd For Release 20041?B/H~Ui -RBff78TO4562A000300080001-4 Control System Only Tcs-20114/10 - IPIR 12 KH-4 MISSION 1109 25X1 D LENINGRAD ARMY DPO DX 1 25X1 D STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE LOZOVAYA MILITARY DEPOT DA 1 25X1 D NAC STATUS:OCCUPIED 25X1 D 25X1 D 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE LUBNY TRAINING AREA NORTH NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE MOSKVA ARMY BARRACKS FRUNZE AL 2 NAC 25X1 D STATUS:OCCUPIED 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SOVIET UNION GROUND FORCE FACILITIES 59-X53-08N 030-18-19E 25X1A 48-54--53N 036-21*-49E 25X1A 5O! O6-OON 033-01-OOE 25X1A 55-43-54N 037-35-1.5E 25X1A 73 Handle Via A roved For Release 200 8T04562A00030 n EY OlE pp ~~~~~~ Qb1~~9 ~em~nly H T :Ae ViVia d For Release 2000108/Z2c'~IA-R"fF H:A Vi ~l4al~e 78T04562A000300080001-4 25X1 D Control System Only TCS?20114/70 - IPIR 12 KH-4 MISSION 1109 SOVIET UNION GROUND FORCE FACILITIES PAVLOGRAD AMMO DPO NNW DA-1 4834-50N 035-50-55E 25X1 D NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1A P a RE S ARMY BARRACKS WEST AL 2 59-53-11N 029-52*-15E NAC 25X1A STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE PETRODVORETS ARMY BKS AND SCHOOL AL 4 59-51-35N 029-55-47E NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE ROSTOV AMMUNITION DEPOT NW DA 1 25X1 D NAC 25X1 D STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 47-X19-31N 039-37-29E 25X1A 25X1A -74 Handle Via Talent-KEYHOLE Approved For Release 20007O122EGRE4F# ff8TO4562A00030m08A(301e cbnly Han~~ l?e Via TTi~pp ~ CI1-~UJF Ta IAN d For Release 200 010'8/ U 78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-L- MISSION 1.109 GROUND FORCE FACILITIES 25X1 D 25X1 D SMELA MILITARY DEPOT DX 1 49.13- i N f31-52-59E 25X1 D NAC ROSTOV SIGNAL OCS 47-15-13N 039-41-30E NAC 25X1A STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1A 25X1 D 25X1D TURGEN ARMY BARRACKS AL-1 43.25.30N 077-36-50E NAC 25X1A 25X1 D STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLES NONE DISCERNIBLE VOZNESENSK AMMO DEPOT NW 47-38-OON 031-15-QQE 25X1 D MAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1A -75 Handle Via Talent-KEYHOLE Approved For Release 20001(W22EOR KF F8TO4562A000300089(10i-only 25X1 D Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Next 3 Page(s) In Document Exempt Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Hadle Via . ?cpd For Release 200d)99/9~UF~-k~978TO4562A000300080001-4 Control System Only TCS-20.11'"4' - IPIR 12 SOVIET UNION KH-L. MISSION 1109 INDUSTRY SIGNIFICANT RESULTS 25X1 D KRASNOARMEYSK SOLID MOTOR DEV FACILITY 56-09-15N 038-10-'OE 25X1A STATUS:OPERATIONAL REMARKS: THE FACILITY CONTAINS THE FOLLOWING ROCKET-ORIENTED FACILITIES -- DESIGN BUREAU 3, A POSSIBLE ROCKET MOTOR PRODUCTION PLANT, PROBABLE LABORATORY TEST AREAS. A ROCKET MOTOR TEST FACILITY, AN AERODYNAMICS LABORATORY. A ROCKET SLED TEST AREA UNDER CONSTRUCTION, A FIRING RANGE, AND AN IMPACT AREA. THE FACILITY IS ALSO BELIEVED TO PERFORM THE OPERATIONS OF THE ORIGINAL SOFRINO EXPERIMENTAL FIRING RANGE. WHICH APPARENTLY NOW CONSISTS OF MUNITIONS FRAGMENTATION TESTING, POSSIBLE MUNITIONS PENETRATION TESTING, AND MUNITIONS LOADING AND STORAGE. 25X1D A NEW BLAST MARK IS OBSERVED IN THE. SNOW. AT THE LARGE TEST CELL ON THE BLAST MARK WAS NOT PRESENT ON A 25X1D PROBABLE INSTRUMENTATION AREA APPEARS TO BE COMPLETE ON THE SE SIDE OF THE ROCKET SLED TEST TRACK AT THE POINT WHERE THE TRACK ENDS AND THE CONSTRUCTION OF THE PROBABLE WATER BRAKE BEGINS. A DARK STAIN IN THE SNOW IS OBSERVED NORTH OF THAT POINT. BLAST MARKS IN THE SNOW ARE EVIDENT IN AT LEAST TWO OF THE MUNITIONS FRAGMENTATION TEST CELLS. TWO LONG RAIL CARS ARE OBSERVED WITHIN THE ROCKET MOTOR TEST FACILITY,- 25X1 D B0 Handle Via Approved For Release 200q~?/ C& -FRgPF8T04562A00030gq 01?nly rai pjed For Release 2008//iGR?1T4 O78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 INDUSTRY 25X1 D OSKVA SPACE RESEARCH FAC TOMILINO 55-39-58N 037-56-05E 25X1A STATUS:OPERATIONAL REMARKS: 25X1D IN THE SPACE RESEARCH AREAP CONSTRUCTION ON THE LY BUILDING, FIRST REPORTED UNDER CONSTRUCTION IN IS NOW COMPLETED. AN ADMINISTRATION-TYPE BUILDING. FIRST REPORTED IN 25X1D SAND ADJACENT TO THE NEW ASSEMBLY BUILDING, IS ALSO COMPLETED* IN THE SUPPLY DEPOT AREA, CONSTRUCTION ON A LARGE 25X1D DOUBLE-BAY ASSEMBLY BUILDING, FIRST REPORTED IN APPEARS TO BE COMPLETED, ASSOCIATED OBJECTS: 1 SMALL POSS HELICOPTER 25X1 D (OTHER RESULTS-NO APPARENT CHANGE KREMENCHUNG VEHICLE TEST AREA 49-06-//N 033-33-//E 25X1 D NAC 25X1 D STATUS;OPERATIONAL ASSOCIATED OBJECTS: NONE DISCERNIBLE LENINGRAD ARTILLERY R + D RANGE 25X1 D NAG 25X1A 60-00-//N - - 25X1A 81 Handle Via Y OLE Approved For Release 200('0V CjRF f 8T04562A00030QQA %M my Haiti igLyed For Release 200 8 R J t 78TO4562A000300080001-4 Control System Only TCSr-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 INDUSTRY 25X1 D ROSHAL CHEMICAL PLANT KOSYAKOV.14 NAC 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 55*40-24N 039-52-45E 25X1A STATUSOPERATIONAL 25X1 D 25X1 D 25X1 D 25X1 D SHOSTKA CHEM EXPLOS + AMMO LDG PLT 9 M& MM - ~" -~43E NAC 25X1A STATUS: OPERAT I ONAL ASSOCIATED OBJECTS: NONE DISCERNIBLE SVERDLOVSK HVY EQP P URALMASH ORDZH 56-52-54N 06035-49E NAC 25X1A 25X1 D STATUS:OPERATIONAL YAROSLAVL DIESEL ENGINE PLANT 3 57-38-40N 039--50-30E 25X1D NAC 25X1A STATUS: OPERATIONAL 82 Handle Via Approved For Release 200(ye12ACR FWFf'8TO4562A00030Qpi#" X,-y? ?;y 25X1 D Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Approved For Release 2000/08/22 : CIA-RDP78TO4562A000300080001-4 Tai l RLyed For Release 200 8kiCR?I l78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 MISCELLANEOUS SIGNIFICANT.RESULTS 25X1 B OTHER RESULTS--NO APPARENT CHANGE 25X1 B VLADIMIR COMPLEX 25X1 D NAC STATUS;OCCUPIED 25X1 D 56>08-40N 040*-25-15E 25X1A 84 Handle Via T Ign -KEYHOLE Approved For Release 2000 ir23E%LqF F8TO4562A000300QJ609le,n!bnly HanA TH y T aed For Release 200 Rt1~4&91~78TO4562A000300080001-4 Control System Only TCS-20114/70 - IPIR 12 SOVIET UNION KH-4 MISSION 1109 MISCELLANEOUS 25X1 D VOLOGDA COMPLEX 59-13-20N 039-53-40E 25X1D NAG 25X1A STATUS OPERATIONAL 25X1 D 85 Handle Via Approved For Release 200OV(W2A(QL4-FMFF8TO4562A0003OQp4#V~ ?;y Approved For Release 2000/lDR2SEeBEtDP78TO4562A000300080001-4 001046352 Approved For Release 2000/ 2SEgRETZDP78T04562A00030008~-4