KH-4 MISSION 1110 IPIR NUMBER 7 OAK SUPPLEMENT PART III 21 MAY - 8 JUNE 1970

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04562A000600010015-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
67
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 27, 1999
Sequence Number: 
15
Case Number: 
Publication Date: 
June 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04562A000600010015-6.pdf1.71 MB
Body: 
Approved For Release 2000/04/17: CIA-RDP78TO4562A0006000T 19ECRET NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER PHOTOGRAPHIC INTERPRETATION REPORT KH-4 MISSION 1110 IPIR NUMBER 7 OAK SUPPLEMENT PART III 21 MAY - 8 JUNE 1970 Handle via TOP SECRET Talent-Keyhole Channels Only TCS-20224/70 JUNE 1970 COPY NO 2i.. j 64 PAGES GROUP I. EXCLUDED FROM AUTOMATIC DOWNGRADING OAK-111/70 ApproW4 fRtlease 2000/04/17 : CIA-RDP78T04562A000600010015-6 Approved For Release 2000/04/17 : CIA-RDP78TO4562A000600010015-6 This document contains Information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States, It is to be seen only by personnel especially indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining toTALENT-KEYHOLE Contiol System. TARGET CATEGORIES AND ASSOCIATED NTP FUNCTIONAL AREAS (CODES) 1. STRATEGIC SSM Deployed Strategic SSM Facilities (A) 2. MISSILE RANGES Missile Ranges: Strategic SSM/Space Facilities (P) Missile Ranges: Air- Launched Missile Facilities (Q) Missile Ranges: Naval-Launched Missile Facilities (R) Missile Ranges: Tactical SSM Facilities (S) Missile Ranges: SAM/AMM Facilities (T) 3. AIR DEFENSE MISSILES Deployed AMM Facilities (B) Deployed SAM Facilities (0) 4. ELECTRONICS/COMMUNICATIONS Deployed Communication/Electronic/Radar Facilities (C) Air Base Facilities (E) 6. NAVAL Naval Base Facilities (F) 7. GROUND Ground Force Facilities (G) 8. TACTICAL SSM Deployed Tactical SSM Facilities (H) 9. LOGISTICS Military Logistics Facilities (K) 10. NUCLEAR ENERGY Atomic Energy Facilities (0) 11. CBR CBR Facilities (V) 12. INDUSTRY Strategic Weapons Industrial Facilities (J) General Purpose Weapons Industrial Facilities (L) Non -Military Industrial Facilities (N) Communication/Electronic/Radar R&D Facilities (U) 13. MISCELLANEOUS Non-Military Logistics Facilities (M) Miscellaneous/Unidentified Facilities (Z) These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional association (i.e., missile range tracking facilities are reported under "MISSILE RANGES" fly-away airfields at aircraft plants are reported under "INDUSTRY," airfield nuclear weapons storage facilities are reported under "AIR" etc.). Approved For Release 2000/04/17 : CIA-RDP78TO4562A000600010015-6 40k.~Ay 1 For Release 2000/IQPI-~E (TRR %T04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7 KH-4 MISSION 1110 TABLE OF CONTENTS PREFACE AFGHANISTAN AIR BASE FACILITIES ALGERIA AIR BASE FACILITIES CHINAo COMMUNIST COMMO/ELEC/RADAR FACILITIES UNITED ARAB REPUBLIC AIR BASE FACILITIES NAVAL BASE FACILITIES INDUSTRY %JORDAN AIR BASE FACILITIES KOREA, NORTH COMMO/ELEC/RADAR FACILITIES AIR BASE FACILITIES NAVAL BASE FACILITIES GROUND FORCE FACILITIES LOGISTICS INDUSTRY MISCELLANEOUS PAKISTAN AIR BASE FACILITIES GROUND FORCE FACILITIES ROMANIA DEPLOYED TACTICAL SSM FACILITIES SAUDI ARABIA AIR BASE FACILITIES SUDAN AIR BASE FACILITIES GROUND FORCE FACILITIES PAGE 10 11 12 14 19 22 24 26 27 28 29 a, Handle Via Approved For Release 2000/"075: ff L J T04562A00060001 GOeSKSYHOLE Control system Only Handle wed For Release 2000/19/1~ERXTRDW7'8T04562A000600010015-6 Control System Only TCS-20224/70 *^ IPIR 7 KH-4 MISSION 110 SYRIA PAGE AIR BASE FACILITIES 32 NAVAL BASE FACILITIES 35 SOVIET UNION COMMA/ELEC/RADAR FACILITIES 37 AIR BASE FACILITIES 41 NAVAL. BASE FACILITIES 44 GROUND FORCE FACILITIES 5 DEPLOYED TACTICAL SSM FACILITIES 54 CUR FACILITIES 59 INDUSTRY 60 VIET-?NAM o NORTH. INDUSTRY 61 YEMEN AIR BASE FACILITIES 62 I I Handle Via Approved For Release 2000I0431 SRftlWftT04562A000600010D4P - HOLE Control System Only Handle Via Ai or4 J For Release 2000/07 M1IR 704562A000600010015-6 o trot System Only TCS-20224/70 - IPIR 7 PREFACE KH-4 MISSION 1110 PREFACE THIS IS THE THIRD OF SEVERAL OAK SUPPLEMENT REPORTS ON MISSION 1110. FOR COMPLETE PREFACE SEE FIRST OAK SUPPLEMENT REPORTS Handle Via Approved For Release 2000I1 It RRU~PT04562A00060001 t 1t5c 6HoLE Control system only Handle Via Apply- rl For Release 2000/O T$FREF D%WT04562A000600010015-6 Control System Only TCS-20224/70 ? IPIR 7 AFGHANISTAN KI14 MISSION 1110 AIR BASE FACILITIES SIGNIFICANT RESULTS 25X1D BAGRAM AIRFIELD NAC STATUS:OPERATIONAL AIR ORDER OF BATTLE; L& POSS BEAGLE 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 PS4-57 MN 069-164 100 PROB AIRCRAFT (APPROX) OTHER RESUL.T.S-NO APPARENT CHANGE 25X1 D 25X1 D KABUL AIRFIELD INTERNATIONAL 25X1A3j34 N 06912 E NAG STATUS: OPERATIONAL AIR ORDER OF BATTLE: NONE DISCERNIBLE evia Approved For Release 2000inAll awg T04562A00060001N E~HO~E MP'it Control System Only app Via jt@l For Release 2000/iQJi ]R %T04562A000600010015-6 Control System Only TCS-20224/70 -* IPIR 7 ALGERIA KH-4 MISSION 1110 AIR BASE FACILITIES SIGNIFICANT RESULTS BLIDA AIRFIELD 25X1 D NAC 25X1 D 25X1 D 25X1 D STATUS: OPERATIONAL. AIR ORDER OF BATTLE:. 2 LIGHT STRAIGHTr-WING (AT LEAST) 25X1 D 25X1 D jij3ooo2j8 25X1 D 25X1 D BOUFARIK AIRFIELD NAG 25X1P36-33 002-52-W STATUS;OPERATIONAL AIR ORDER OF BATTLE4 7 CUB 10 PRQB HELICOPTERS (AT LEAST) 3 Handle Via Approved For Release 2000/f~ 7 - fT04562A000600010Dei5*HOLE Control System Only Rd For Release 2000T6*1 EC&f l Ff8T04562A000600010015-6 ",aj# Control System Only TGS-20 24/70.-IPIR 7 KH-4 MISSION 1110 OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D CHING-YANG POSSIBLE SIGINT FACILITY NAC STATUS:OPER.ATIONAL HSI AN AM,XMTR YUNG SHOD NAC STATUS:OPERATIONAL HSI AN RAD STA HSIEN YANG NAC STATUS:OPERATIONAL 25X1 D 25X1 D PEI CHING AM XMTR NO 9 AN PING 25X1A 39-44- 6-48~ E NAC CHINAP COMMUNIST COMMO/ELEC/RADAR FACILITIES 25X1 D 25X1 D iihhi06i 25X1 D 25X1 D 25X1 A34j22,. k 108-36-ME STATUS:OPERATIONAL YUNG-LO-TIEN RADIO BROADCAST STATION NAC 25X1 D 25X1 D 25X1 A39-41-MN 116-46 STATUS: OPERATIONAL 4 Handle Via Approved For Release 2000/~U/l7S-FIA--R%f PT04562A0006000100e1i5l (HOLE Control System Only Handle Via Approved For Release 2000/d Q 75FREkWl04562A000600010015-6 Con rol System Only TCS?-20224/70 - IPIR 7 KH'4 MISSION 1110 SIGNIFICANT RESULTS 25X1 D DUKHAYLAH A RFIELD STATUS OPERATIONAL AIR ORDER OF BATTLES I PROB HELICOPTER 25X1 D 25X1A UNITED ARAB REPUBLIC AIR BASE FACILITIES 25X1 D 25X1 D 31-07-M 029-48 E 3 POSS HELICOPTERS 25X1A Approved For Release 2000AQ,~1~E awff T04562A00060001Q~Q E' YiaOL ~I v~~r' Control System Only Handle Via Amr-- l For Release 2000/0TQ~7I ~t T04562A000600010015-6 Con Control System Only TCS--20224/70 -.IPIR 7 UNITED ARAB REPUBLIC KH-4 MISSION 1110 NAVAL BASE FACILITIES SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D E AL I RIYAH NVB + HQ NATIONAL. iiwbw NAC C STATUS : OCCUPIED NAVA OR ER OF BATTLE: AT NAVAL BASE 1 PROB SS 5 COMBATANTS 1 Dp *- AT INNER HARBOR 6 SS AT AL QABBARI SHIPYARD 1 SS I AR "" AT OUTER HARBOR I SS (IN FLOATING DRYDOCK) 2 DD 25X1 D 25X1 D 25X1 D NAG 25X1 D 25X1 D 25X1 D AL ISKANDARIYAH PORT FACILITIES jjixNo29jj2 STATUS:.OCGUPIED NAVAL ORDER OF BATTLE: AT INNER HARBOR 1 AG 19 FREIGHTERS ^~- AT OUTER HARBOR 36 FREIGHTERS 3 TANKERS FLOATING DRYDOCKS 3 FLOATING DRYDOCKS n e Yia Approved For Release 2000/~~} 7SE~QPT04562A00060001 Q'~ HOLE ~J KUr Control System Only bMad For Release 2000T61 $EaF4Z 8T04562A000600010015-6 4 Control System Only TCS-20224/70.- IPIR 7 UNITED ARAB REPUBLIC KH-4 MISSION 1110 NAVAL BASE FACILITIES OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D AL I$KANDARIYAH MSL.SPT FAC SHIPBORNE. 525X1 D NAC STATUSoOCCUPIED MISSILE ORDER OF. BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D 25X1 D AL ISKANDARIYAH MSL STAR FAC SHIPBORNE 25XlP31.09,. 029.-51?ME NAG STATUS:OCCUPIED MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 7 Handle Via Approved For Release 2000/iWS,E'CRE J 7EJ~$T04562A00060001OOII6a6YHOLE rr Control System Only andle Via IRyiplf For Release 2000/d1F7SC' RR $T04562A000600010015-6 Control System Only TCSw20224/70 - IPIR 7 UNITED ARAB REPUBLIC KHu,4 MISSION 1110 INDUSTRY SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D AL ISKANDARI,YAH PET RFY STR MEX SERCOP 31-081 029-50 STATUS:OPERATIONAL 25X1A 25X1A PHYSICAL DESCRIPTION: IN THE SW SECTION OF AL ISKANDARIYAH, THIS INSTALLATION CONSISTS OF A REFINERY AREA AND A POL4STORAGE AREA, THE POL STORAGE AREA CONTAINS 45 POL STORAGE TANKS. 25X1 D 25X1 D AL. ISKANDARIYAH SHIPYARD AL QABBARI 25X1A 31-10-mod 029-52~ NAC STATUS:OCCUPIED NAVAL ORDER OF BATTLE; 1 SS I AR 4 VESSELS IN GRAVING DOCKS 8 Handle Via Approved For Release 2000,1 ~E&trR &TO4562A00060001flOfi5EOIDLE Control System Only p i ed For Release 2000Td 12 EUCUNWhT04562A000600010015-6 a 0 Control System Only TCS-2O224/7Q - IPIR 7 KH4 MISSION 1110 SIGNIFICANT RESULTS 25X1 D 25X1 D H-4 AIRFIELD NEW NAG STATUS: OPERATIONAL AIR ORDER OF BATTLE:. 5 PROD SMALL SWEPTWING 25X1A 25X1 A32 JORDAN AIR BASE FACILITIES 25X1 D 25X1 D 32-M 038-11-ME 25X1 D 25X1 D 32-Q9MN 037-08- 25X1D PRINCE HASAN AIRFIELD STATUS:OFERATIONAL 25X1 D 25X1A REMARKS: TWENTY SINGLE-DAY HANGARETTES AT THE SE END OF THE RUNWAY WERE COMPLETE AND SEVEN WERE UNDER CONSTRUCTION.* TWELVE HANGARETTES WERE COMPLETE AT THE NW ENDOF THE RUNWAY FOR A TOTAL OF 39 HANGARETTES AT THE FIELD. AIR ORDER OF BATTLE: 2 POSE AIRCRAFT 9 Handle Via Approved For Release 2000/IA/f'7Sf~ tl fl T04562A000600010045L6'HOLE Control System Only WMjtg Via For Release 2000/IQh -bE IkBO~ET04562A000600010015-6 Control System Only KH"4 MISSION 1110 TCS-20224/70 v, IPIR 7 KOREA# NORTH SIGNIFICANT RESULTS 25X1 D H Ei CAN SRCH 25X1 D 25X1A COMMA/EEC/RADAR FACILITIES 25X1 D 25X1 D 41-24-ON 128-O- STATUS:UNKNOWN 25X1A REMARKS: NO TP SWITCHING CENTER COULD BE IDENTIFIED AT THE REFERENCED COORDINATES, 10 Handle Via Approved For Release 2000/c ,7SgJ ftTEJftT04562A0006000101DI64SYHOLE TO Control System Only Dandle Via ptr1Rwd For Release 2000/(T AE6T l fET04562A000600010015-6 Control System Only T S-2t 224/70 - IPIR 7 KOREAr NORTH KH-4 MISSION 1110 AIR BASE FACILITIES 25X1D HYESAN AIRFIELD OTHER RESULTS-NO APPARENT CHANGE NAC STATUS; UNDER CONSTRUCTION AIR ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D 25X1A 41-22~^ N 125-12 11 Handle Via Approved For Release 2000 jl ~tatM7F8T04562A00060001fl0INf6HOLE Control System Only '} d For Release 20001 ~Ea~Tl 8T04562A000600010015-6 Control System Only TCS--20224/70 - IPIR 7 KOREA. NORTH KH-4 MISSION 1110 NAVAL. BASE FACILITIES SIGNIFICANT RESULTS 25X1D CHONGJIN NAVAL BASE NAC 25X1 D STATUS:OPERATIONAI NAVAL ORDER OF BATTLE: 2 SMALL VESSELS CHONGJIN PORT FACILITIES EAST 25X1 D NAC STATUS:OPERATIONAL NAVAL ORDER OF BATTLE: 1 CARGO VESSEL 25X1 D 25X1 D 25X1 D CHONGJIN PORT FACILITIES WEST NAC STATUS:OPERATIONAL NAVAL ORDER OF BATTLE. 2 CARGO VESSELS 25X1 A41..-46 25X1 D 25X1 D ^N 129-49-M 25X1 D 25X1 D i 25X1 D 25X1 D 1 25X1 D 25X1 D 25X1A42-134M 130-17-ME NAJIN PORT FACILITIES 25X1 D NAC STATUSOPERATIONAL 12 Handle Via Approved For Release 20001] of 75E Rgf PT04562A000600010045LeHOLE Control System Only Handle Via Ale For Release 2000/Uk75E6~2[ IT04562A000600010015-6 Control System Only TCS-20224/70 -.IFIR 7 KOREA$ NORTH KH-4 MISSION 1110 NAVAL BASE FACILITIES NAVAL ORDER OF BATTLES I CARGO VESSEL 2 LUMBER RAFTS 25X1 D 13 Approved For Release 2000 1& Pffi78T04562A000600011006194" OLE TUP ~Lrr Control System Only Via ppMgL@l For Release 2000/IQA{E6U]tBO~ET04562A000600010015-6 Control System Only TCS-20224/70 w IPIR 7 KOREA.? NORTH KHu4 MISSION 1110 GROUND FORCE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D OTHER RESULTS-NO APPARENT CHANGE CHONGJIN ARMY BKS AND HQ 24 INF. ODE. NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D A41-44 N 129-44 jjjjjJw129jJE 25X1 D 25X1 D CHONGJU ARMY BARRACKS AREA SOUTHWEST 25X1A 39-39 1 125-09 NAG STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE HASO-RI ARMY BARRACKS NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D jj39ji125j7., 25X1 D 25X1 D HOERYONG~?UP ARMY BARRACKS 25X1A42,.25,,, W 129-45-M NAC STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 14 Handle Via on YHOLE Approved For Release 2000/"P75a f~tWT#T04562A00060091 q jn5K6YHOLE on ol System Only andle Via pprMgLV For Release 2000/IQ) -bE It& T04562A000600010015-6 Control System Only TCS-2022*/7Q - IPIR 7 KOREA, NORTH KH-4 MISSION 1110 GROUND FORCE FACILITIES 25X1 D KAEWON-DONE ARMY. BARRACKS NAC 25X1 D 25X1 D 25X1A3g-44.UN 125-08-ME 25X1 D STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D KAN-NI ARMY BARRACKS NAC 25X1 D STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D K MU"ASTOR AGE AREA iiNAC 25X1 P42_07.d 129-374ME STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D KUNDONG-NI ARMY BARRACKS NAC STATUS; OCCUPIED 25X1 D GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 A 3g-q,31& 125-03W. 15 Handle Via Approved For Release 2000/?&7S: r f RfffT04562A000600q1 ~ OTS %YHOLE on rol ystem Only Handle Via Apprncemod For Release 2000/ a 7Sq- t8PfET04562A000600010015-6 Control System Only TCS-20924/70 ' IPIR 7 KOREA, NORTH Kf1 4 MISSION 1110 GROUND FORCE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D NAJIN STORAGE AREA WEST NAC STATUS:OCCUPIED 25X1 A42. 25X1 D 25X1 D MN 1.30-1643E GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SANGSO"RI ARMY BARRACKS + STOR AREA NAC 25X1A39 25X1 D 25X1 D 37 125.18ME STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D SINANJU ARMY BARRACKS AND STORAGE AREA 25X11"59-35. N 125.38+ 25X1 D NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE. NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D SIN,)ONG-NI ARMY BKS + STOR AREA NAC STATUS:OCCUPIEP GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X139-451 1 125-17ME 16 Handle Via Approved For Release 2000/0 1jp7SL'Z ftq T04562A000600C~l,Q~,I S mHOnly f . yy ftg For Release 2000/ J) E6 TRW%T04562A000600010015-6 Control System Only .TCS-20224/70 - IPIR 7 KOREAr NORTH KH14 MISSION .1110 GROUND FORCE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D SINO-RI ARMY.BARRACKS + STORAGE. AREA NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SOKKOL-SANGDAN ARMY BARRACKS AREA NAG STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE.: NONE DISCERNIBLE SOSO!RI ARMY BARRACKS AREA NAC STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE TAECHQN MIL CAMP + PROB HELO TRNG AREA NAC 25X1 D 25X1 D 25X1A 39-42O N 125-06 25X1 D 25X1 D 25X1A 39,.39 N 125-18 25X1 D 25X1 D jij57i25jjt STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 17 Handle Via Approved For Release 2000/"07S~ ftRb T04562A00060001 Qd4~'596YHOLE Control System Only 25X1 D 25X1 D A 39-38.. ji39jex25j'. 6WA. M I Handle Via Applraved For Release 2000/d,9?7.F6Uh iT04562A000600010015-6 Control System Only TCS-20224/70 w IPIR 7 KOREA. NORTH KM"4 MISSION 1110 GROUND FORCE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D U GG OR GE DEPOT SE jj2jj8NjojjQ*E io NAC STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 18 Handle Via Approved For Release 2000/%07fCftfWWT04562A000600010O1I546YHOLE Control System Only Hale KA'Xft0 For Release 2000/TQP1 ~~9AIR 8T04562A000600010015-6 25X1 D 25X1 D 25X1 D 25X1 D Control System Only TCS-20224/70 - IPIR 7 KHr4 MISSION 1110 SIGNIFICANT RESULTS CHANGJAE"GOL PORT FACS NAC STATUS~OPERATIONAL NAVAL ORDER OF BATTLE;, SEVERAL SMALL VESSELS CHQNGJIN RR YARDS AND SHOPS SOUTH NAG STATUS' OPERATIONAL KOREAP NORTH LOGISTICS 25X1 D 25X1 D 5 REMARKS' THE YARDS WERE MODERATELY ACTIVE AND APPROXIMATELY 20 PERCENT FILLEDo '25X1 n CHONGJU RR YARDS AND SHOPS 25X1 D 25X1 D 25X1 D 25X1 A39-41 i 125-19 STATUS;OPERATIONAL REMARKS; LITTLE OR NO INDUSTRIAL ACTIVITY WAS OBSERVED. 25X1D HOERYONG-UP RR STN YDS + SHOPS NAC STATUS' OPERATIONAL 25X1 D 25X1 D 25X1p42-26MN 1 9-444ME 19 Handle Via Approved For Release 2000/0i'~7S IA-F2 ff04562A000600010O1r gYHOLE Control System Only H;n die Via ,prA l For Release 20001 $$M.IR 8T04562A000600010015-6 Control System Only TCS'20224/70 - IPIR 7 KOREAp NORTH KH* R+ MISSION 1110 LOGISTICS 25X1 D 25X1 D 25X1 D REMARKS: THE YARD WAS APPROXIMATELY. 30 PERCENT FILLED, NAJIN RR YARDS AND SHOPS NAC STATUS OPERATIONAL 25X1 D 25X1 D i A 42w 4 130-17 iika"a REMARKS: THE YARD WAS APPROXIMATELY 30 PERCENT FILLED AND MODERATELY ACTIVE. 25X1 D 25X1 D 25X1 D SINANJU RAILROAD YARDS 25X1P59 .35.MN 125-364M NAC STATUS:OPERATIONAL REMARKS: THE YARD WAS APPROXIMATELY 20 PERCENT OC 25X1 D UPIED, OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D CHONGUIN POL STORAGE iiwww 9-47*~ NAC ST ATUS;OCCUPIED. 20 Handle Via Approved For Release 2000/7 ~ ft ftT04562A000600010DI6 YHOLE Control System Only Handle Via c~F B1I Anmlaf For Release 2000/r 0 k7~:`CI1~~CTP8T04562A000600010015-6 Con rol System Only TCS-20224/70 . IPIR 7 KOREA# NORTH KH-4 MISSION 1110 LOGISTICS 25X1 D 25X1D TAECHON POL STORAGE NAG STATUS?OCCUPIED 25X1 D 25X1 D 25X1 D iiii'57ii'a27 F- 21 Handle Via Approved For Release 2000/"p7S I gMT04562A000600q1 o~Of - yHOLE on rol yst AN Only andlpegp Via For Release 2000/647SE . BI f T04562A000600010015-6 Control System Only TCS*-20224/70 - IPIR 7 KOREA, NORTH KH'-4 MISSION 1110 INDUSTRY SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D CHONGJIN IRON AND. STEEL PLANT KIMCHAEK 25X1A4 -45N 9-45 NAG STATUS:OPERATIONAL REMARKS.. A PORTION OF THE BLAST FURNACE SECTION WAS IN OPERATION. CHONGJIN SHIPYARD STATUS:OPERATIONAL 25X1 D 25X1 D jjo12jj7- NAV ORDER OF BATTLE: 1 VESSEL. UNDER CONSTRUCTION 1 DREDGE OPERATING IN 2 PROB FISH FACTORY SHIPS HARBOR (1 FITTING OUT) CHONGJIN TRANS STN WEST 25X1A 41 STATUS;UNKNOWN 25X1 D 25X1 D 49W'129-44 E 25X1A REMARKS: NO TRANSMISSION STATION WAS DISCERNIBLE AT THE REFERENCED COORDINATES. 22 Handle Via Approved For Release 2000/4~7S ftyWftT04562A000600010n16J6YHOLE Control System Only ndle For Release 2000/NJ1 ~EEU'RT04562A000600010015-6 Control System Only 25X1 D 25X1 D 25X1 D TCS-20224/70 Y- IPIR 7 KH-++ MISSION 1110 NAJIN NAVAL ACADEMY NAC STATUS;QPE:RATIONAL KOREA t NORTH INDUSTRY 25X1 D 25X1 D 25X1 A ,21.09. , 130 -12ME NAVAL ORDER OF BATTLE.: SEVERAL SMALL PROS COMBATANTS NAJIN SHIPYARD 28 25X1A 25X1 D 25X1 D 42-14MN 130-18 25X1A 25X1 D 25X1 D STATUS; OPERAT I ONAL REMARKS. CONSTRUCTION CONTINUES ON THE TWO--SAY ADDITION TO THE CONSTRUCTION HALL. NAVAL ORDER OF BATTLE: 3 PROD SARIWON PF ON WAYS SEVERAL SMALL VESSELS ON WAYS 23 Handle Via Approved For Release 2000/ ~7S IPEl WftT04562A000600010DIt6JBYHOLE Control System Only H dl V' e gtd For Release 2000TRl1 E lF ?8TO4562A000600010015-6 Control System Only TCS-2Q224/7O - IPIR 7 KOREA. NORTH. KH-?4 MISSION 1110 MISCELLANEOUS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D SIGNIFICANT RESULTS 25X1 D 25X1 D CHONGJIN COMPLEX 25X1A 41-46? 129-46 NAC STATUS:OPERATIONAL REMARKS: ALL. MAJOR INDUSTRIAL FACILITIES ARE ACTT.VE, i NC COMPLEX MAC STATUS;OPERATIONAL REMARKS: INDUSTRIAL. ACTIVITY APPEARED LIGHTv HOERYONG-UP COMPLEX NAC STATUS:OPERATIONAL NAJIN COMPLEX REMARKS THE COMPLEX WAS ACTIVE. BUT NO SMOKE WAS OBSERVED AT ANY OF THE INDUSTRIAL PLANTS9 25X1 D 25X1 D 25X1 D 25X1 D 25X1A 39-41 W x.25-12E 25X1 D 25X1 D 25X1 A 42-*26-UN 129-4+5-ME 25X1 D 25X1 D i A 42-14 130-17 E 24 Handle Via Approved For Release 2000/~'dp7$E~ fCtb-qTO4562A000600Q100 ' 7 Only ~i a frl ill For Release 2000/64'R7Sr.Ef WRIBI f$T04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7 KOREAP NORTH KH-4 MISSION 1110 MISCELLANEOUS 5TATUS:OPERATIONAL REMARKS: THE COMPLEX WAS MODERATELY ACTIVE. THERE WERE NO INDICATIONS OF A TROOP BUILOUP.q 25X1 D OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D 25X1 D SODU-RI COMPLEX 25X1PAx-26-UN 128--5OMM NAC STATUS;OPERATIONAL 25X1 D 5 Handle Via Approved For Release 2000/Off ~R1o J 04562A0006000100*5t4YHOLE Control System Only Via pp.gt@l For Release 2000ibQJ &AIR %T04562A000600010015-6 Control System Only TCS-20224170 .- IPIR 7 PAKISTAN KH-4 MISSION 1110 AIR BASE FACILITIES SIGNIFICANT RESULTS 25X1 D PESHAWAR AIRFIELD 25X1 D 25X1 D A33- 9 E i 25X1 D NAC STATUS OPERATIONAL AIR ORDER OF BATTLE: 20 PROS AIRCRAFT (APPROX) OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D MIANWALI AIRFIELD 25X1A32--,33 071,-34ME NAC $I'ATUS:OPERATIONAL AIR ORDER OF BATTLE NONE DISCERNIBLE 25X1 D 26 Handle Via Approved For Release 2000/"~75.E~ff Rb T04562A00060091OOTSKSYHOLE ontrol system Only 4r i g For Release 2000/(TA)R7S6fREIkfT04562A000600010015-6 Control System Only TCS' 20224/70 - IPIR 7 PAKISTAN KH-4 MISSION 1110 GROUND FORCE FACILITIES OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D NAUSH HRA ARMY BKS SCHOOLS A AMMO DPO jjOOo7jOl- 25X 1'D NAC STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D PESHAWAR MILITARY CANTONMENT A HOS NAC 25X1 D 25X1 D j3jooo32 ~ 25X1 D STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLER NONE DISCERNIBLE 27 Handle Via Approved For Release 2000/~~7~ ft ft f T04562A00060001 UC 1 &.6YHO1E Control System Only Ta 04?,qK?d For Release 200J/@R/'F ~BfA-M 78T04562A000600010015-6 Control System Only TCS-20224/70 ? IPIR 7 ROMANIA KH-4 MISSION 1110 DEPLOYED TACTICAL SSM FACILITIES 25X1 D 25X1 D OTHER RESULTS-NQ APPARENT CHANGE TECUCI TAC SSM BKS 001 NAC 25X1 D 25X1 D iiii'?ii2it STATUS;OPERATIONAL MISSILE ORDER OF BATTLE'S NONE DISCERNIBLE 28 Handle Via Approved For Release 2000/0f F tR~ Cff04562A0006000amo stO em Only nto ys em l y~navip p Ry cJ For Release 2000/'bQP1 ~E IR 88T04562A000600010015-6 Control System Only TCS-C u224/70 *' IPIR 7 SAUDI ARABIA KH-^L MISSION 1110 AIR BASE FACILITIES SIGNIFICANT RESULT 25X1 D !IZAN AIRFIELD 25X1 D 25X1 D 25X1 A 16.54-EN 042-34-ME 25X1 D STATUS + 4Pk.RAT I ONAL AIR ORDER OF BATTLES 1 MEDIUM STRAIGHT-WING 29 Handle Via Approved For Release 2000/4~7~ ft E7JT04562A0006000101015JBYHOLE Control System Only Mandl V, For Release 2000/IOi117S~Ek-ROOD ET04562A000600010015-6 Control System Only TCS-2Q 24/7O ,. IPIR 7 SUDAN KH-4 MISSION 1110 AIR BASE FACILITIES SIGNIFICANT RESULTS 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D FIELD 25X1A15-35 032-33~ NAC STATUS;OPERATIONAL AIR ORDER OF BATTLE: 2 CAT/CUB 9 LIGHT STRAIGHT-WING 1 PROB COMET 2 SMALL STRAIGHT-WING 25X1 D 25X1 D WADI oEIDNA AIRFIELD 25X1A 15-494M o32-3C STATUS;OPERATIONAL 25X1A REMARKS: THE NNW/SSE AND THE NNE/SSW RUNWAYS HAVE BEEN RESURFACED. A TOTAL OF 12 LARGE AIRCRAFT REVETMENTS WERE BEING CONSTRUCTED. AIR ORDER OF BATTLE: 2 CAT/CUB 1 POSS SWEPT/DELTA-WING 1 LIGHT STRAIGHT-WING 4 PUSS HELICOPTERS 30 Handle Via Approved For Release 2000/0 P7SRftlf ftT04562A000600010Ol16*YHOLE Control System Only Handle Via A pl ved For Release 2000/d F7SE69R[ IT04562A000600010015-6 Control System Only TCS'20224/70 IPIR 7 SUDAN KH-4 MISSION 1110 GROUND FORCE FACILITIES OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D AL KHURTUM ARMY BARRACKS 25X1A 15-36-ON 032-32- STATUS;UNKNOWN 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIULE 25X1 D 25X1 D AL KHURTUM BKS A HO GORDON$ TREE 15-32- W 032-29 STATUS;UNKNOWN 25X1A 25X1A GROUND FORCE ORDER OF BATTLE. NONE DISCERNIBLE UMM DURMAN ARMY L3KS 25X1 D NAC 25X1 D STATUS;OPERATIONAL GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D ji537o32jo-E iiiwb r 31 Handle Via Approved For Release 2000/4A-'7SO %jfT04562A000600010101&6YHOLE LT- Control System Only For Release 20001 1i 7SECRE- tflgfBT04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7 KH-4 MISSION 1110 SIGNIFICANT RESULTS 25X1 D 25X1 D AL (USAYR AIRFIELD NAC STATUS;OPERATIONAL AIR ORDER OF BATTLE; J. SMALL. SWEPT-WING 25X1 D 25X1 D 25X1 D ALEPPO AIRFIELD 25X1 D NAC 25X1 D STATUS OPERATIONAL AIR ORDER. OF BATTLE: 14 SMALL AIRCRAFT (AT LEAST) HAMAH AIRFIELD 25X1 D NAC 25X1 D 25X1 D STATUS;OPERATIQNAL AIR. ORDER OF BATTLES 3 SMALL SWEPTWING SYRIA AIR BASE FACILITIES 25X1 D 25X1A36-10 037-134W 25X1 D 25X1 D 25X1 A3S.,07,M 036-42 3 PASS AIRCRAFT 32 Handle Via Approved For Release 2000/01,7 to ftl ftT04562A000600010DII6JBrHOLE Control System Only ~p1~v For Release 2000/T)QPI -SEMTRW%T04562A000600010015-6 Ta AP t.KEYO Control System Only TCS-20224/70 - IPIR 7 SYRIA KH-4 MISSION 1110 AIR BASE FACILITIES 25X1 D 25X1 D p m RA AIRFIELD 25X1 D 25X1 D 25X1 D 25X1 D STATUS:OPERATIONAL 25X1A 25X1 D 25X1 D 34-33-EN 038-18 25X1A RLMARKSS A POSSIBLE EXTENSION OR OVERRUN WAS UNDER CONSTRUCTION AT THE SW kND OF THE WNW/ESE RUNWAY. AIR ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D SAYGtAL AIRFIELD 25X1A 33-40-M 037-12 STATUS OPERATIONAL 25X1A REMARKS: THE RUNWAY WAS BEING OILED. THE TAXIWAY SYSTEM IS PROBABLY COMPLETE. AIR ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D TIYAS AIRFIELD 25X1A 34-31-M 037-37aUE STATUS;OPERATIONAL 25X1A REMARKS. A PROBABLE 2x690 X 6O-METER (8.825 X 197-FOOT) N/S ALTERNATE. GRADED-EARTH RUNWAY WAS UNDER CONSTRUCTION AT THE WEST END OF 33 Handle Via Approved For Release 2000/9V07S ftft t[C*T04562A00060001 Qo4n516YHOLE Control System Only Via Appnoulad For Release 2000/NR17s W-T l 9T04562A000600010015-6 Control System Only 25X1 D TCS-20224/70 - IPIR 7 SYRIA KHp4 MISSION 1110 AIR BASE FACILITIES THE FIELD. AIR ORDER OF BATTLE: 7 POSS AIRCRAFT OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D JIRAH AIRFIELD 25X1 D 25X1A36,05 . 037-560. 25X1 D NAC STATUS: OPERATIONAL AIR ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D i ,, , RASIN EL ABOUD AIRFIELD 25X1 D NAC STATUS;OPERATIONAL AIR ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D T-i+ AIRFIELD 25X1%4..32-EN 037-42364EN 035-464M 25X1 D NAC 25X1 D 25X1 D STATUS; OPERATIONAL NAVAL ORDER OF BATTLE: 5 SMALL COMBATANTS 25X1 D 25X1 D AL LADHIQIYAH PORT FACILITIES 25X1A3530, 1 03 5-454ME 25X1 D NAC 25X1 D STATU$;OPERATIONAL NAVAL' ~RDER OF BATTLE: 25X1 D 5 SHIPS (AT LEAST) 1 POSS`SOMAR PTG 4 POSS P-4 PT J. POSS TANKER 11 FREIGHTERS 25X1 D 35 Handle Via Approved For Release 2000/ $107s . E T#T04562A000600010-G16YHOILE Control System Only H ndle Via Ip rp)t ld For Release 2000 P1 fM RrR $T04562A000600010015-6 Control System Only 25X1 D TC5-20224/70 - IPIR 7 SYRIA KH-4 MISSION 1110 NAVAL BASE FACILITIES TARTUS PORT FACILITIES NAG 25X1 D 25X1 D 25X1A 34-54-EN 035-52-ME 25X1 D STATUS;OPERATIONAL NAVAL ORDER OF BATTLE: I PROB T-43 MSF I PASS SMALL COMBATANT 2 POSS KOMAR PTG 3 FREIGHTERS 36 Handle Via Approved For Release 2000/ AM 7S6 %ff T04562A00060001 QOln5156YHOLE UP ffET Control System Only A r ,Hed For Release 2000/6$1'R7S:ECIEETZ R ?$T04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7 KH--4 MISSION 1110 SOVIET UNION COMMO/ELEC/RADAR FACILITIES SIGNIFICANT RESULTS ' 25X1 D 25X1 D SARAPULSKOYE HF COMMUNICATIONS FAC 48--50-M 135-55< STATUS:UNDER CONSTRUCTION 25X1A 25X1 D 25X1 D 25X1 D 25X1A REMARKS: CONTROL AREA CONTAINS ONE CONTROL BUILDING AND FOUR SUPPORT BUILDINGS9 THE SCALE OF THE PHOTOGRAPHY PRECLUDED IDENTIFICATION OF ANTENNA MASTSo 25X1 D 25X1 D 25X1 D SINDA HF COMMUNICATIONS FACILITY 25X1A 48-55-M 136.20-M STATUS;UNDER CONSTRUCTION 25X1A REMARKS: CONSTRUCTION CONTINUED AT THE FACILITYo THE SCALE OF THE PHOTOGRAPHY PRECLUDED IDENTIFICATION OF ANTENNA MASTS* OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D ARKHANGELSK RADCOM STA S 25X1,464-14*EN 040-374W 25X1 D NAC STATUS OPERATIONAL 25X1 D 25X1 D 25X1 D 25X1 D ARKHANGELSK RDO COM RCVR STA 25X1 A 64-24- N 040-x'19, NAC STATUS:OPERATIONAL 37 Handle Via Approved For Release 2000/QA/l7Sf~ l T04562A000600010046KOHOLE I U 1%L I u Control System Only -~~ For Release 2000/dA)R7SEf1fzfT04562A000600010015-6 Control System Only TCS-20224/70 .- IPIR 7 SOVIET UNION KH-4 MISSION 1110 COMMO/ELEC/RADAR FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D CHITA HF COMMO FAC ALEKSANDROVSKOYE 25X1 51-49-EN 113-g43ME NAC STATUS UNDER CONSTRUCTION 25X1 D 25X1 D CHITA RDO COM STA KENONSKOYE 25X1A52,-034M 113-224ME NAC STATUS:OPERATIONAL ISAKOGORKA DFSTATION KRUG NAC 25X1 D 25X1 D 25X1 A64-29MN 040-45-ME STATUS;OPERATIONAL 25X1 D 25X1 D KANSK SOUTH AFLO AW ROR TALL KING 25X1"56-08- v 095-39E NAC STATUS;OCCUPIED 25X1 D 25X1 D KIROVABAD AW RADAR FAC TALL KING 25X1A37-?20-W 068-57-Iff 25X1 D 38 Handle Via Approved For Release 2000/0 j' j tR0gf q f jff 04562A0006000100+k8.6YHOLE Control System Only ' ft.4%qFor Release 2000/ffAM'7SUIREIFI T04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7 SOVIET UNION KH-4 MISSION 1110 COMMO/ELEC/RADAR FACILITIES 25X1 D KUDA OF STATION KRUG MAC 25X1 D 25X1 D 25X1 A52-34-ON 104-32-M STATUS OPERATIONAL 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D MARY AW RADAR FACILITY TALL KING 25X1A37-26-NN 061.47ME STATUS: OCCUPIED NOGLIKI AW RADAR FAC TALL KING NAC STATUS;OCCUPIEQ 25X1 D P DPO OZH SQTSGOR AW RADAR FAC TK 25X1 D NAC STATUS: OCCUPIED 25X1 D SITAL CHAY KRUG FACILITY 25X1 D NAC STATUSOCCUPIED 25X1 D 25X1 D TARA AW RADAR FAC TALL KING NAC 25X1A 25X1 D 25X1 D -48-M 143-09-ME 25X1 D 25X1 D 25X1A60-491W 034-j2. 25X1A40-46-MN 049-26-M 25X1 D 25X1 D 25X1A56-544W 074-21ME STATUS: OCCUPIED 39 Handle Via Approved For Release :E~ff [ET04562A000600010 4n5.K6YHOLE Control System Only 25X1 D 25X1 D ftV For Release 2000/b@i l {SEER 1 & TO4562A000600010015-6 Control System Only TCS-20224/70 -? IPIR 7 SOVIET UNION KH-4 MISSION 1110 COMMA/ELEC/RADAR FACILITIES 25X1 D 25X1 D TASHKENT OF STATION KRUG 1 NAC 25X1 D 25X1 D 6 A41.19 N 069-25- 66A669 STATUS: OPERATIONAL 25X1 D 25X1 D 25X1 D T SH.-N ROD COM XMTR STA SW 25X1A 41 2-ON 069-054ME 25X1 D NAC STATUS;OPERATIONAL 25X1 D 25X1 D 25X1 D ROO COM RCVR STA YEMELYANOVSKAYA 25X1A64-20^W 041w22-ME 25X1 D . NAC STATUS.; UNDER CONSTRUCTION 25X1 D 40 Handle Via Approved For Release 2000/OfOF SE& fDkg7p~04562A000600010bl5l-$EYHOLE ontro System Only ~00_ &RV For Release 2000/bTi~SEEUTR %T04562A000600010015-6 SIGNIFICANT RESULTS Control System Only TCS-20224/70 IPIR 7 KH-4 MISSION 1110 SOVIET UNION AIR BASE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D KUYBYSHEV/KRYAZH AIRFIELD 5 NAG STATUS :OPERATIONAL AIR ORDER OF BATTLE- 3 LIGHT STRAIGHT-WING 2 SMALL STRAIGHT-WING 4 LIGHT STRAIGHT-WING 3 POSE AIRCRAFT 2 SMALL STRAIGHT-WING 25X1 D MAGNITOGORSK AIRFIELD WEST 25X1A STATUS;OPERATIONAL 25X1 D 25X1 D U!- 0 PHYSICAL DESCRIPTION: 9 NM WEST OF MAGNITOGORSK# A 2,117 X 57-METER (69940 X 19S-FOOT) NNE/SSW SERVICEABLE CONCRETE RUNWAY, A 2.638 X 278-METER (8,6148 X 913-FOOT) NNE/SSW PROBABLY SERVICEABLE SOD RUNWAY, A 1.172 X.190-METER (3,845 X 624-FOOT) WNW/ESE SERVICEABLE SOD RUNWAY, A CONCRETE PARALLEL TAXIWAY, TWO CONCRETE END-CONNECTING TAXIWAYS, TWO CONCRETE CROSSOVER TAXIWAYS, A CONCRETE PARKING APRON. AND A SOD PARKING APRON WITH 26 PROBABLY CONCRETE HAROSTANDS. THE REFERENCE POINT (RP) IS THE CENTER OF THE CONCRETE RUNWAY, THE SUPPORT AREA CONTAINS ONE CONTROL BUILDING, ONE PROBABLE ADMINISTRATION BUILDING. ONE MAINTENANCE BUILDING, THREE PROBABLE MAINTENANCE iUILDINGSr 14 SUPPORT BUILDINGS. AND A SECURED POL STORAGE AREA. THE FIELD HAS ILS FACILITIES OFF BOTH ENDS OF THE CONCRETE RUNWAY, AND IS PROBABLY ALSO EQUIPPED WITH GCA. 41 Handle Via Approved For Release 2000/7 56 %- T04562A00060001 0?Io5 6YHOLE RET Control System Only Handle gj0 For Release 2000/bQfl7s EUJR&%T04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7 SOVIET UNION KH--4 MISSION 1110 AIR BASE FACILITIES 25XII D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D AIR ORDER OF BATTLE: 1 BADGER/CAMEL 2 COLT 1 PROS CRATE 3 PROB CREEK I. PROB CAB I DERELICT PERM AIRFIELD SOUTHWEST NAC STATUS OPERATIONAL AIR ORDER OF BATTLE: 25X1 D 25X1 D 25X1A57.,55-M 056-01-ME 17 SMALL SWEPT-WING 10 LIGHT STRAIGHT*WING 5 PROB SMALL SWEPT-WING 2 SMALL STRAIGHT-WING 1 MEDIUM STRAIGHT-WING 3++ PROB SMALL SWEPT-WING 1 SMALL STRAIGHT-WING 7 LIGHT STRAIGHT-WING 11 POSS AIRCRAFT VOLSK AIRFIELD STATUS: OPERATIONAL 25X1 D 25X1 D 25X1P62-01-EN 047-19-ME AIR ORDER OF BATTLE: 2 CRATE 3 SMALL STRAIGHT-WING 1 CAB 3 PROS HOUND 42 Handle Via Approved For Release 2000/7 g ft 7fTO4562A000600010D1666YHOLE Control System Only Handle Via 4 For Release 2000/a 7s4I k6PfET04562A000600010015-6 Control System Only 25X1 D TCS-20224/70 - IPIR 7 SOVIET UNION KH-4 MISSION 3.110 AIR BASE FACILITIES VORKUTA AIRFIELD EAST NAC STATUS OPERATIONAL AIR ORDER OF VATTLE; 5 PUSS AIRCRAFT 25X1 D 25X1 D 25X1 A67--28.. 064-18-SE 25X1 D OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X2 ELISTA AIRFIELD NORTH NAC i A 25X1 D 25X1 D 46-22 044-I.9 STATUS:OPERATIONAL AIR ORDER OF E3ATTLE. NONE DISCERNIBLE 25X1 D 43 Handle Via Approved For Release 2000/ "p7S ftT ftTO4562A000600010DI1SJBYHOLE Control System Only Handle Via Appned For Release 2000/;1'WP 75&-:tBVFET04562A000600010015-6 Control system only TCS-20224/70 ,> IPIR 7 SOVIET UNION KH-4 MISSION 1110 NAVAL' BASE FACILITIES SIGNIFICANT RESULT 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D AE3RLK 13AY NAVAL RASE PROMYSLOVKA 25X1A42-564ON 132-25E NAC STATUS:OPERATIONAL NAVAL ORDER OF BATTLE ON EAST SIDE OF BAY 9 PROB DD. 5 PROB PC 1 PROB PCE ..,. ON WEST SIDE OF BAY 5. AUXILIARIES ... ON EAST SIDE OF BAY I POSS KRESTA CLGM 5 PROB DD 1 POSS KASHIN DLG 7 PROB PCE AT SAY ENTRANCE 1 DO I SMAE,I. VESSEL ,,.. ON WEST SIDE: OF BAY 4 AUXILIARIES 1 SMALL VESSEL I POSS CLGM 4 POSE AUXILIARIES 1 KASHIN DLG 7 UNIDENTIFIED VESSELS 3 POSS DD 11 UNIDENTIFIED SMALL CRAFT 5 POSS DE 44 Handle Via Approved For Release 2000/1 ~E& R ?1?T04562A00060001 OOIt5Ci6HOLE Control System Only #jnpp.K?~I~X@?f For Release 2000/ P1 fFERA]R 8T04562A000600010015-6 Control System Only TCS-20224/70 IPIR 7 SOVIET UNION KH-?4 MISSION 1110 NAVAL BASE FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D A 25X1 D BALTIYSK NAVAL BASE NAC STATUS:OPERATIONAL NAVAL ORDER OF RATTLE: T UNIDENTIFIED SMALL VESSELS KLAIPEDA NAVAL BASE AND SHIPYARD NAC STATUS:OPERATIONAL NAVAL ORDER OF BATTLE: 5 UNIDENTIFIED SMALL CRAFT LIEPAJA NAVAL BASE AND SHIPYARD NAC 25X1 A .. 8 l 9- 5 E 25X1 D 25X1 D jj51PjO8, E 25 X1 A56 25X1 D 25X1 D 32- 021.?02-ME STATUS : QPERAT I ONAL NAVAL ORDER OF BATTLE; 16 MEDIUM SS (2 IN GRAVING 2 BOLVA APL DOCK) 2 UNIDENTIFIED AUXILIARIES a 00 8 UNIDENTIFIED SMALL 4 SMALL COMBATANTS (2 IN VESSELS GRAVING DOCK) 45 Handle Via Approved For Release 2000/"P75a ftf gMT04562A000600gj~frYl~S stYm Only 25X1 D 25X1 D HApproved For Release 2000/0'R7s~Kkr f T04562A000600010015-6 Control System Only 25X1 D 25X1 D TC. $ -20224/70 - IPIR 7 KH?-4 MISSION 1110 EPA,JA NAVAL BASE WINTER HARBOR STATUS. OPERATIONAL 25X1A REMARKS: CONSTRUCTION WAS CONTINUING ON THE QUAY< NAVAL ORDER OF BATTLE:. 25X1A I [JD 6 SMALL LANDING CRAFT 6 DE 7 SMALL COMBATANTS 6 POTI PC 12 SMALL UNIDENTIFIED 6 PROB POLNOCNY LSM VESSELS 25X1 D 25X1 D 25X1 D 25X1 D VENTSPILS NAVAL BASE NAC STATUS; OPERATIONAL NAVAL ORDER OF BATTLE: 10 UNIDENTIFIED SMALL VESSELS 25X1A57?23-M 021-33ME 25X1 D 25X1 D VLADIVOSTOK MISSILE PATROL BOAT BASE 25X1A43-04-M 131-~56~ 25X1 D NAC STATUS:OPERATIONAL 25X1 D 25X1 D NAVAL ORDER OF BATTLE: IN THE BAY 1 DO 2 SMALL VESSELS AT THE MISSILE PATROL. BOAT BASE 5 POSS OSA PTFG I, AUXILIARY 7 PT 4 SMALL VESSELS 46 Handle Via Approved For Release 2000/"P75.EqWEf WJ#T04562A000600gl l" - YHOLE on rol system Only SOVIET UNION NAVAL BASE FACILITIES 25X1 D 25X1 D 56-31 J 020-59-ME A p p)(110 For Release 20001 P1f~ AIR 8T04562A000600010015-6 Control System Only TCS-20224/70.- IPIR 7 SOVIET UNION KH'4 MISSION 1110 NAVAL BASE FACILITIES 25X1 D I PASS DD (IN BAY) 6 POSS OSA PTFG 7 PASS PT 14 UNIDENTIFIED SMALL VESSELS (4 ON THE QUAY) 25X1 D 25X1 D 25X1A 25X1 D 43~, 1 13 VLADIVOSTOK NVL RESERVE BASE NOVIK BAY -p51- 25X1 D NAC 25X1 D STATUS OPERATIONAL NAVAL ORDER OF BATTLE: 25X1 D 3 DD 1 LSM 15 PRQ B LSV 5 PRQB DD I PUSS DE 3 POSS LS.V 19 UNI 16 UNI DENTIFIED VESSELS DENTIFIED SMALL CRAFT 25X1 D 25X1D VOSTOK BAY NAVAL BASE LIVADIY.A NAC ;TATUS:OPERATIONAL 25X1 D 25X1 D 25X1 A42-52.N 132 -41ME 47 Handle Via Approved For Release 2000/47 S ftq T04562A000600glpp , 4s-l Only T Ell V, w ftd For Release 2000T Control System Only wt, 1~E =F f8TO4562A000600010015-6 TCS-2Q224/70 ? IPIR 7 SOVIET UNION K-44 MISSION 1110 NAVAL BASE FACILITIES 25X1D NAVAL ORDER OF BATTLE: 1 POSS PC 1 SUPPORT_VESSE, 5 SMALL VESSELS 25X1 D 25X1 D 25X1 D 1 PROS COMBATANT 8 SMALL VESSELS 9 UNIDENTIFIED VESSELS OTHER RESULTS-NO APPARENT CHANGE BUKHTA VITYAZ SUBMARINE BASE 25X1 D NAC STATUS;OPERATIONAL. NAVAL ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D DUNAYNAVAL MISSILE,.STORAGE NAC 1 SUPPORTVESSEL 25X1A 42-34?//N 131'11--//E 25X1 A42-56 25X1 D 25X1 D N 132.20-UE 48 Handle Via Approved For Release 2000/"~75l CfffT04562A00060090I?r~` SK "only uf T~d For Release 2000] 1$kCW 8TO4562A000600010015-6 Control System Only TCS-2Q224/70 - IPIR 7 SOVIET UNION NAVAL BASE FACILITIES KH*4 MISSION 1110 STATUS;OPERATIONAL MISSILE ORDER OF BATTLE; NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D DUNAY NVL MSL SUPP FAC KONYUSHKOVA 25X1A42..52- d 132-194ME NAC 25X1 D STATUS;OPERATIONAL MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D KALININGRA? NAVAL MISSILE. STORAGE NAC 25X1 D 25X1 D 25X1A5 ,-49,RWN 020-28 STATUS:OPERATIONAL MISSILE, ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 D STRELOK STRAIT NVL MISSILE STOR NO I 25X1A 42-54MN 132-34ME 25X1 D NAC STATUS;OPERATIONAL 49 Handle Via Approved For Release 2000/"~7qrfff RbT~T04562A0006009ongosK~fi-HOiy Apprnot eid For Release 2000/ N 7 . - t8P ET04562A000600010015-6 Control System Only TCS-2022++/70 - IPIR 7, SOVIET UNION. KH-++ MISSION 1110 NAVAL BASE FACILITIES 25X1 D 25X1 D 25X1 D MISSILE. ORDER OF BATTLES, NONE DISCERNIBLE 25X1 D 25X1 D VLADIVOSTOK NVL AMMO STOR RUSSKIY PUG 25X1A _ 0 13-48 NAC RE STATUS;OPERATIONAL NAVAL ORDER OF BATTLE. NONE DISCERNIBLE 50 Handle Via Approved For Release 2000/0 '~7 SI J 04562A000600010b'~f 24 -f YHOLE Control ys em Only Handle Via A or d For Release 2000 TCQF, TR 8T04562A000600010015-6 Control System Only TCS-20224/70 - IPIR 7' SOVIET UNION KH-4 MISSION 1110 GROUND FORCE FACILITIES SIGNIFICANT RESULTS 25X1 D 25X1 D BANK ARMY BARRACKS AL 1 25X1A39..24.NN 049-15ME 25X1 D NAC 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D STATUS;OCCUPIED GROUND FORCE ORDER OF. BATTLER 12 PROS VEHICLES KAZAN.ARMY BARRACKS GORKI AL I, 25X1A STATUS: OCCUPIED REMARKS: CONSTRUCTION ON THE TWO U-SHAPED BUILDINGS WAS STILL IN PROGRESS, 25X1 D 25X1 D 55.45MN049-09 E 25X1A GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE LENKORAN ARMY BARRACKS AL 1 NAC 25X1 D 25X1A38-45-v 04 25X1 D -514M STATUSSOCCUPIED GROUND FORCE ORDER OF BATTLE: 7 PROS VEHICLES 51 Handle Via " Approved For Release 2000/qta7SR f WDT04562A000600gjg0 n Only OeAf,g For Release 2000I11 7SFER -T tT04562A000600010015-6 Control System Only TCS-x20224/70 - IPIR 7 SOVIET UNION KH-4 MISSION 1110 GROUND FORCE FACILITIES 25X1 D OTHER RESULTS-NO APPARENT CHANGE 25X1 D 25X1 D 25X1 D 25X1 D BAGRATIONOVSK TACTICAL SSM BARRACKS jj24oOjjO C NA STATUS:OCCUPIEt MISSILE ORDER OF BATTLE: NONE DISCERNIBLE BANK ARMY TRAINING AREA 25X1 D NAC 25X1 D 25X1 D L ;NKORAN ARMY BARRACKS SOUTHEAST AL 3 Lvn "-38-45-MN 048-51?W MAC STATUS OCCUPIED GROUND FORCE ORDER OF BATTLE; NON~`. DISCERNIBLE STATUSOCCUPIEO GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 52 Handle Via Approved For Release 2000/ 4J 7$ Ij T04562A00060001 Vlts-*YHOLE Control System Only 25X1 D 25X1 D i * 049-18* 25X1 D 25X1 D Handle Via TP1 ~kC& T cwtrd For Release 2000 /1 8T04562A000600010015-6 Con rol System Only 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D TCS-20224/70 , IPIR 7 KM-4 MISSION 1110 25X1 D SOVIET UNION GROUND FORCE FACILITIES 25X1 D 25X1 D PORT ILICH TANK FIRING RANGE 1 25X1A58..52 ^N 048-+1-W NAC STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE SYZRAN ARMY BKS TANK AL 1 + TANK OCS NAC STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE 25X1A 25X1 D 25X1 D -XO#v O48 28"ME 25X1 D 25X1 D S R ENGR + ORDNANCE DPO RR STN EAST 25X1A53?10-M 048-28 NAC STATUS OPERATIONAL 25X1 D 53 Handle Via Approved For Release 2000/"F S I T04562A0006000cq~,i~s s m Only Handle Via SEEE~ 4~ys~'e!FIOr Release 2000/JP/ 7 3TO4562AOOO6OOOlOOl5-6 TCS-20224/70 4 IPIR 7 SOVIET UNION KH-+ MISSION 1110 DEPLOYED TACTICAL SSM FACILITIES SIGNIFICANT RESULTS 25X1 D KRASNYY KUT TACTICAL SSM SUPPORT FAC NAC STATUS:OCCUPIED 25X1 D 25X1 D 25X1 D MISSILE ORDER OF BATTLE. 20 VEHICLES (APPROXIMATELY) 25X1 D 25X1 D i A 44,31 25X1 D 25X1 D RAZUOLNOYE TACTICAL SSM BARRACKS AL 1 25X1A43-30-M 131-54M NAC STATUS:OCCUPIED MISSILE ORDER OF BATTLE4 20 VEHICLES (APPROXIMATELY) 54 Handle Via Approved For Release 2000/q p7S ~WWT04562A00060001 ob16-~y"? Con roI System Only apprQvlod For Release 2000/d411754%ERE 98T04562A000600010015-6 Control System Only TCS-20224+/70 .. IPIR 7 SOVIET UNION KH-4 MISSION 1110 DEPLOYED TACTICAL 5SM FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D SPASSK-DALNI.Y TACTICAL SSM BKS AL 3 2NAC ST?TUS:OCCUPIED MISSILE ORDER OF BATTLE: 30 VEHICLES (APPROXIMATELY) OTHER RESULTS-NO APPARENT CHANGE 25X1 D , 25X1 D 25X1 D 25X1 D BLAGODATNOYE TACTICAL SSM SUPPORT FAC 25X1A44-15-, N 132-054ME NAC STATUS: OPERATIONAL MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 55 Handle Via Approved For Release 2000/01'7 SjIkftEff 04562A000600010b'~F;-tf YHOLE Control ystem only Handle Via T rR~T ,Yo Apt y 4y Release 2000/04F : gfk-kDRY f 04562A000600010015-6 TCS-20224/70 " IPIR 7 SOVIET UNION KH-4 MISSION 1110 DEPLOYED TACTICAL. SSM FACILITIES 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D BRONNAYA GORA TACTICAL SSM SUPPORT FAC 25X1P52-36?i,N 025- 4 E NAC STATUS:OPERATI ONAL MISSILE ORDER OF BATTLE: NONE DISCERNIBLE KALININGRAD TACTICAL SSM SUPPORT FAG NAC STATUS:OPERATIONAL MISSILE ORDER OF BATTLE: NONE DISCERNIBLE 25X1 D 25X1 D 25X1 A 54-35 ..