KH-4 MISSION 1109 IPIR NUMBER 16 OAK SUPPLEMENT PART XII 5-23 MARCH 1970

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04562A000300120001-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
85
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 5, 2004
Sequence Number: 
1
Case Number: 
Publication Date: 
April 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04562A000300120001-9.pdf3.14 MB
Body: 
25X' Approved For Release 2004/06/23 : CIA-RDP78TO4562A000300120001TGP SECRET NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER WUPT111- 1- ME M------T PHOTOGRAPHIC INTERPRETATION REPORT KH-4 MISSION 1109 IPIR NUMBER 16 OAK SUPPLEMENT PART XII 5-23 MARCH 1970 TOP SECRET 25X1 APRIL 1970 COPY NO ... 2.07 ..88...PAGES AUTOMATIC DOWNGRADING OAK-061/70 ANApprovealror Release 2004/06/23 :CIA-RDP78T04562A000300120001-9 Approved For Release 2004/06/23 : CIA-RDP78TO4562A000300120001-9 25X1 TARGET CATEGORIES AND ASSOCIATED NTP FUNCTIONAL AREAS (CODES) t. STRATEGIC SSM Deployed Strategic SSM Facilities (A) 2. MISSILE RANGES Missile Ranges, Strategic SSM/Space Facilities ( Missile Ranges Air -Launched Missile Facilities (0) Missile Ranges.- Naval - Launched Missile Facilities (R) Missile Ranges- tactical SSM Facilities (S) Missile Ranges: SAM/AMM Facilities (T) 3. AIR DEFENSE MISSILES Deployed AMM Facilities (B) Deployed SAM Facilities (D) 4- ELECTRONICS/ COMMUNICATIONS Deployed Communication/Electronic/Radar Facilities (C) 5. AIR Air Base Facilities (E) 6. NAVAL Naval Base Facilities (Fl 7. GROUND Ground Force Facilities (G) 8. TACTICAL SSM Deployed Tactical SSM Facilities (H) 9. LOGISTICS Military Logistics Facilities (K) 10. NUCLEAR ENERGY Atomic Energy Facilities (0) ii. CBR CBR Facilities (V) 12. INDUSTRY Strategic Weapons Industrial Facilities (J) General Purpose Weapons Industrial Facilities (L) Non -Military Industrial Facilities (N) Communication/Electronic/Radar R&D Facilities (U) 13. MISCELLANEOUS Non-Military Logistics Facilities (M) Miscellaneous/Unidentified Facilities (Z) These thirteen target categories are compatible with the Functional Area of imagery Interpretation established under the National Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional association (i.e_ missile range tracking facilities are reported under "MISSILE RANGES, fly-away airfields at aircraft plants are reported under "INDUSTRY, airfield nuclear weapons storage facilities are reported under'"AIR" etc.). 00 ,04685 1 U')t'U847 Approved For Release 2004/06/23 : CIA-RDP78TO4562A000300120001-9 25X1 ed For Release 2o9q/06j5RlS& IPIR 16 109 TABLE OF CONTENTS PAGE 25X6 25X6 PREFACE MISSION HIGHLIGHTS CHINA. COMMUNIST COMMO/ELEC/RADAR FACILITIES KOREA # NORTH GROUND FORCE FACILITIES INDUSTRY MISCELLANEOUS SOVIET UNION. DEPLOYED STRATEGIC SSM FAC'IL'ITIES MISSILE RANGES AIR DEFENSE MISSILES COMMO/ELEC/RADAR FACILITIES AIR BASE FACILITIES GROUND FORCE FACILITIES DEPLOYED TACTICAL SSM FACILITIES LOGISTICS INDUSTRY MISCELLANEOUS 14 33 35 36 39 45 66 67 76 81 83 85 87 25X1 25X1 Approved For Release 2 4 pft/ft I ed For Release 220F0&ERER RDP78T 4562A000300120001-9 IPIR 16 PREFACE 1.09 PREFACE THIS I THE TWELFTH OAK SUPPLEMENT REPORT ON MISSION 1109, FOR COMPLETE PREFACE SEE THE FIRST OAK SUPPLEMENT REPORT. 1 Approved For Release 2Q?QfQf ft It 25X1 25X1 25X1 Approve Id For Release 220& cRE k.1 ~ IPIR 16 KH06--59N 127-35528E 25X1A 25X1 D 25X1 D 25X1 D STOR'AREA 7 ARTY'REGT NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE: 8 PROB FA PIECES 8 POSS FA PIECES PAECHON-UP ARMY BARRACKS WEST STATUS : OCCUPIED 25X1A KOREA. NORTH GROUND' FORCE FACILITIES 31-55-25N 126>35 25 PROB TRUCKS. (APPROXIMATELY) 18 Approved For Release 20,10P5EERI 9-35N 4E 25X1 25X1 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D Approved Ff KH-4 MISSI or Release 20A10X:'&A IPIR 16 KOREA, NORTH GROUND FORCE FACILITIES PHYSICAL DESCRIPTION: 1.4 NM WNW OF PAE" CHON*.UP. THE FACILITY CONSISTS OF THREE BARRACKS. ONE AUDITORIUM, AND SEVEN SUPPORT BUILDINGS. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SANGMA-DONG ARMY BARRACK 25X1A 38-08-p8N 126X51"25E STATUS OCCUPIED THE FACILITY CONSISTS OF TWO BARRACKS. TWO VEHICLE. SHEDS. TWO SUPPORT BUILDING Sr FOUR REVETTED ARTILLERY POSITIONS WITH REAR PHYSICAL DESCRIPTION: 720 METERS (0.4 NM) WSW OF SANGMAVPDONG. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SEPI.'BONG ARMY GENERAL SUPPLY DEPOT STATUS. OCCUPIED 25X1A 38'35-10N 126-40-33E RFMARKS' 25X1A THIS INSTALLATION IS REPORTED AS A PART OF MAYU^*DONC STORAGE DFPOT 25X1 D 25X1 25X1 25X1 Approved For Release 20T'j6/SSCRl DP78T04562A000300120001-9 25X1 25X1 D 25X1 D 25X1 D 25X1 D Approve d For Release Io0R/49391,A-RDP78 IPIR 16 KH 4 MISSION.1109 25X1 D TURIBONG MILITARY STORAGE STATUS: OCCUPIED PHYSICAL DESCRIPTION: 1.7 NM NE OF TURI.BONG. THE FACILITY CONSISTS OF THREE BARRACKS AND THREE SUPPORT BUILDINGS. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE YONAN ARMY BARRACKS 25X1A KOREA# NORTH GROUND FORCE FACILITIES 25X1 38,2 JON 126*42-++0E 126+0'7 10E STATUSOCCUPIED PHYSICAL DESCRIPTION: 2.5 NM SW OF YONAN. THE FACILITY CONSISTS OF TEN BARRACKS. 33 QUARTERS. ONE ?!.SHAPED MESSHALL. 15 SUPPORT BUILDINGS. A SIX..POSITION AAA SITE, SIX PROBABLE MORTAR POSITIONS. AND FOUR REVETTED WEAPONS POSITIONS. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE . e 20 25X1 Approved For Release 20fe(p6/Stt I DP78T04562A000300120001-9 25X1 25X1 D STATUS: OCCUPIED 3~5944ON 26-10-31E PHYSICAL DESCRIPTION: 5.1 NM NORTH OF YONAN. THE INSTALLATIONi COVERING AN EXTENSIVE AREA ON BOTH SIDES OF A RIDGE, CONSISTS OF 47 BARRACKS. 11, QUARTERS. FOUR ADMINISTRATION BUILDINGS (ONE L*-SHAPED )r ONE AUDITORIUM, ONE TSHAPEL MESSHALL. AND APPROXIMATELY 20 SUPPORT BUILDINGS. GROUND FORCE ORDER OF BATTLE: 4 REVETTED VEHICLES 25X1 D OTHER RESULTS*-NO APPARENT CHANGE 25X1 D Approve For Release 20'99/089P~'/ IPIR 16 KOREA. _NORTH 109 GROUND FORCE FACILITIES YONAN MILITARY BKS + STOR AREA C ,HA*RI ARMY BARRACKS NORTHEAST 1 NAC STATUS;OCCUPIED GROUND FORCE. ORDER OF BATTLE NONE DISCERNIBLE 25X1 D 25X1 D CHIHAr*RI ARMY BARRACKS NORTHEAST 3 NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 21 Approved For Release 2063ECM- 38 38 4 26.44-2 33A1 26-4 -47E 25X1 25X1 25X1 25X1 D Approved For Release 21O&?0 -RDP7 - IPIR 16 KH*-4 MISSION 1109 25X1 D CHILCHON-DONG ARMY BARRACKS + STOR NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D CHILCHON-DONE ARMY BARRACKS + STOR NE NAG STATUS OCCUPIED GROUND' FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D CHILCMON-DONE ARMY SUPPLY DEPOT STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D KOREAS NORTH GROUND FORCE FACILITIES 38-3 4 A126-33-48E 380 Z& ,,26" 35-22E 38-3 1'126 33- 25X1 25X1 Approved For Release 20fflr/itCRMDP78T04562A000300120001-9 25X1 Approved IPIR 16 KOREA. NORTH 109 GROUND FORCE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D CHOMOAE-GOL HO 5 INFkREGT + ARMY BKS STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE. NONE DISCERNIBLE ARRACKS AREA For Release 20Sh?iRE RDP78T0 562A000300120001-9 25X1 NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE HAECHONwN HQ 29 MORT REGT + BKS AREA NAC STATUS. OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE Approved For Release 20W19ttfll 23 38-30146A27-24-59E 37-:59. X25-560" 521.27 28-47E 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D KH-4 MIS Approved For Release 20&ECRE IPIR 16 ION 1109 HAEJU ARMY BARRACKS NORTHEAST STATUS:OCCUPIED GROUND FORCE ORDER OF. BATTLES NONE DISCERNIBLE HAMHUNG HQ 7TH ARMY GROUP NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE HYONGJE-DONG ARMY BARRACKS SOUTHWEST NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE! NONE DISCERNIBLE 2.4 Approved For Release 20 K.OREA.NORTH GROUND FORCE FACILITIES 395 O1et 127-32. 0.0E .126-34-58E 25X1 25X1 25X1 25X1 D 25X1 D KAN Approve SO HQ 3RD ARMY GROUP STATUS. OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE K c O MILITARY AREA NE 25X1 D NAC 25X1 D 25X1 D 25X1 D 25X1 D STATUSOCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE STATUS.OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KOREA. NORTH GROUND FORCE FACILITIES 38.5'72-%c4 Aj250-28-2oE 39*-O P~ 125 33-OOE KANGSO MILITARY BARRACKS + STOR AREAS NAC STATUS. OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KOSAN STORAGE AREA NAC Approved For Release 20fflP/ CIS 38-4--'-W 125--27.48E 38-50 b1 :2.7.24-oaE 25X1 25X1 25X1 Approved or Release 2M & ffR I1 DP78 4562A000300120001-9 25X1 KOREA# NORTH GROUND FORCE FACILITIES 25X1 D KUNNO-RI ARMY BARRACKS NAC STATUS:OCCUPIED 25X1 D 25X1 D STATUS.OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D MAKTAE-R 25X1 D Y BKS AND STORAGE AREA NAC STATUSOCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KWANTO HQ 3 ARTY REGt BKS EXPL STOR r:':~' `.$xst*!ta 26 Approved For Release'2~p- 38-28 1"fJ X27-22.47E X4AA 38-3A- _ _ 126-35-57 38< 3 5 i26-.35-19E 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D Approved 25X1 D MAYU-DONE STORAGE DEPOT NAC STATUS:OCCUPIEO GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE ORYUJGAE ARMY BARRACKS NE NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE PYONGYANG ALT HQ MND PUG NAC STATUS. OCCUPIED GROUND FORCE ORDER 1. OF BATTLE'. NONE DISCERNIBLE 27 Approved For Release 2jVP6$ t.qt- KOREA# NORTH GROUND FORCE FACILITIES 38-352-+ 6 ( 1.2600 50E 391V2rbfV126-45,-1OE 9-004yk 1251, 25X1 25X1 25X1 Approves For Release 20U /0A3C'NL DP78T 4562A000300120001-9 IPIR 16 KOREA' NORTH 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D KH 4I MISSION 1109 PYONGYANG ARMY BARRACKS NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE PYONGYANG ARMY BKS + STORAGE AREA EAST NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE PYONGYANG BARRACKS + VEH MAINT AREA Se NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE Approved For Release 20 65FC GROUND FORCE FACILITIES 49-0721W 1125-45-20E 25X1 39-03~I ~ 5152-40E 57J1i 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D Approved For Release 20/06WUA- IPI( 16 KH-4 MISSION 1109 PYONGYANG ORDNANCE DEPOTN TONGPO-RI NAC STATUSOCCUPIED GROUND FORCE ORDER OF BATTLE': NONE DISCERNIBLE SAES---IMAK BKS AREA + HO 17 RECON SDE NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE S NGYE ARM BARRACKS NE 25X1 D NAC STATUSOCCUPIED 25X1 D 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SOKCHONG-BONG' HQ 24 MORT REGT/aKS/STgI STATUS OCCUPIEb KOREA. NORTH GROUND FORCE FACILITIES 39-04AM A 25-44" 20E 38->06ZUAA125. 47 20E 36-3 -CIO 1A1e 6-33m 50E 38-41Z%4AA: 26-" 25X1 25X1 Approved For Release 20Pff 6RC gDP78T04562A000300120001-9 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D Approved F br Release 20UA63C6ADP78T0 IPIR 16 KH-4 MISSION 1109 GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SOK;HON-NI HQ 9 ARTY REGT + BKS AREA NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SONGHUNG NCO TRNG STN + BKS NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE KOREA. NORTH GROUND FORCE FACILITIES -.1431 126 36-19W'4 126 37-'50E 39-'59279 127-*38-34E 25X1 25X1 HON?NI'BKS/STOR + HQ 9TH INFDIV Approved For Release 20 65230 25X1 25X1 D 25X1 D For Release 20^94/099RJAI-RDP78T SONG-DONG ARMY BARRACKS NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D SUNGHO-r ONG MIL STORAGE AREA NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE:. NONE DISCERNIBLE SUNGHO-DONE aTORAGE + BKS AREA NE NAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE Approved For Release 2060 ffT- KOREAP NORTH GROUND FORCE FACILITIES 38-27 x2f1 i 5-34E 38-542W AL26-01-21E 1 -1 39'0 Z jJA126-02-45E 25X1 25X1 25X1 25X1 D NAC STATUS :OCCUPIED GROUND FORCE ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D LVZx 1 V I -UP HQ 37TH INF DIV STATUSOCCUPIED NAC GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D KOREA # NORTH GROUND FORCE FACILITIES 40**11 AA124>3 30-5XAU` 125-25-O15E 25X1 25X1 Approved For Release 2104/0WRE A IPIR 16 KH+*4 MISSION 1119 UIJt1 MILITARY INSTALLATION Approved For Release 21W65FCffH 25X1 Approved ~ or Release /SKRE4 PIR 16 KOREA, NORTH 9 INDUSTRY SIGNIFICANT RESULTS SONGNIM IRON + STEEL PLANT HWANGHAE 25X1 D NAC 38-44 9ti 125-37.12E PHYSICAL DESCRIPTION: ON THE SW EDGE OF SONGNIM. THE LARGE COKE, IRON, AND STEEL COMPLEX INCLUDES TWO COKE OVEN BATTERIES AND AN ASSOCIATED BY-PRODUCTS, AREA AT THE NW EDGE OF THE PLANT, A ROLLING MILL AND SMALL ADJACENT OPEN HEARTH SECTION IN THE CENTER OF THE COMPLEX, AND THREE BLAST FURNACE AREAS (ONE UNDER CONSTRUCTION) WITH TWO LARGE AND FOUR MEDIUM BLAST FURNACES, TWO PROBABLE BLAST FURNACES UNDER CONSTRUCTION, ASSOCIATED HOT STOVES, AND ORE HANDLING EQUIPMENT IN THE SE SECTION OF THE PLANT. SUPPORT FACILITIES INCLUDE TWO TRANSFORMER YARDS, COOLING TOWERS, A SLAG PILE, OPEN STORAGE, A WATER TREATMENT PLANT, AND APPROXIMATELY 100 SUPPORT BUILDINGS. 25X1 D OTHER RESULTS-NO APPARENT CHANGE HUICHON MACHINE TOOL PLANT PUG 25X1 D NAC STATUS:OPERATIONAL 25X1 D Approved For Release 2f, 33 o Rf 40-102?f A126-14-20E 25X1 25X1 25X1 25X1 D 25X1 D Approved KOREA, NORTH INDUSTRY 39-4549,'i26-16-03E VEHICLE PLANT NAC STATUS:OPERATIONAL Approved For Release 20'4'()?6/gttRLA DP78T04562A000300120001-9 25X1 25X1 25X1 Approved F~ KOREA. NORTH MISCELLANEOUS SIGNIFICANT RESULTS 25X1 D 25X1 D SUNCHON-COMPLEX Release 20 90X! k RDP78T 4562A000300120001-9 25X1A 39>25-35N 8E STATUS:OPERATIONAL PHYSICAL DESCRIPTION: THE COMPLEX, APPROXIMATELY 4 5QMI"IN AREA. CONSISTSS%OF SEVERAL SMALL INDUSTRIES. ANV ACTIVE' CHEMICAL FERTILIZER PLANT ON THE WFST SIDE OF THE RIVER. AND TWO ACTIVE' CLASSIFICATION YARDS. ONE. ON THE EAST SIDE OF THE RIVER. HAS FOUR TRACKS. THE OTHER. ON THE WEST SIDE OF THE RIVER. CONTAINS AT LEAST i2 TRACKS. A TURNTABLE. A PASSENGER STATION. AND NUMEROUS ASSOCIAT D SHOPS AND SUPPORT BUILDINGS. LIGHT DEFENSE POSITIONS ARE OBSERVED THROUGHOUT THE AREA. INDUSTRIAL ACTIVITY APPEARS LIGHT. 35 Approved For Release 20ppfP6/3E j1?. 25X1 25X1 25X1 STATUS:OPERATIONAL SIGNIFICANT RESULTS DROVYANAYA ICBM COMPLEX 25X1A 25X1 D 25X1 D 25X1 D REMARKS: ALL COMPONENTS OF THE COMPLEX, EXCEPT LAUNCH SITES 291- 301. 31I- 361, 371- AND 40I. ARE OBSERVED NO SIGNIFICANT MISSILE ACTIVITY IS NOTED. DROVYANAYA SCALEBOARD LAUNCH SITE 3 Approved ~ or Release 200490X4A IPIR 16 SOVIET UNION 109 DEPLOYED STRATEGIC SSM FACILITIES NAC STATUS:UNOCCUPIE:D S1-28-OON 13-01 27 33N 112-56"55E 25X1A PHYSICAL DESCRIPTION: 6 NM SSW OF DROVYANAYA SCALEBOARD LAUNCH SITE 1, THE SITE IS IN A PARTIALLY WOODED AREA ASTRIDE A SECONDARY ROAD 25X1D LEADING WEST FROM THE COMPLEX MAIN ROAD AND CONSISTS OF NINE VFE-POSITIONING POINTS ARRANGED IN A CIRCLE. THE SIZE AND ARRANGEMENT OF THE NINE VEE POSITIONS AND.THEIR ORIENTATIONS ARE IDENTICAL TO THOSE OF DROVYANAYA SCALEBOARD LAUNCH SITE 2. 25X1 D THE SITE WAS PRESENT ON A WAS NOT PRESENT ON WHEN THE SITE WAS F:R..:T VISIBLE- THERE HAS BEEN NO EVIDENCE THAT THE LAUNCH POSITIONS HAVE EVER BEEN OCCUPIED. MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D A SUPPLY DEPOT PROB SSM 25X1A 36, Approved For Release 206523CRIp 54-33-26N 036-2i*~IOE 25X1 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D Approved or Release 2d0qF06f23': X- L?fl.P18104562A000300120001-9 IPIR 16 SOVIET UNION 109 DEPLOYED STRATEGIC SSM FACILITIES STATUS :OCCUPIED REMARKS: SEVERAL LONG ROWS OF VEHICLES OR.MATERIAL`ARE IN THE NE PORTION OF THE FACILITY. GROUND FORCE ORDER OF BATTLE. 20 VEHICLES OR PIECES OF EQUIPMENT (APPROXIMATELY) VEHICLES AND PIECES OF EQUIPMENT (AT LEAST) KOZELSK ICBM COMPLEX 25X1A 035-45-40E STATUS:OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX ARE OBSERVfiD. INCLUDING THE SEVEN NEWLY IDENTIFIED SS-11 LAUNCH SITES IN LAUNCH, GROUP Q PREVIOUSLY REPORTED IN THE OAK FOR THIS MISSION. LAUNCH SITES a.i1N, 1040, 1050. 1060. 1090. 112Pr lisp, 116P', 118P. 120P. 121P, AND 122P ARE NOW COMPLETE. THIS MAKES ALL OF THE LAUNCH SITES IN LAUNCH GROUPS No Or AND P COMPLETE'. THERE ARE NOW TEN LAUNCH GROUPS COMPLETE. G THROUGH P. _LAUNCH SITE 124Q IS IN A MIDSTAGE OF CONSTRUCTION. 37 Approved For Rele Pse`2dW6IS,FtRtq 25X1 25X1 25X1 Approved f{ or Release 200'4/08/,4!`gI -RDP78 04562A000300120001-9 IPIR 16 KH -4 MISSION 1109 25X1D PERVOMAYSK'IRBM COMPLEX 25X1A 25X1 D 47*P58 30.56.30E STATUS:OPERATIONAL REMARKS: ALL ELEMENTS OF THE COMPLEX. INCLUDING THE EIGHT'NEWLY IDENTIFIED TYPE III. LAUNCH SITES WHICH WERE'REPORTED IN. THE OAK FOR THIS MISSION, ARE OBSERVED EXCEPT , TYPE IIYb SITES 5r 6r 8. 11P12, 14. 15, 16P 17.1 23..35. 37. AND 38.A ND POSSIBLE SITES 32 AND 33. POSSIBLE SITE 30C IS NOW A CONFIRMED SITE IN THE MIDSTAGE OF CONSTRUCTION LAUNCH, SITES 18, 19. AND 20 IN THE B GROUP AND 27, 28. AND 36 IN THE d GROUP ARE NOW. COMPLETE. SITE 25 IN THE I) GROUP IS IN A LATE STAGE OF CONSTRUCTION AND SITES 26 AND 29 IN THE D GROUP ARE IN A'MIDSTAGE OF CONSTRUCTION. CONSTRUCTION CONTINUES ON THE VISIBLE' PORTION OF' THE NEW. RAIL-TO'-ROAD TRANSFER POINT. TWO POSSIBLE SS-5 TRANSPORTERS ARE AT PERVOMAYSK IRBM LAUNCH SITE It AND THREE PROBABLE SS-'S TRANSPORTERS ARE OBSERVED AT PERVOMAYSK IRBM LAUNCH SITE'2'. Approved For Release 20 38 6)SE1RET SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES 25X1 25X1 25X1 KUULI MAYAK CRUISE MISSILE' TEST FAC DET or Release 20'09106173~'CTi4- IPIR 16 109 SIGNIFICANT RESULTS 25X1 D 0 STATUSNOT OPERATIONAL REMARKS: ALL OF THE SHADDOCK EQUIPMENT AND THE UNIDENTIFIED TRANSPORTERS IN THE ASSEMBLY AND CHECKOUT AND STORAGE AREAS HAVE BEEN REMOVED. THE BOARD FENCE. AROUND THE STORAGE BUILDING IS BEING DTSMANTLED SOVIET UNION MISSILE RANGES 40 2 4N 052'-43-37 47 44N 0490m SASYKTAU. MISSILE LAUNCH FACILITY 25X1 D NAC 25X1 D STATUS. OCCUPIED REMARKS: VEHICLES OR PIECES OF EQUIPMENT ARE'OBSERVEDIN THE MISSILE SUPPORT AND HANDLING AREA. .E TEST CENTER 25X1 D THE COMPLEX IS COMPLETELY COVERED ONI ATAM MISS STATUS: OPERATIONAL REMARKS: 39 Approved For: Release200@F6$EER T DP78T04562A000300120001-9 2544456-40N 25X1 D 25X1 25X1 25X1 KH-. MISSION 1109 MISSILE RANGES 25X1 D PARTIALLY COVERED ON AT LAUNCH COMPLEX A r THE ARMS OF' THE SERVICE' TOWER ARE IN A HORIZONTAL POSITION AT PAD Al. IN THE SUPPORT FACILITY. THE ANNEX TO THE SPACECRAFT FACILITY APPEARS TO'BE NEARING COMPLETION. 25X1 D 25X1 D 25X1 D 25X1 D AT LAUNCH COMPLEX B. SEVERAL SMALL VEHICLES OR PIECES OF EQUIPMENT (V/PE') ARE OBSERVED AT LAUNCH PAD 02-AND SEVERAL SMALL CONSTRUCTION SUPPORT BUILDINGSHAVEBEEN REMOVED FROM THE EAST SIDE OF THE COMPLEX SUPPORT FACILITY. IN LAUNCH COMPLEX C', SMALL V/PE ARE OBSERVED AT C1 AND C3 AND THE PREVIOUSLY REPORTED CYLINDRICAL VEHICLE IS ONTHELOOPROAD EAST OF Cl. SEVERAL V/PE ARE OBSERVED THROUGHOUT THE SUPPORT FACILITY. AT LAUNCH. COMPLEX D ON THE RIGHT SILO DOOR AT D1 IS OPEN AND ON THE LEFT SILO ' DOOR" IS OPEN AND THE' PROBABLE FIRST AND SECOND STAGE OF A MISSILE y I%F% ON` THE LOOP ROAD. ALL THREE SILO DOORS ARE CL.OSEDON AT LAUNCH SITE D2 ONI ASILO LOADER IS IN A VERTICAL ATTITUDE AT THE PRACTICE POSITION AT THE EDGE OF THE APRON IN FRONT OF THE SILOS. 25X1D AT LAUNCH COMPLEX E. AN UNUSUALLY LARGE NUMBER OF V/PE ARE OBSERVED IN THE COMPLEX ON ONE LONG V/PE PARKED ON LAUNCH PAD El APPEARS TO BE SIMILAR TO AN SS-9 SILO LOADER SUGGESTING THAT THIS COMPLEX ISAEING USED AS A SUPPORT AREA FOR GROUND SUPPORT EQUIPMENT FOR SSw9 SILOS.'OTHER LONG 25X1 D V/PE IN THE COMPLEX; COULD BE FUEL OR OXIDIZER' TRANSPORTERS., -25X1 D 25X1 D 25X1 D 25X1 D FEWER LONG V/PE ARE OBSERVED AT COMPLEX EON WHEN PROPELLANT OPERATIONS ARE OBSERVED AT SITES 17 AND P5 ON THAT DAY FURTHER SUGGESTING THAT SS"9 VEHICLES ARE OPERATING FROM THIS COMPLEX ON SIX V/PE ARE IN. THE SITE AREA AT LAUNCH COMPLEX F. ON THREE V/PE ARE OBSERVED THERE. AT LAUNCH COMPLEX G IN'LAUNCH AREA G1-G2. THE STRUCTURE OUTSIDE OF THE SECURITY FENCE AND NORTH OF THE LAUNCH AREA IS IDENTIFIED AS A POSSIBLE LAUNCH PAD. SINCE THE LAST COVERAGE OF THE LAUNCH AREA. A RAIL'SPURHAS BEEN EXTENDED FROM % THE LAUNCH AREA NORTHWESTWARD FOR APPROXIMATELY 880 METERS. (2,887 FEET) WHERE IT WISHBONES AND EXTENDS BACK TOWARD THE POSSIBLE LAUNCH PAD. THE POSSIBLE LAUNCH PAD CONSISTS OF A RECTANGULAR STRUCTURE APPROXIMATELY 34 X 12 METERS (112 X 39 -:40 Approved For Release `Op%V fft4DP78T04562A000300120001-9 25X1 25X1 25X1 Approved D /0XR IA RDP78 SOVIET UNION MISSILE RANGES FEET) WITHIN-AN EXCAVATION AND A STRUCTURE APPROXIMATELY 12 METERS (39 FEET) SQUARE AT THE NORTHWEST EDGE OFTHE 25X1D EXCAVATION. THE LONG AXIS OF THE RECTANGULAR STRUCTURE IS S 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 2 5X1 D THREE LONG V/PE ARE'ON THE HI SIDE, AND A STRING OF RAIL CARS 25X1 D IS ON THE H2 SIDE. ONI FOUR PROBABLE TANK' CARS- AND ' 25X1D TWO POSSIBLE. CRYOGEN CARS. ARE RAIL CARS IS ON THE H2 SIDE. ON THE THE HI SIDE, AND A STRINGOF STRING OF RAIL CARS ON THE H2 SIDE APPEARS TO BE IN ALMOST THE SAME POSITION ON 25X1 D 41 W ORIENTED ON AN A41MUTH OF TO MALL CONSTRUCTION SUPPORT BUILDINGS RTHWEST OF THE EXCAVATION. TODATE THE AREA AROUND THE POSSIBLE-LAUNCH PAD' HAS NOT BEEN SECURED. THERE WAS NO EVIDENCE OF CONSTRUCTION OF THE POSSIBLE LAUNCH PAD, ON, IF AND THE FIRST EVIDENCE OF CONSTRUCTION WAS OBSERVED ONI ONLY THE RAILBED EXTENDED TO THE POSSIBLE LAUNCH PAD. HOWEVER, ONI -1 A_ WORK TRAIN ENGAGED IN TRACK CONSTRUCTION WAS OBSERVED AT THE NORTHWEST FENCE LINE OF THE LAUNCH AREA, AND BY TRACK HAD BEEN'LAIDTO THE END OF THE NEW SPUR. SINCE THE POSSIBLE LAUNCH PAD TS ONLY AN EXTENSION TO LAUNCH AREA G1A-G2A IT DOES NOT , CONSTITUTEA NEW TARGET. HOWEVER. TO FACILITATE IDENTIFICATION O' INDIVIDUAL LAUNCHERS, THE LAUNCH AREA HAS BEEN REDESIGNATED LAUNCH AREA G1. FURTHER REFERENCES TO INDIVIDUAL LAUNCHERS WILL BE A. Be AND C AS FOLLOWS -- GXA RETAINS, THE SAME DESIGNATOR, G2A BECOMES LAUNCH PAD G1B, AND THE NEW POSSIBLE LAUNCH PAD % BECOMES G1C. ON AN EMPTY TRANSPORTER' IS PARKED ON THE ' PAD AT GXA. AT LAUNCH AREA 63"G4# THE GANTRIES ARE PARKED AT THEIR USUAL POSITIONS TO THE REAR OF'THE PADS, AND AN EMPTY TRANSPORTER IS PARKED ON THE . RAIL SPUR NEAR PAD G3 ON ALL FOUR 5X1 D DAYS. ONI A PROBABLE LOCOMOTIVE WITH ONE CAR IS MOVING AWAY FROM G3. STRUCTURES ARE UNDER CONSTRUCTION IN THE EXCAVATIONS NORTHWEST OF EACH LAUNCH PAD. WHAT APPEARS TO BE A CONDUIT IN A LINEAR EXCAVATION EXTENDS BETWEEN ONE OF THE STRUCTURES' AND LAUNCH PAD 64. THE GANTRY IN' LAUNCH AREA G5-G6 25X1D IS FORWARD ON PAD G6 ON E- 1, AND APPROXIMATELY gU CANISTERS ARE NOW STORED IN THE LAUNCH REA,, IN THE SUPPORT FACILITY FOR COMPLEX, 6, TWO CIRCULAR EXCAVATIONS APPARENTLY' FOR ADDITIONAL TANKAGE HAVE BEEN DUG IN THE WATER FACILITY. IN LAUNCH COMPLEX He ONE TRANSPORTER IS IN THE SAME POSITION ON 25X1D THE RAIL SPUR BETWEEN LAUNCH PAD H1 AND' THE HI, READY BUILDING ON SIX PROBABLE TANK: CARS ARE ON THE RAIL SPUR SERVING THE HI SIDE OF THE AREA. AND A 25X1D STRING OFDIRAILI CARS ISAON THE~SPUR~SERVINGi THE H2hSIDE. _ON, E] 25X1 25X1 D 25X1 Approved For Release W6153FDP78T04562A000300120001-9 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D Approved SOVIET UNION MISSILE RANGES IN LAUNCH GROUP I NO ACTIVITY IS OBSERVED AT LAUNCH SITES I2, I. I5, AND 16. V/PE ARE OBSERVED AT LAUNCH SITES Ii AND 17. AT 17 ONI THE NORTH AND SOUTH SILO DOORS ARE OPEN AND A SMALL V/PE IS AT EACH OF THOSE SILOS. ON ALL SILO DOORS ARE CLOSED. AT THE NORTHERN SILO, FOUR PROBABLE FUEL TRANSPORTERS, TWO PROBABLE TRANSFER VANS, AND FOUR SMALL V/PE ARE AT THE SILO. WITHIN THE SITE AND ALONG THE ACCESS ROAD TO THE SILOS ARE NINE LONG AND ONE SHORT V/PE. THE NINE LONG VEHICLES ARE PROPELLANT-TYPE VEHICLES. AT LAUNCH SITE I4. THE STLO DOOR IS PARTIALLY OPEN ON AT LAUNCH. COMPLEX J ONI BOTH , TRANSPORTER ERECTORS ARE PARKED AT THE NORTH END OF THE VEHICLE ASSEMBLY BUILDING (VAB). ONI ONE TRANSPORTER ERECTOR IS PARKED AT THE NORTH END OF THE VAB AND THE OTHER IS AT LAUNCH PAD J2 IN AN ERECTED POSITION. SHADOW ANALYSIS SUGGESTS THAT A PORTION OF A LAUNCH. VEHICLE IS BEING ERECTED. THE ROTA ' r, SEkVILE~ TOWER IS PARKED IN THE AWAY-FROM-THE-PAD POSITION. ONE TRANSPORTER ERECTOR IS PARKED AT THE NORTH END OF THE VAB. LAUNCH PAD 42 IS CLOUD COVERED, BUT ENOUGH OF THE ROTATING SERVICE TOWER CAN BE SEEN TO DETERMINE THAT THE TOWER IS AT THE PAD. LITTLE IF ANY REPAIR HAS BEEN EFFECTED ON LAUNCH PAD J1 ALTHOUGH A CRANE APPEARS TO BE WORKING OVER THE APERTURE. TWO POSSIBLE LATTICEWORK ILLUMINATION TOWERS ARE LYING ON THE GROUND ADJACENT TO THE BASES OF THE TWO WHICH WERE DESTROYED, SUGGESTING THAT REPLACEMENT OF THE TOWERS IS IN PROGRESS. THE. BUILDING WHICH HAS BEEN UNDER CONSTRUCTION NORTH OF J1, HAS BEEN BACKFILLED. BUT THERE IS A CLUTTER OF MATERIAL NEARBY, AND THE BUILDING DOES NOT YET HAVE A CLEAR FINISHED APPEARANCE. THERE ARE STILL OPEN DITCHES NEAR THE NORTHEAST END OF THE INTERPAD AREA. A DITCH OR LINEAR MOUND HAS BEEN EXTENDED FROM THE PROBABLE INSTRUMENTATION BUILDING AT THE EDGE OF THE CONCRETE APRON AND NORTHWEST OF LAUNCH PAD J2. THE DITCH OR MOUND IS STRAIGHT. AND EXTENDS NORTHWESTWARD TO AN UNIDENTIFIED OBJECT OUTSIDE OF THE SECURITY FENCES. AN OPENING. HAS SEEN MADE IN THE CONCRETE APRON APPROXIMATELY 213 METERS (700 FEET) SOUTH OF LAUNCH PAD J2"AND A SHORT LINEAR EXCAVATION HAS BEEN DUG AT THAT POINT. A RECTANGULAR EXCAVATION HAS BEEN DUG SOUTH OF J2 IN THE AREA FORMERLY OCCUPIED BY THE DESTROYED CONSTRUCTION SUPPORT BUILDINGS. APPROXIMATELY 15 RAIL CARS ARE PARKED ON RAIL SPURS ON THE J2 SIDE OF THE LAUNCH AREA. AMONG THESE'ARE TWO LIGHT-TONED PROBABLE TANK-TYPE CARS APPROXIMATELY IN LENGTH AND IN DIAMETER. 42 Approved For Rek se 201/ 25X1 25X1 25X1 For Release 200q?0612'f ? k- DP78 4562A000300120001-9 IPIR 16 SOVIET UNION 109 MISSILE RANGES AT THE SPACECRAFT INTEGRATION FACILITY., THE- BUILDING WHICH HAS BEEN UNDER CONSTRUCTION APPEARS TO BE EXTERNALLY COMPLETE. BUT OPEN DITCHING STILL REMAINS IN THE VICINITY. CONSTRUCTION CONTINUES ON THE. BUILDING AT THE SOUTHEAST CORNER OF THE VAB. VERTICAL AND HORIZONTAL STRUCTURAL MEMBERS IN PLACE INDICATE THAT THE BUILDING WILL HAVE THREE BAYS. THE LONG AXIS OF THE BAYS WILL BE PERPENDICULAR TO THE LONG AXIS OF THE VAB. THE BUILDING IS IN THE PROCESS OF BEING, ROOFED. THE PROBABLE HEATING AID?POWERPLANT WEST OF THE VAB NOW APPEARS TO BE EXTERNALLY COMPLETE. IN LAUNCH GROUP K. UNIDENTIFIED?ACTIVITY IS OBSERVED AT K2, WORK 'APPEARS TO BE IN PROGRESS AT THE WEST END OF THE SILO 25X1 D DOOR. BUT THE SCALE' OF THE PHOTOGRAPHY DOES NOT ' P ERMI 25X1D IDENTIFICATION OF THE OPERATION IN PROGRESS. A SMALL CRANE IS WORKING' OVER THE OPEN SILO AND SEVERAL 25X1D SMALL V/PE ARE PARKED NEAR THE SILO ON'ALL THREE'DAYS. THE 25X1 D 25X1 D 25X1 D SILO DOOR IS CLOSED ON IN LAUNCH GROUP L. SMALL V/PE ARE OBSERVED' AT: LAUNCH. SITESS..' L2 AND L4. AT LAUNCH SITE L7 ON AN ' SS- I SILO LOADER IS POSITIONED NEAR THE SILO. AND A, PROBABLE' TRANSPORTER IS PARKED ON THE TURN-AROUND PORTION OF THE ACCESS,. ROAD. A SMALL V/PE IS PARKED ALONGSIDE THE PROBABLE TRANSPORTER.. NO ACTIVITY IS OBSERVED AT THE SITES OF LAUNCH GROUPS M OR 0. IN LAUNCH GROUP Ne SMALL V/PE'ARE OBSERVED AT LAUNCH SITES N AND N2. WITH THE EXCEPTION OF LAUNCH SITE P5, NO ACTIVITY IS NOTED IN LAUNCH GROUP P. AT LAUNCH SITE P5 ONI APPROXIMATELY EIGHT SMALL V/PE ARE PARKED NEAR THE SILO. ON FIVE LONG PROBABLE PROPELLANT VEHICLES AND ONE LONG AND TWO SHORT V/PE ARE PARKED ON THE LOOP ROAD. FOUR SMALL IV/PE ARE PARKED TO THE REAR OF THE SILO THREE LONG PROBABLE PROPELLANT VEHICLES AND ONE SMALL V/PE ARE ON THE ACCESS ROAD JUST OUTSIDE OF THE SECURITY FENCE. ),Sri iti THE SITES AT LAUNCH GROUP Q ARE NOW ALL IN A MIDSTAGE OF, CONSTRUCTION. THE SILO HEADWORKS WALLS ARE PARTIALLY UP AND THE SITE ACCESS ROADS ARE BEING CONSTRUCTED. AT LAUNCH SITE Qtr THREE TANKS ARE ADJACENT TO THE HEAbWORKS, FIVE TANKS ARE IN THE-EXCAVATION BY THE CONTROL BUNKER, AND SIX MORE ARE AT THE EDGE OF THE EXCAVATION. AT THE TYURATAM SPACE TRACKING FACILITY'. A " U-SHAPED, CRANE IS IN POSITION OVER THE NEW PEDESTAL AND A DISH ANTENNA IS UNDER 43 25X1 25X1 Approved For Rehe4.-pe,29JOf ISECR&TF DP78T04562A000300120001-9 25X1 25X1 D Approve CONSTRUCTION ON THE GROUND' ON THE WEST SIDE OF THE PEDESTAL. IN THE MAIN SUPPORT BASE. SEVERAL NEW BU4.61 GS ARE UNDER CONSTRUCTION AT THE POL. FACILITY ON THE WEST EDGE OF THE CONSTRUCTION SUPPORT FACILITY. OTHER RESUL.TS**N6APPARENT CHANGE' 25X1 D 25X1 D 25X'1 D 25X1 D KAPUSTIN YAR TRACKING FACILITY D STATUS:OCCUPIED REMARKS: NO NEW RADAR SITES ARE OBSERVED. KAPUSTIN YAR/LAKE' EL.T?N TRACKING FAC NAC STATUSOCCUPIED RFMARKS t NO NEW RADAR ' SITES ARE' OBSERVED. Approved For:?Relea&e 2464106/73 48 SOVIET UNION MISSILE RANGES 2129"b4T'. 4"41 E 25X1 49..092 AD4600; -44E 25X1 25X1 or Release 2IM&EEREl -RDP78T Approved ~ IPIR 16 KH*-4 MISSION 1109 SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D ARTYK SAM SITE A34-2 STATUSOCCUPIED ASHKH^.BAD SAM SITE A08-2 NAC STATUS: OCCUPIED AS'HKHABAD SAM SITE B32002 TRAKHAN SAM SITE A14-2 STATUS'. OCCUPIED NAC ASHKHABAD SAM SITE C11-2 STATUS:OCCUPIED NAC STATUS: OCCUPIED NAC 45 Approved For Release 20p6P6 jeERFT 37**3722%1 it159-16.34E SOVIET UNION AIR DEFENSE MISSILES 3->582-+ NA056-30-12E 1 -1 3e-O ? b58, ,9 37M43 11 ` 058-54 00E I-- I 46 12E 25X1 25X1 25X1 Approved Fq 25X1 D Release 200'4/0612'3"9I1 PIR 16 9 25X1 D ASTRAKHAN SAM SITE A34w2 25X1 D 25X1 D NAC STATUS: OCCUPIED RAKHAN SAM SUPPORT FACILITY NAC STATUS*OOPE RATIONAL ASTRAKHAN SAM SUPPORT FACILITY 2 NAC STATUS:OPERATIONAL SOVIET UNION AIR DEFENSE' MISSILES 46>2-1'047 46-29~0` 047-56-50E 4 2g `047-51-40E REMARKS! NUMEROUS VEHICLES OR PIECES OF EQUIPMENT ARE OBSERVED IN THE FACILITY ABAYEVO SAM COMPLEX C30-5 25X1A 25X1 D -53N 0 LITTLE CHANGE, IS. OBSERVED SINCE CONSTRUCTION CONTINUES AT LAUNCH POSITIONS Cl AND C2. STATUS: OCCUPIED RF_MARKSS at 0, 0 pp fOP6*ECR&TA roved For Release 20 DP78T04562A000300120001-9 5-21-10E 25X1 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D WIOX IA DP78 04562A000300120001-9 SOVIET UNION AIR DEFENSE MISSILES MISSILE ORDER OF BATTLE: ,.,. LAUNCH AREA A LAUNCHERS 4 UNIDENTIFIED RADARS BARANO.ORENBURGSKOYE MRBMCPLX SAMA34-2 44- gEAWI31.22-50E 25X1 D 1 -1 MAC STATUS OCCUPIED 25X1 D 25X1 D 25X1 D 25X1 D REMARKS: THE SITE IS PROBABLY OCCUPIED. BARANO-ORENBURGSKOYE SAM SUPPORT FAC NAC STATUS OPERAT I ONAL REMARKSI THE FACILITY IS PROBABLY OPERATIONAL. BELCOROD-DNESTROVSKIY SAM SITE B2SAN2 STATUSUNOCCUPIEQ, 47 Approved For Release 20TOPSECRE 1' MOBILE TALL' KING ANTENNA TRACKING AND GUIDANCE FACILITY UARE PAIR RADARS AIR WARNING RADAR FACILITY 2gN " 1.31.22-49E 4408E 25X1 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D Approved For Release 21900WREAA IPIR 16 109 SARY.OZEK SAM SITE A15-2. STATUS:OCCUPIED NAC S `V OZEK SAM SITE BO NAC STATUS*oCCUPIED 25X1 D S - EK SAM SITE B24-2 STATUS*OCCUPIED 25X1 D SOVIET UNION AIR DEFENSE MISSILES 4F4 2t3Z 1'%77-?59-56E OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D ASHKHABAD PROB SAM SUPPORT FACILITY 2 STATUS: UNKNOWN NAC 25X1 D ASHKHABAB SAM SITE A05-2 STATUS * UNOCCUPIED 61 Approved For Release 20W65ECRff 44 10 38012 58-24FE 7-38-19E 411 "058-10-2 37"592?6"4"058-26 25X1 25X1 Approved 25X1D ASMKHABAD SAM SITE A28-2 25X1 D 25X1 D 25X1 D STATUS UNOCCUPIED ASHKMABAI AM SUPPORT FACILITY STATUS=UNKNOWN 25X1D ASTRAKHAN SAM SITE B232 STATUS.UNOCCUPIED 25X1 D 25X1 D BARANO'-ORENBURBSKOYE SAM SITE A05 *2 25X1 D NAC NAC NAC STATUSUNOCCUPIE? 25X1D BARANO 25X1 D 25X1 D NAC STATUS g UNOCCUP IED MOSKVA SAd NAC SOVIET UNION AIR DEFENSE MISSILES A058 37 555 LI '%5 5-30E 6-40E 46-102?40047-48-.0 1E u4-21296 ) 037-18 62 ORENBURGSKOYE SAM SITE B19A2 ITE B31-2 45E 25X1 25X1 Approved For Release 2GW65PCjjFf RDP78T04562A000300120001-9 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D Approved or Release 2 94/06/ c?Eil4-RDP7$ID4562A000300120001-9 IPIR 16 109 STATUS: UNOCCUPIED R1= MARKS: THE SITE IS UNOCCUPIED. HOWEVERP SOME ' SNOW' RE'MOVAL IS EVIDENT. NAZAROVO SAM SUPPORT FACILITY NAC STATUS: UNKNOWN NIZHNIY TA6IL'SAM COMPLEX D07-5 STATUS UNKNOWN Y TAGIL SAM SITE B27-2 NAC STATUS:UNOCCUPIED NIZHNIY TAGIL SAM SITE C13-2 STATUS:UNKNOWN 25X1 D NAC Approved For Release 20 W/4~ECRE1 SOVIET UNION AIR DEFENSE MISSILES 090.26-12E S8-CI N~# 060NO! 57 29 AD 59- 57.4 &4060- 25X1 25X1 25X1 For Release 20Q410ikc' A-kDP78T04562A000300120001-9 25X1 Approve SOVIET, UNION AIR DEFENSE MISSILES 25X1D NOVOSYSOYEVKA SAM SITE B10-2 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D STATUS:UNOCCUPIELD OLGA SAM SITE A19*-2 STATUS; UNKNOWN NAC SAMARKAND SAM SITE 829-2 NAC STATUS:UNOCCUPIED SAMARKAND SAM SITE C06--2 NAC STATUS: UNOCCUPIED S MAR AND SAM SITE C07-2 NAC STATUS: UNOCCUPIED 64 25X1 Approved For Release 20 6RJEC ~DP78T04562A000300120001-9 44-0f*91`1.3 43 42 WA135-17.20E 39>41P4 066.40 26E 39-5xZ% OO67M22"0 E' 39-51i `O 67"29-59E -48->0OE 25X1 25X1 D 25X1 D 25X1 D Approved SARY-OZEK SAM SITE B29-2 NAC STATUS UNOCCUPIED 562A000300120001-9 SoViET UNION AIR DEFENSE MISSILES ~8 1IA077"* 25X1 25X1 Approved For Release 20yIOPgtCR ` 25X1 ASTRAKHAN AW RADAR FAC NW SOVIET UNION COMMO/ELEC/RADAR FACILITIES SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D STATUS:OPERATIONAL PHYSICAL DESCRIPTION: 4.3 NM NW OF ASTRAKHAN AND 2.5 NM WEST OF ASTRAKHAN TALL KING-AD HO RADAR FACILITY, THIS SECURED SITE CONTAINS, THE FOLLOWING RADARS -- TWO BAR LOCK ON MOUNDS (ONE APPARENTLY BEING HARDENED), ONE ROCK CAKE OR STONE CAKE ON A MOUND (FROM WHICH TRACKS LEAD INTO A SHELTER'). ONE PROBABLE BACK NET ON A MOUND. AND ONE SQUAT EYE. THIS FACILITY ALSO CONTAINS TWO PROBABLE BARRACKSp ONE ADMINISTRATION BUILDING. ONE PARADE!. GROUND OR DRILL FIELD, 18 STORAGE OR SUPPORT BUILDINGS, TWO DRIVETHROUGH. BUNKERS. TWO DRIVE-THROUGH REVETMENTS' THREE DRIVE-IN BUNKERSi ONE CROSS-SHAPED REVETMENT. AND NUMEROUS POL DRUMS. THIS AW RADAR FACILITY HAS PREVIOUSLY BEEN REPORTED UNDER ASTRAKHAN TALL KING-AD HQ RADAR FACILITY. Approved ELECTRONIC ORDER OF BATTLE: 2 BAR LOCK 1 ROCK CAKE/STONE CAKE N M CROWAVE FACILITY STATUS. OPERATIONAL 1 PROB BACK NET 1 SQUAT EYE 25X1A 5i-53-00N O750>5i-2oE PHYSICAL DESCRIPTION. 8.5 NM NE OF MAYKAIN. THIS SECURED FACILITY CONTAINS ONE SELF-SUPPORTING MICROWAVE TOWER, ONE CONTROL BUILDING. AND TWO SUPPORT BUILDINGS. THE SMALL SCALE OF THE PHOTOGRAPHY PRECLUDES IDENTIFICATION OF THE TYPE AND THE ORIENTATION OF MICROWAVE ELEMENTS. 66 Approved For Release 2"~65PC'Rff 25X1;24-,2ON 047-55-45E 25X1 25X1 25X1 ALEKSANDRIYA AIRFIELD EAST SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D or Release 209'4/061P 1A NAC STATUS:OPERATIONAL AIR ORDER OF BATTLE.: 8 PROB HOOK (AT LEAST) BEZHETSK AIRFIE D NAG STATUS: OPERATIONAL L14 036 8-59E 4562A000300120001-9 SOVIET UNION AIR BASE FACILITIES AIR ORDER OF BATTLE: 25 SMALL SWEPT/DELTA-WING I LIGHT STRAIGHT-WING (AT LEAST) BRYAN NAC STATUS: OPERATIONAL AIR ORDER OF BATTLE. 10 LIGHT STRAIGHT-WING K AIRFIELD NIGOVKA AIRFIELD 25X1A 19-14t1 STATUS, OPERATIONAL s4, 67 Approved For Release 20TfIQ6/gECRL` DP78T04562A000300120001-9 53"; 111 034V*2O-~07E 2 SMALL STRAIGHT-WING 25X1 25X1 25X1 25X1 D 25X1 D 25X2 25X1 D 25X1 D Approved REMARKS: CONSTRUCTI For Release 2U'6f/0ik9~ET -RDP78 04562A000300120001-9 AIR ORDER OF BATTLE 1A HEAVY HELICOPTERS 43 MEDIUM HELICOPTERS N CONTINUES ON THE 31 PROBABLE HANCARETTES REPORTED DNEPROPETROVSK/VOLOSHKOYE AIRFIELD NAC STATUS: OPERATIONAL AIR ORDER OF BATTLE: I COOKPOT 2 CODLING 2 COKE 1 POSS COKE 3 CRATE 1 CAB. 5 COLT SOVIET UNION AIR BASE. FACILITIES 48 *24At)35-05-44E 34 SMALL-SWEPT-WING (AT LEAST, ONE AIRBORNE) 1 HEAVY HELICOPTER 25X1 25X1 68 Acpproved For Release 6fp6/SfCR`f 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D Approved or Release JQRAFRT -RDP78 IPIR 1.6 KH-4 MISSION 1109 6USNAYA LYABA AIRFIELD STATUS:OPERATIONAL 0 AIR ORDER OF BATTLE: NONE DISCERNIBLE KACHA AIRFIELD STATUS:OPERATIONAL AIR ORDER OF, BATTLE: 2 PROB CRATE :3 POSS CAB KALININ AIRFIELD STATUS: OPERATIONAL 25X1A SOVIET UNION AIR BASE FACILITIES 53-25-16N 078-25-44E 25X1 D 444w4 ' *033m*3 25 HELICOPTERS (AT LEAST) 25X1A 56-t9- 4525E REMARKS: THE REFERENCE POINT (RP) IS THE CENTER OF THE 2.530-METER (8#300-FOOT) RUNWAY. THE 26 VEHICLE OR EQUIPMENT, REVETMENTS 4F57 METERS (1,500 FEET) SOUTH OF THE RP APPEAR TO BE COMPLETE 25X1 25X1 Approved For Release 20pep6aECR f~DP78T04562A000300120001-9 25X1 25X1 D 25X1 D OBSERVED HERE. AIR ORDER OF BATTLE: 44 PROB BADGER or Release 200'4PO5Z3" '&A IPIR 16 109 THE NORMAL COMPLEMENT OF BADGER APPEARS. TO BE RETURNING TO THE AIRFIELD. IN it mu BADGER WERE 25X1D KIROVSKOYE AIRFIELD 25X1 D 25X1 D 25X1 D SOVIET UNION AIR BASE FACILITIES 5 LIGHT STRAIGHT-WING 45.04501 STATUS;OPERATIONAL AIR ORDER OF'BATTLE 1 PROB BADGER 1 2 COOT 8 10 SMALL DELTA-WING 1 5 SMALL SWEPTWING 3 6 SMALL SWEPT/DELTA-WING 5 1G SMALL PROS SWEPT/DELTA-WING (AT LEAST) 3 KLAN AIRFIELD MEDIUM STRAIGHT-WING LIGHT STRAIGHT-WING SMALL STRAIGHT-+WXNG HEAVY HELICOPTERS , MEDIUM HELICOPTERS (AT LEAST) SMALL. PROB' AIRCRAFT 56-21 1 ` 036-44-07E STATUS*OOPERATIONAL AIR ORDER OF BATTLE: 11 CAT/CUB/CAMP 3 COKE 8 CRATE 2 CAB I MEDIUM SWEPT--WING 46 SMALL SWEPT/DELTA-WING (AT LEAST) 2 SMALL STRAIGHT-WING 25X1 25X1 70 Approved For Release 20gIW/SSECRE1 DP78T04562A000300120001-9 35.11.13E 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D or Release 2094/06'AM A IPIR 16 09 KRIVOY ROG AIRFIELD EAST STATUSOPERATIONAL AIR ORDER OF BATTLE: 21. cAT/CUB KURSK AIRFIELD EAST NAC I MEDIUM STRAIGHT-WING 4 LIGHT STRAIGHT-WING MELTTOP0 AIRFIE 0 NAC STATUS:OPERATIONAL AIR OR OF BATTLE: 13 BEAGLE 57 CAT/CUB Approved For Release 204OP61SECR STATUS OPERATIONAL AIR ORDER OF BATTLE: 7 LIGHT STRAIGHT-WING -RDP78T 42 SMALL' STRAIGHT-WING 46 SMALL. STRAIGHT-WING SOVIET UNION AIR BASE FACILITIES 4'70459 W ? 3 wm4 *036-11731E 46m52~54) 035 *I8710E 2 CAB 3 SMALL DELTA-WIN 25X1 25X1 25X1 25X1 D 25X1 D OW/O NAC STATUS :OPERATIONAL 25X1 D AIR ORDER OF BATTLE: 20 AIR R T (AT LEAST) 25X1 D 25X1 D 25X1 D 9 CAT/CUB/CAMP 2 COKE or Release 20Q/0OfZ13 . ~1 IPIR 16 09 TAFYEVO AIRFIELD LONG RANGE AVIATION STATUS. UNKNOWN REMARKS $ TARGETS OF' THIS TYPE CANNOT BE IDENTIFIED ON, OVERHEAD 25X1A PHOTOGRAPHY. THIS INSTALLATION 'MAY BE COLLOCATED WITH I OSKVA ARMY BARRACKS FRUNZE AL 21 --if 25X1 D 72 Approved For Release 20P(yP65ECR1ff 10 CRATE 12 CAB SOVIET UNION AIR BASE FACILITIES 29E 2548 3-5 N 037-34-19E 25X1 25X1 25X1 25X1 D 25'X1D 25X1 D 25X1 D or Release 2199109P9 A IPIR 16 OKTYABRSKCYE AIRFIELD NAC STATUS: OPERATIONAL AIR ORDER OF 8ATTLE3 23 BADGER OREL AIRFIELD SOUTHWEST NAC STATUS: OPERATIONAL AIR ORDER OF BATTLE': 2P SMALL AIRCRAFT (AT LEAST) P Ck)I i K AIRFIELD 25X1 D STATUS OPERATIONA 25X1A 52 562 A036 1 -1 541 REMARKS: AT LEAST 50 AIRCRAFT REVETMENTS HAVE BEEN CONSTRUCTED. AIR ORDER OF BATTLE: 3 LIGHT STRAIGHTWING 30 SMALL AIRCRAFT (AT LEAST) . . . . T3 Approved For Release 20 6R&ECW SOVIET UNION AIR BASE FACILITIES jc~ `034.06-07E 2 SMALL' STRAIGHT-WING .28-24E 25X1 25X1 25X1 Approved FFr Release 3c T J 25X1 2r Release 06'31I A 4562A000300120001-9 F STATUSsOPERATIONAL AIR ORDER OF BATTLE: SOVIET UNION AR I ASE FACIL`TIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D P00OLSK/OUBROVITSY AIRFIELD = SMALL STRAIGHT-WING (AT LEAST) 25 SMALL STRAIGHT-WING SEVASTOPOL/BELBEK AIRFIELD i SMALL, STRAIGHT-WING (AT LEAST) NAC STATUS:OPERATIONAL AIR ORDER OF BATTLE: 9 SMALL SWEPT/DELTA WIN (AT LEAST) 3 LIGHT STRAIGHT-WING 552*5N ' 037-29OOE POSS HELICOPTERS 44-4 *'A1 0,330034-33E 2 POSS HELICOPTERS (AT LEAST) 25X1 14 Approved For Release 20T 1 6/SECR~A P78T04562A000300120001-9 25X1 SOVIET UNION AIR BASE FACILITIES ERU.. OVSK/KOLTSOVO AIRF E' D 25X1A 56-44-42N O6Ol>48-52E 25X1 D STATUS:OPERATIONAL RFMARKS< THE MAIN, E/W RUNWAY AND ITS ASSOCIATED TAXIWA S AND PARKING S W RU tWAY AND THE APRONS MADE BEEN CLEARED4 OF SNOW. THE ENE 'W NF/SW RUNWAY ARE SNOW COVERED BUT ARE PROBABLY SERVICEABLE. 25X1 D 25X1 D 25X1 D 25X1D 25X1 D AIR ORDER OF BATTLEt 2 BADGER/CAMEL 1& MEDIUM STRAIGHT-WING YEFRE OV AIRFIELD STATUS:OPERATIONAL AIR ORDER OF BATTLE: 4 CAT/CUB/CAMP YEVPATORIYA AIRFIELD STATUS OPERATIONAL AIR ORDER OF BATTLE: 7 MEDIUM STRAIGHT-WING LEAST) NAG NAC '75.. Approved For Release 2O1J L6I$ECREA IGHT STRAIGHT WING 53-*O` O3+ 17 SMALL SWEPT/DELTA-WING 1,4-#9E 1 t 33.22" 26E 25X1 25X1 25X1 SIGNIFICANT RESULTS 25X1 D BAKHC ISARAY. A 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D MY BARRACKS AL 1 NAC STATUSOCCUPIED GROUND FORCE ORDER OF BATTLE: 30 VEHICLES OR PIECES OF EQUIPMENT (AT LEAST) DNEPROPETROVSK ARMY BARRACKS AL 2 NAC STATUS OCCUPIED REMARKS: OR PATTERNS ARE OBSERVED. BUT THE SMALL SCALE OF' THE PHOTOGRAPHY PRECLUDES DETERMINING THE ' NUMBER OR TYPE. DNEPROPETROVSK ORD DEPOT SOUTH DO' l STATUS:OCCUPIED GROUND.FORCE ORDER OF BATTLE. 16 VEHICLES OR' PIECES OF EQUIPMENT (AT LEAST) Approved For Release 20r1 6/$ECRE1 25X1 S?V ET UNION GROUND FORCE FACILITIES 45Z I! 48-26461"0350003-04E 3.*51u.i5E 74MA 34-5 --5.1E 25X1 25X1 25X1 D STATUS: UNKNOWN REMARKS: THIS INSTALLATION IS NOT AN ACTIVE LINE UNIT BARRACKS AREA. IT 25X1A IS THE SUPPORT AREA OF A LARGE GROUND FORCES TRAINING AREA AND IS REPORTED UNDER KOSTROMA TRAINING AREA 1 25X1 D 25X1 D 25X1 D NOVOSIBIRSK $TORAC E DEPOT INSKAYA 25X1A SOVIET UNION GROUND FORCE FACILITIES 57-400-34N O14O' 34-43E -57-20N 083-03-40E' 6.8 NM SE OF'NOVOSIBIRSK. THIS SECUREDr.RAIL"SERVED FACILITY CONTAINS ONE ADMINISTRATION BUILDING. 36 STORAGE BUI DINGS. AND THREE'SUPPORT BUILDINGS, ONE FOUNDATION FOR A PROBABLE STORAGE BUILDING IS ALSO OBSERVED. A SUPPORT OR BARRACKS AREA IS IMMEDIATELY NORTH OF THE STORAGE FACILITY. GROUND FORCE ORDER OF BATTLE: 15 VEHICLES (AT LEAST) STATUS OCCUPIED PHYSICAL DESCRIPTION: 25X1 25X1 Approved F Release 20H'4/04MR-RDP78T04 62A000300120001-9 25X1A OMA ARMY BARRACKS LEVASHEVO AL 1 Approved For Release 20p(Ip6i3ECIZMDP78TO4562A000300120001-9 25X1 Approved For Release 2099/AiMk IPIR 16 Y 4 SOVIET UNION . ? ..r rA w:.., ["~ ern-a d.i?I Y'7'7'C"L"" KHa-14 MISSION 1109 25X1A PHYSICAL DESCRIPTION: 5.9 NM NORTH OF NOVOSIBIRSK... THIS SECURDP, RAIL-SERVED FACILITY CONTAINS 13 LARGE STORAGE BUILDINGS. A. SUPPORT AREA IMMEDIATELY SOUTH OF, THE FACILITY CONTAINS ONE PROBABLE ADMINISTRATION BUILDING AND EIGHT SUPPORT BUILDINGS. 25X1 D NOVOSIBIR SK STORAGE DEPOT NORTH 550#070*25N 082-55-15E 1 -1 STATUS: OCCUPIED 25X1 D 25X1 D POZDEYEVKA ARMY BARRACKS AL 1 STATUS; OCCUPIED NAC GROUND FORCE ORDER OF BATTLES 200 VEHICLES OR PIECES OF EQUIPMENT (APPROXIMATELY) 25X1 D 25X1 D S E O PO ARMY TNG AREA 1 -1 25X1A 50-35 '.28-5 44-54-0/N 3L1 .0 /E PHYSICAL DESCRIPTIONS 8 NM SE OF SIMFEROPOL. THE BARRACKS AREA CONSISTS OF. ONE MULTISTORY BARRACKS, THREE CeSHAPED ADMINISTRATION BUILDINGS. 22 QUARTERS (FOUR MULTIFAMILY').. ONE MULTISTORY APARTMENT HOUSE, ONE MESSHALL. ONE 1#280-STUDENT SCHOOL BUILDING. ONE DRIVE-THROUGH VEHICLE MAINTENANCE BUILDING, TEN VEHICLE STORAGE BUILDINGS. SEVEN PROBABLE AMMUNITION STORAGE BUILDING SE 38 OTHER ASSOCIATED BUILDINGS. AND A BIVOUAC AREA. THE ADJACENT TRAINING AREA IS FOR INFANTRY FIELD TRAINING. THE PRIMARY TRAINING AREA IS SEPARATED FROM THE REST OF THE INSTALLATION BY 3,.d ,AR1VER VALLEY AND IS SERVED BY AN ALL-WEATHER ACCESS ROAD. 78, 25X1 25X1 Approved For Release 206i3EClZ[~DP78T04562A000300120001-9 STATUS: OCCUPIED 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D For Release 2bQ9/09c?TA SOVIET UNION GROUND FORCE PACIOTIES THIS AREA CONTAINS A TANK OR ASSAULT-GUN FIRING RANGE, AN 61 NUMEROUS S O G IN . AND At/Tc MAT IC--WEAP NS FIRING RAN E WHEELED- AND TRACKED-VEHICLE DRIVER- RAD4XNG,COURSES. GROUND FORCE ORDER OF BATTLE: NONE` DISCERNIBLE SUMAE BORDER SECURITY PO 25X1 A STATUS:OCCUPIED 42-55-45N 060 PHYSICAL DESCRIPTION: .5 NM SW OF THE USSR'CHINA,BORDER, THIS SECURE? FACILITY CONTAINS ONE BARRACKS. ONE SUPPORT BUILDING, THREE SUPPORT OR STORAGE BUILDINGS. AND ONE UTILITY SHED. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE ULANU E BKS + TNG AREA ONOKHOY SW STATUS OCCUPIED 51-49-//N 25X1A 07-57-//E REMARKS: HEAVY TRACKING IS EVIDENT THROUGHOUT THE AREA. AND ALL FIRING RANGES APPEAR TO BE ACTIVE. GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 79 Approved For Release A20TOP61SE QU1 25X1 25X1 25X1 25X1 D S O V I E TU N ION GROUND FORCE FACILITIES OTHER RESULTS'NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D 25X1 D NAC STATUS.GCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE C BAR K UL ARMY BARRACKS NE AL 1 NAC STATUS+OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 51-11 * 115-05-10E 54-545 k 160'23-0OE 25X1 25X1 ,ITARY DEPOT WEST DX 1 ` `4pproved For Release 20ffJF/$ECRE1'fR PP78T04562A000300120001-9 25X1 Approved F r Release 21606W.91- IPIR 16 SOVIET UNION I MISSION 1109 SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D E3ALAKLAVA MISSILE 'TEST CENTER STATUS: OCCUPIED NAC 44-31'214 03331-45E RFMARKS: AN UNIDENTIFIED PIECE OF EQUIPMENT IS ON ONE OF THE CRUISE MISSILE LAUNCH PADS. NOVOSIBIRSK TACTICAL SSM STORAGE DEPOT STATUS: OCCUPIED NAC 55-134*00E32-59-x++UE MISSILE ORDER OF BATTLE: 200 PROB MISSILE CRATES (AT 50 VEHICLES AND PIECES OF LEAST) EQUIPMENT (AT LEAST) OTHER RESULTS-NO APPARENT CHANGE BALAKLEYA TACTICAL SSM SUPPORT FAC O NAC STATUS: OPERATIONAL MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 81 49*-2 520P `036-52-15E 25X1 25X1 Approved For Release 401f)?6/SCDP78T04562A000300120001-9 25X1 25X1 D 25X1 D 25X1 D 25X1 D Approved ~ or Release 20H'4/061 3'P4&- IPIR 16 log RDP78T04 SOVIET UNION DEPLOYED TACTICAL SSM FACILITIES LOZOVAYA TACTICAL SSM SUPPORT FACILITY STATUS. OPERATIONAL MISSILE ORDER OF BATTLE: NONE DISCERNIBLE MYS NIZMENNYY CSTL FIEF SITE CM TSR STATUS;UNKNOWN 25X1A REMARKS: NO COASTAL DEFENSE,CRUISE-MISSILI VICINITY OF THE REFERENCED CooRD 82 Approved For Release 207 /SECRPE SITE CAN BE IDENTIFIED IN THE NATES.. 25X1 25X1 25X1 Approved SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D B-AGOVESHCHENSK PETROLEUM STORA KA PET PROD STOR C - AC AUDZMA' BAY 42-46-16N 12753.09E 25X1 SOVIET UNION LOGISTICS SOMtS-OON 25X1A STATUS: OPE SAT IONAL PHYSICAL DESCRIPTION: THE SECURED AREA CONTAINS THREE, LARGE'Vb''I' AI'POL TANKS. A SEPARATELY, SECURED#, RAIL-SERVED AREA CONTAINS 16 SMALL OR MEDIUM VERTICAL POL TANKS. NAKHO 25X1A PHYSICAL DESCRIPTION: 3.5 NM SOUTH: OF NAKHOOKA ON CHA[?AUDZMA BAY. THIS ROAD-SERVED INSTALLATION CONTAINS 48 LARGE , VERTICAL YLINDRaICA , TANKS' WITH FIREWALLLS. 30 SMALLER VERTICAL CYLINDRICAL TANKS WITH FTREWALLS- NUMEROU. REVETTED, OPEN STORAGE SITES. TWO STORAGE OR SUPPORT BUILDINGS. ONE STORAGE BUILDING. FOUR UTILITY SHEDS# AND A' PETROLEUM PIER. THE INSTALLATION IS TANKER SUPPLIED. For Release 21991049~R91 RDP78T 4562A000300120001-9 STATUS': OCCUPIED OTHER RESULTS-NO APPARENT CHANGE 25X1 D KOMSOMOLSK PET PRO STR 25X~a ,27-40N 136-+531W05E Approved For Release 20,46/SE(R 'T 83 25X1 25X1 25X1 D Approved ~ or Release 20i9r4/0ik9~~9T -RDP78T 562A000300120001-9 IPIR 16 09 STATUS: OPERATIONAL 59-58-0 REMARKS HEAVY CLOUD COVER PRECLUDES A READOUT OF THE INSTALLATION. LENINGRAD RR' STN YDS A SHOPS FINLANDIY 5 2 X1 D 25X1 D 25X1 D 25X1 D 25X1A SOVIET UNION LOGISTICS A HAZE AND SHADOW PRECLUDE A DETERMINATION OF THE LEVEL OF. ACTIVITY. STATUS: UNKNOWN RI" M RKS' ULAN NAC STATUS:OPERATIONAL 51-5 " Ald73E REMARKS: NA SSM SSM*~RELATED EQUIPMENT, OR LARGE CRATES ARE OBSERVED. 49m 1T- ZABAYKALSK RR TRAdSLOADING YARD 25X1 D NAC 25X1 D STATUS OPERATIONAL RI .MARKS NO ROLLING STOCK IS DISCERNIBLE IN THE YARD. Nth SSM, SSMNRELATEC EQUIPMENT, OR LARGE CRATES ARE DISCERNIBLE. [ODE RR STATION CAF YARDS A SHOPS 84 Approved For Release 20'"6/S{C( DP78T04562A000300120001-9 9335E 25X1 25X1 25X1 Approved For Release 260'4/05Z3RIA- DP78T SOVIET UNION. INDUSTRY SIGNIFICANT RESULTS 25X1 D CH A AMMO PLAN YESHOV 58 O2-?1IN' 2-31E 0 25X1 25X1A 25X1A STATUS:OPERATIONAL PTION: PHYSICAL DESCRI IN THE CENTER NTER OF RYBINSK. THIS INDUSTRIAL PLANT CONSISTS OF TWO FABRICATION BUILDINGS, ONE LARGE ASSEMBLY BUILDING, AND APPROXIMATELY 25 SMALL SHOPS AND WAREHOUSES. 25X1 D 25X1 D SOLNECHNOGORSK'AUTOMOTIVE TEST TRACKS NAC 5E 25X1A 25X1 D 25X1 D STATUSOCCUPIED GROUNb FORCE ORDER OF BATTLE: 30 VEHICLES OR PIECES OF EQUIPMENT (AT LEAST) YAROSLAVL PETRO EUM REFINERY . 25 A32?'5SN 039"47-47E Approved For Release 2O 7 1"/gECR DP78T04562A000300120001-9 2O-.3QN 037.17-00E 25X1 25X1 25X1 D SOVIET UNION INDUSTRY ST"ATUSOPERATIONAL PHYSICAL DESCRIPTION 6 NM SW OF YAROSLAVL* THE RAIL-SERVED REFINERY COVERS. APPROXIMATELY 850 ACRES AND CONSISTS. OF AT LEAST THREE PRIMARY DISTILLATION UNITS. A PROBABLE CATALYST CRACKING UNIT. A PROBABLE COMBINATION PRIMARY/SECONDARY PROCESSING UNIT. AND, AT LEAST EIGHT OTHEF PROCESSING AREAS. THE MAIM REFINERY STORAGE AREA CONTAINS APPROXIMATELY 115 CYLINDRICAL. AND NUMEROUS ; HORIZONTAL STORAGE TANKS. A-220-ACRE SEPARATE STORAGE AREA CONTAINS 39 VERTICAL CYLINDRICAL STORAGE TANKS AND 28 COVERED RFSERVOIRS. NO NEW CONSTRUCTION IS APPARENT. OTHER RESULTS"*NO APPARENT CHANGE 25X1 D 25X1 D ALTYNAY PROB ORE REDUCTION PLT NAC STATUS 44UNDER CONSTRUCTION 86 Approved For Release 20gq /2.3 tftf 510 82 Rff ' %61 F5 25X1 25X1 25X1 Approved For Release 2 F061 ?RETA IPIR 16 169 SIGNIFICANT RESULTS 25X1 D OOM13 AROVSKY ORE PROCESSING FACILITY ,SOVIET UNION MISCELLANEOUS 0O.-40 A59-54-40E 25X1A 25X1 D 25X1 D 25X1 D Y 25X1B STATUS:UNDER CONSTRUCTION PHYSICAL DESCRIPTION: THE FACILITY IS STILL UNDER CONSTRUCTION' AND IS IDENTIFIED AS AN ORE PROCESSING FACILITY. 'IT. I CONSISTS OF ORE PROCESSING FACILITIES IN THE, EARLY STAGES OF CONSTRUCTION. A WATER PUMPING AND STORAGE FACILITY. AN ELECTRICAL SUBSTATION, A SEWAGE. TREATMENT PLANT, AN ORE STORAGE AREA, SHIF'T'ING FAC.IIITIES. A VEHICLE STORAGE AND MAINTENANCE AREA. A SMALL HOUSING AREA. ANC? SEVERAL OTHER BUILDINGS OF UNIDENTIFIED FUNCTION. OTHER RESULTSmNO APPARENT CHAN 1fnA E1 SK COMPLEX NAC STATUSOPERATIONL Approved For Release 20Q ? V/gtCWI f DP78T04562A000300120001-9 E 57o"50215MP06 25X1 25X1 Approved For Release 20/EOETDP78T04562A000300120001-9 ?o1o4~352 0109395 Approved For Release 2001t3p/29EWIZDP78T04562A000300120001-9