KH-4 MISSION 1111 IPIR NUMBER 2 MISSION 111-1 OAK PART II 23-29 JULY 1970
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04562A000900010013-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
34
Document Creation Date:
December 28, 2016
Document Release Date:
August 4, 1999
Sequence Number:
13
Case Number:
Publication Date:
August 1, 1970
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T04562A000900010013-5.pdf | 1.14 MB |
Body:
Approved For Release 2000/04/17: CIA-RDP78TO4562A00090001WSICRET
NATIONAL PHOTOGRAPHIC
INTERPRETATION CENTER
PHOTOGRAPHIC INTERPRETATION REPORT
KH-4 MISSION III
IPIR NUMBER 2
MISSION IIII-I OAK PART II
23-29 JULY 1970
Handle via
Talent-Keyhole
Channels Only
GROUP IEXCLUDED FROM
AUTOMATIC DOWNGRADING
TOP SECRET
TCS-20334/70
AUGUST 1970
COPY N0117
I+2 PAGES
OAK-155/70
Approved f 'Retease 2000/04/17 : CIA-RDP78TO4562A000900010013-5
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining toTALENT-KEYHOLE Contiol System.
TARGET CATEGORIES
AND
ASSOCIATED NTP FUNCTIONAL AREAS (CODES)
1. STRATEGIC SSM
Deployed Strategic SSM Facilities (A)
2. MISSILE RANGES
Missile Ranges: Strategic SSM/Space Facilities (P)
Missile Ranges: Air- Launched Missile Facilities (0)
Missile Ranges: Naval-Launched Missile Facilities (R)
Missile Ranges: Tactical SSM Facilities (S)
Missile Ranges: SAM/AMM Facilities (T)
3. AIR DEFENSE MISSILES
Deployed AMM Facilities (B)
Deployed SAM Facilities (D)
4. ELECTRONICS/ COMMUNICATIONS
Deployed Communication/Electronic/Radar Facilities (C)
5. AIR
Air Base Facilities (E)
6. NAVAL
Naval Base Facilities (F)
7. GROUND
Ground Force Facilities (G)
8. TACTICAL SSM
Deployed Tactical SSM Facilities (H)
9. LOGISTICS
Military Logistics Facilities (K)
10. NUCLEAR ENERGY
Atomic Energy Facilities (0)
11. CBR
CBR Facilities (V)
12. INDUSTRY
Strategic Weapons Industrial Facilities (J)
General Purpose Weapons Industrial Facilities (L)
Non -Military Industrial Facilities (N)
Communication/Electronic/Radar R&D Facilities (U)
13. MISCELLANEOUS
Non-Military Logistics Facilities (M)
Miscellaneous/Unidentified Facilities (Z)
These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National
Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional
association (i.e., missile range tracking facilities are reported under "MISSILE RANGES," fly-away airfields at aircraft plants are reported
under "INDUSTRY," airfield nuclear weapons storage facilities are reported under "AIR," etc.).
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
T ,Wpd For Release 200digR/1V~Ud-14BP78T04562A000900010013-5
Control System Only
TCS-20344/.7 1. 2
TABLE, OF. CONTENTS,
PAGE
PREFACE,
MISSION, HIGHLIGHTS
CHINA, COMMUNIST
4
MISSILE RANGES
NUCLEAR ENERGY
6
MISCEL LANEOUS
8
UNITED ARpB REPUBLIC
AIR OE`NS MSSIL.ES
SOVET UNION
SSM, FACIL,ITI;ES
DEPLOYED STRATEGIC
21
.
MISSILE RANGES
36,
NUCLEAR ENERGY
37,
39
INDUSTRY.
Handle Via
Approved For Release 2000/W 75t(.Kt l [ JF$T04562A00090001073~1i YH0EE
Control System Only
Handle Via
d For Release 20004/1 E ha-F f8TO4562A000900010013-5
Control System Only
TCS-20334/70. IPIR 2
r PREFACE
PREFACE,
THIS IS THE SECOND OAK REPORT, ON MISSION. 1111-1..FOR COMPL TE.
PKE,FACE, SEE. OAK. PART 1 r 1111-1.
1 Handle Via
Approved For Release 2001? -&T- F~8T04562A00090001101QUE-i61Ot,E
t KU r Control System Only
Ta~eA lffkkbed For Release 200NAfP91-078TO4562A000900010013-5
Control System Only
TCS20334/70 - IPIR, 2 HIGHLIGHTS.
MISSION HIGHLIGHTS.
25X1 D
USSR
MISSILE? ACTIVITY
1 EIGHTEEN OF THE. 24 ICBM COMPLEXES AND THE TYURATAM
MISSILE, TEST CENTER WERE AT. LEAST PARTIALLY, OBSERVED. THESE.
INCLUDED THE SI,X SS9 COMPLEXES. THE FIVE ACTIVE SS-I,i.
COMPLEXES. AND THE, 55.13 COMPLEX. AT, YOSHKAR-'4LA r AS WELL, AS
SHADRINSK. TYUMEN. VERKHNYAYA SALDAr YURYA. ANDTATISHCHEVO
TATISHCHEVO WAS IDENTIFIED ONLY.
2, POSSIBLE SS-11 LAUNCH GROUP R (CONSISTING , OF. ONE
POSSIBLE LAUNCH, SITE DESIGNATED 115R IN AN EARLY, STAGE OF 25X1 D
CONSTRUCTION) .WAS NEWLY IDENTIFIED AT. THE KOSTROMA ICBM
COM LEX THERE WAS NO EVIDENCE 4F THE POSSIBLE GROUP ON
3, COVERAGE OF THE SS-9 COMPLEXES WAS AS, FOLLOWS. IMENT,
GASTELLO WAS CLEARP WHILE, ALEYSK r DOMBAROVSKI Y r KARTALY r UZHUR,
AND ZHANGIZ, TORE. WERE PARTIALLY OBSCURED BY SCATTERED CLOUDS,.
NO NEW. 55-9 LAUNCH GROUPS WERE, IDENTI IED, AT THE" DOMBAROVSKIY,
ICBM COMPLEX SITES 69 r 70 r AND 7:1 r ALL IN AN. EARLY STAGE OF
CONSTRUCTION, WERE .IDENTIFIED IN THE, K GROUP. AT THE IMENI
GASTELLO ICBM COMPLEX. SITE 55 THE, SIXTH, SITE IN THE I GROUP,)
WAS NEWLY. IDENTIFIED IN AN EARLY STAGE, OF,CONSTRUCTIONo AT,.THE.
UHUR ICBM COMPLEX,, .TWO NEW. SITES r 60 AND 61, BOTH I,N AN EARLY
STAGE OF ,CONSTRUCTION,, FILL OUT,.THE, J GROUP.
4, THREE, SS-11 LAUNCH, SITES. WERE, NEWLY, IDENTIFIED IN
EXISTING LAUNCH, GROUPS, AT THE YEDROVO ICBM, COMPLEX. COMPLETED
LAUNCH SITE 1358 WAS NEWLY.IDENTIFIED AS, THE TENTH SITE, IN THE
R GROUP,* SITE 116R HAS BEEN DROPPED AS A VALID, SITE.. LAUNCH
SITES 136, AND: c 137, BOTH,IN A LATE STAGE OF CONSTRUCTION' WERE,
NEWLYIDENTI 'IED IN. THET, GROUP.
59 AT, THE,. TYURATAM, MISSILE; TEST. CENTER, A POSSIBLE
MISSILE WAS AT LAUNCH PAD, C3. THE GANTRY. AT PAD 63 HAD BEEN.
MOVED TO A POSITION MUST TO THE REAR OF THE PAD, AND A MISSILE
LOADING EXERCISE WAS OBSERVED AT LAUNCH SITE 47'*
MRBM/IRBM, COMPLEX, SEARCH,
19 PRIORITY
ELEVEN OF THE
6
,
.
.
AREAS WERE AT LEAST PARTIALLY OBSERVED. AT THE DERAZHNYAMRBM,
COMPLEX. NEW ACTIVITY MAY REPRESENT THE
25X1D
START. OF A , NEW SS-11 LAUNCH, SITE,, IF NFIRMED. THIS SITE,
WOULD INDICATE THE START OF A NEW LAUNCH .GROUP, IN , ADDITIt N.
Approved For Release 2000/0A
J - R ftj ftT04562A0009000cjRP1jf s mHOnly
Tovs
~ ftaV For Release 2000/bQfl7SEEU tBW T04562A000900010013-5
Control System Only
TGS-2Q334/70 - IPIR. 2 HIGHLIGHTS
25X1A
EIGHT, TYPE _I1,10 SITES WERE NEWLY IDENTIFIED IN. EXISTING , LAUNCH
GKOUPS,r AND POSSI8LE LAUNCH. SITES 5D, 36D. AND 43.E WERE
CONFIRMED,, SITES 56. 57, AND 58. ALL, ,IN A MIDSTAGE OF,
CONSTRUCTION. ARE . IN, LAUNCH GROUP, Da SITES 59 _IN A MIDSTAGE,
AND 60, IN. A LATE STAGE, OF, CONSTRUCTION ARE, IN LAUNCH GROUP, E.
SITES, 6I,. 62. AND 63. ALL IN ...THE, MIOSTAGE, OF, CONSTRUCTION,. ARE,
IN LAUNCH GROUP, F. ALL , SIX. GROUPS AT, THIS COMPLEX NOW. HAVE,
THEIR FULL COMPLEMENT OF TEN .LAUNCH. SITES,
NUCLEAR
ACTIVITY
7. LOCATION i04 SEMIPALATINSK NWPG.KONYSTANTEST AREA]
WAS IDENTIFIED AS THE SITE, OF, THE 21 JULY 1970.
UNDERGROUND NUCLEAR TEST# ACTIVITY CONTINUED AT THREE OTHER
PKOBABLE, TEST, LOCATIONS AND, AT. OTHER POINTS IN THE AREA.
CHINA
MISSILE ACTIVITY
8, AT THEY WU-CHAI SSM LAUNCH SITE. FOUR UNIDENTIFIED
VEHICLES WERE IN THE PAD AREA. AND ROADS, IN THE LAUNCH AREA
WERE,. BEING SURFACED,
Approved For Release 2000/04 7S F1~;RRP~7.T04562A000900016A1t ?5HOLE
T P K I KUr Control System Only
Tail n KEl'HDLFd For Release 2000Tf1~E WF f8T04562A000900010013-5
Control System Only
TCS-2O334/7O IPIR 2 CHINA, COMMUNIST.
MISSILE, RANGES
SIGNIFICANT-RESULTS
25X1 D
WU-CHAI SSM LAUNCH SITE, 25X1A
25X1D
25X1A
STATUS:OPERATIONAL
RkMARKS .
SLVEN VEHICLES, OR PIECES OF EQUIPMENT. WERE AT, THE LAUNCH SITE,
FOUR AT THE EDGE OF THE, LAUNCH PAD, TWO IN THE GROUND SUPPORT,
EWUIPMENTAREA SOUTH, AND ONE IN THE GROUND SUPPORT EQUIPMENT
AREA NORTH, THE ROADS WITHIN THE LAUNCH SITE, AND MOST OF THE
ACCESS ROAD FROM THE MAIN SUPPORT. BASE HAD BEEN SURFACED WITH A
DARK MATERIAL.
25X1 D
25X1 D
25X1 D
25X1 D
WU 'CHA I .. SSM..
SUPPORT AREAS NO
25X1A 25X1A
STATUS,; UNDER CONSTRUCTION
REMARKS:
NINE NEW BUILDINGS HAD BEEN CONSTRUCTED IN SUPPORT AREA 6, AND
A RAIL , SPUR, TO, THIS AREA WAS UNDER CONSTRUCTION, THE RAIL SPUR
CONTINUED FOR APPROXIMATELY 1 NM UR.THE VALLEY SE,OF-SUPPOR.T
AREA 6,' ALONG THIS VALLEY A NEW ROAD AND SEVERAL BUILDINGS HAD
Bk:EN CONSTRUCTED. NO SIGNIFICANT CHANGES.WERE APPARENT IN,
SUPPORT. AREAS 3r 4v 5o OR. 79
OTHER RESULTS-NO APPARENT CHANGE
25X1 D
WU-CHAI SSM SUPPORT. AREAS NO.1 + 2
25X1 D
TATUS;UNPER.CQNSTRUKTION
25X1A
25X1A
4 Handle Via
Approved For Release 2000/~7s r T04562A00090001Qaen3 HOLE
MRET Control System Only
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
25X1 D
Next 3 Page(s) In Document Exempt
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
T#Nf4 yyd For Release 2000T
SIGNIFICANT. RESULTS
UNITED. ARAB REPUBLIC
AIR DEFENSE MISSILES.
25X1 D
AL I KANOAR I YAH SAM. S
25X1 D NAG
STATUSOCCUPIED.
25X1 D
25X1 D
25X1 D
25X1 D
Control System Only
TCS-20334/70 - IPIR
111144
AL iSKANDARIYAH, SAM, SITE
STA.TUS.:ocCUPiED. 25X1A
RCM.MARKS:
.TWO UP THE . LAUNCH POSITIONS, WERE, OCCUPIED.
25X1 D
25X1 D
25X1 D
AL #SKANDARIYAH.SAM. SITE, A18-2
NAC
25X1A
25X1A
.STATUS,;OC.CUPIED 25X1A
25X1 D
AL ISKANDARIYAH SAM, SITE A22A-2
25X1 D NAC
STATUS:OCCUPIED. 25X1A
25X1 D
9 Handle Via
Approved For Release 2000/I j 7Sf~ tlfl T04562A000900Q1OOepSlcf~'HOLE
ontro System Only
TE A10-2
@f/1~Eq- f8TO4562A000900010013-5
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
25X1 D
Next 1 Page(s) In Document Exempt
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
Handle Via
Ap~aicaved For Release 2000/ /P1 ~FEUTR T04562A000900010013-5
Control System Only
TCS-0334f70 YPIR 2 UNITED ARAB REPUBLIC
II""I AIR DEFENSE MISSILES
25X1 D
L c AHIRAH SAM , SITE, BQI.*2 25X1A
STATU.S.:OCCUPIED
RLMARKS:
A NEW SITE HAD PEEN CONSTRUCTED INTERI..OCKING WITH. THE EXISTING
SITE. THE, NEW. SITE CONSISTS OF.SIX REVETTED LAUNCH POSITIONS,
A BUNKERED GUIDANCE AREA, AND A BUNKERED ' ACQUISITION, RADAR
POSITION, ONLY FOUR LAUNCH POSITIONS' QF THE ORIGINAL SITE,
RC~MAIN De TWO N W. MISSILE-HQLp, POSITIONS HAb BEEN' CONSTRUCTED,
25X1 D
25X1A
25X1 D
25X1A
12 Handle Via
Approved For Release 2000/8/'~7EC -F 9f~8TO4562A00090001DDdIGVfiLE
Control System Only
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
25X111
Next 7 Page(s) In Document Exempt
Approved For Release 2000/04/17 : CIA-RDP78TO4562A000900010013-5
M 0lyowd For Release 2000k1$EaRTR 8T04562A000900010013-5
a 0
Control System Only
TCS-20334/70. - IPIR 2 SOVIET UNION
111-1DEPLOYED STRATEGIC SSM FACILITIES
IGNIFICANT RESULTS
25X1 D
25X1 D
25X1 D
25X1 D
A I S R13M COMPLEX 25X1 A
ST.ATV$,; OPERATIONAL
25X1 D
25X1A
REMARKS:
THE LAUNCH SITE,, RAIL-TO ROAD TRANSFER POINT, HF COMMUNICATIONS
FACILITYr AND SEPARATE PROPELLANT?AREA WERE VISIBLE. AT LEAST
TEN VEHICLES OR PIECES. OF EQUIPMENT WERE AT THE?RAIL-TOROAD
TKANSFER POINT. NO SILO CONSTRUCTION WAS OBSERVED,
ALI
K ICBM. COMPLEX
STATUS;OPERATIONAL
25X1A
25X1 D
25X1A
REMARKS:-
ALL KNOWN COMPONENTS OF THE COMPLEX. WERE, OBSERVED. NO NEW.
MISSILE. ACTIVITY WAS OBSERVED.
25X1 D
25X1D
BORSHCHEV.?MRBM
COMPLEX
NAC
STATUS.OPERATIONAL,
REMARKS;
ALL COMPONENTS, OF THE, COMPLEX. WERE V
THE LAUNCH PADS, AT LAUNCH SITES ]. AN
25X1A
SIBLE ERECTORS WERE, ON22. PROBABLE MISSILES ON
21 Handle Via
Approved For Release 2000/~ / 7 - M-9%f f T04562A00090001 QQeh395-'HOLE
Control System Only
iai~ -Wa. Og~ For Release 2000 1$EUFkTR 8T04562A000900010013-5
25X1 D
TCS-20334/70 - IPIR, 2 SOVIET. UNION
I1I1-1 DEPLOYED STRATEGIC SSM,FACILITIES
TRANSPORTERS WERE ON THREE PADS AT LAUNCH, SITE I. SUPPORT.
VEHICLES WERE ON ALL FOUR PADS , AT LAUNCH SITE 29 NO SILO
CONSTRUCTION WAS OBSERVED.
25X1 D
DERAZHNYA MRSM COMPLEX 25X1A
25X1D
25X1A
25X1 D
STATUSIOPERATIONAL
RLMARKSS
ALL ELEMENTS OF THE COMPLEX WERE_ OBSERVED.. VEHICLES AND
EQUIPMENT WERE, VISIBLE AT LAUNCH SITES Ir 2r AND 3. EIGHT TYPE
1110 LAUNCH SITES WERE NEWLY IDENTIFIED IN EXISTING LAUNCH
GHOUPS'R AND POSSIBLE ' LAUNCH. SITES 5D- 360, AND 48F HAVE BEEN.
UPGRADED TO CONFIRMED LAUNCH SITES. LAUNCH SITE 53E HAS BEEN..
CONFIRMED AS THE. LAUNCH; CONTROL SITE FOR LAUNCH, GROUP..E INSTEAD
OF LAUNCH SITE 40E, THERE ARE NOW 60 CONFIRMED TYPE IIID
LAUNCH SITES IN SIX GROUPS AT THIS COMPLEX, CONSTRUCTION,. WAS
CONTINUING AT THE RAIL-TO-ROAD TRANSFER POINT. A NUMBER OF NEW
BARRACKS AND HOUSING UNITS WERE UNDER CONSTRUCTION AT
KHMELNITSKIY MREM/IRBM DIVISION HEADQUARTERS.
A NEW ROAD AND TWO CLEARINGS.P ONE OF WHICH CONTAINS
UNIDENTIFIED ACTIVITY,_WERE VISIBLE EAST OF MRBM LAUNCH SITE 3
AT 49-24N 27-09E. THE ROAD AND CLEARINGS ARE NEW SINCE.- 25X1D
DATA FOR THE NEW SITES
62F
LAUNCH GEOGRAPHIC CONST. NOT FIRST.
SITE COORDINATES. STAGE PRESENT, SEEN
b6O
b7D
b8D
b9E
40E
t1F.
25X1A
25X1 D
22 Handle Via
Approved For Release 2000VYP / 7Sf~ ~of f TO4562A00090001 OOl13 8~HOLE
Control System Only
Handle Via
TAplpl ad For Release 20007 /1~E I E FIf8T04562A000900010013-5
Control System Only
TCS-20334/70_? IPIR 2 SOVIET UNION
1111-1 DEPLOYED STRATEGIC SSM.FA.CiLJTIES
PHOTOGRAPHIC REFERENCES FOR THE NEW SITES
LS 56D -- 36
S67D..,36
580 36
59E 36,
25X1 D
25X1 D
LS 63F -- 36
L$61F
LS 62F
LS 60E 36
DQMbAROVSKIY ICBM COMPLEX25X1A
STATUS;OPERATIONAL
REMARKS:
ALL KNOWN COMPONENTS OF THE COMPLEX WERE OBSERVED, INCLUDING-
THREE NEWLY IDENTIFIED LAUNCH SITESe THE NEW.SITESr 69K. 7QKv
AND 7-1K.9 WERE IN THE EARLY STAGE OF CONSTRUCTION, POSSIBLE
LAUNCH SITE 68K HAS BEEN CONFIRMED AND WAS. ALSO IN, THE EARLY
STAGE. OF CONSTRUCTION, FIVE SITES. HAVE NOW BEEN IDENTIFIED IN,
THE K GROUP
DATA FOR THE NEW SITES --
LAUNCH GEOGRAPHIC CQNS1 NOT, FIRST
SITE COORDINATES STAGE PRESENT SEEN
b9K
70K
71K
. PHOTOGRAPHIC REFERENCES FOR THE NEW SITES -
LS 69K 82.
LS 70K 82
LS 71K 82
25X1 D
25X1 D
25X1 D
25X1 D
25X1A
23
Handle Via
Approved For Release 20001?ECCRI .P F 8T04562A0009000190r1-SE`SOI.E
Control System Only
H "
T f"WqT d For Release 2000j~
Control System Only
TCS!
111.
25X1 D
@f/1~E.q - f8TO4562A000900010013-5
20334/70.- IPIR. 2 SOVIET UNION,
'.I DEPLOYED STRATEGIC SSM FACII. TIES
MENI GASTELLO ICBM COMPLEX 25X1D
25X1D 25X1A 25X1A
25X1 D
25X1 D
STATUS :OPERAT I ONAL.
REMARKS:
ALL KNOWN COMPONENTS OF THE COMPLEX WERE OBSERVED. THIS TOTAL.
INCLUDES ONE NEWLY IDENTIFIED SS-9 LAUNCH SITE. 551 WHICH
COMPLETES THE I GROUP, THE SITE WASINAN EARLY STAGE OF
CONSTRUCTION AT 50-42N 065-47E. IT WAS NOT PRESENT IN 25X1D
AND WAS FIRST SEEN IN, LAUNCH SITES 39, 40. 41,
42F AND 43 IN THE G GROUP HAD BEEN COMPLETED, MAKING , THE
SEVENTH GROUP AT THIS COMPLEX COMPLETE. NO OTHER, NEW MISSILE;
ACTIVITY WAS. OBSERVED,
24 Handle Via
Approved For Release 2000 f ~ $ l1 E& RQ DF7f8T04562A00090001O0@Irt3 8oLE
l1 ~K purr Control System Only
H~ dYleYVia
iMp c Aftd For Release 2000T
Control System Only
TPS-20334/70 ,. IPIR 2
111.*-,
9Z/1 Eqf4T F f8TO4562A000900010013-5
SOVIET;. UNION.
DEPLOYED STRATEGIC, SSMFACILITIES
25X1 D
25X1D
25X1 D
KAMENETS-POUOLSK I Y MRBM C
STATUS NOT OPERATIONAL. 25X1A 25X1A
RC ;MARKS;
ALL COMPONENTS OF THE COMPLEX WERE, OBSERVED. NO MISSILES OR
SUPPORTING EQUIPMENT WERE VISIBLE AT. EITHER LAUNCH SITE. TYPE
1110 LAUNCH. SITES OBSERVED IN THE COMPLEX AREA ARE REPORTED IN.,
THE READOUT FOR. THE DERAZHNYA MRBM COMPLEX 25X1A
25X1 D
25X1 D
KQROSTEN MR8M COMPLEX
25X1A
25X1A
25X1 D
STATUS;UNKNOWN
RLMARKS:
ONLY FIXED FIELD SITES 1 AND 4 WERE VISIBLE. NO SILO
CONSTRUCTION WAS OBSERVED.
25X1 D
KQSTROMA ICBM COMPLEX
25X1 D
25X1A
STATUS;OPERATIONAL
RkMARKS.
ALL KNOWN COMPONENTS OF.THE COMPLEX WERE OBSERVED, INCLUDING
ONE NEWLY IDENTIFIED POSSIBLE LAUNCH SITE, WHICH, IS THE FIRST
SITE IN POSSIBLE LAUNCH GROUP Re-THE TENTH GROUP AT THIS
COMPLEX, POSSIBLE LAUNCH SITE ].15R, IS IN THE , EARLY STAGE OF.
CONSTRUCTION AT 57-4ON 041-48E.. THE POSSIBLE SITE WAS NOT.
PRESENT ON AND WAS.FIRST SEEN ON
25X1 D
25 Handle Via
Approved For F &9e 2000/ x1lt fpgFPT04562A00090001OO1t CLE
T U Control System Only
25X1A
Handle Via TTi~pp
~bII W~~I For Release 2000/U'411 ~ ~1 rr~~EE A-Rt9P~~~~11~~
8T04562A000900010013-5
A
Co t of System Only
TCS-20334+/7Q IPIR 2 SOVIET UNION
,
11111 DEPLOYED STRATEGIC SSM FACILITIES
25X1 D
25X1 D
25X1 D
KOZ.LSK ICBM COMPLEX
25X1A 25X1D
25X1A
STATUS;OPERATIONAL
REMARKS 94
APPROXIMATELY 100 OF THE 110 LAUNCH SITES WERE Ok3SERVED,.NO NEW
MISSILE ACTIVITY WAS. OBSERVED.
26
Handle Via
Approved For Release 2000(4(1?tC$ f8T04562A0009000tQQQ~1.9E iOt.E
P K~r Control System Only
T r d For Release 200fTI99/1~-~g~a-14BP78TO4562A000900010013-5
Control System Only
TCS-20334J70.-.IPIR 2 SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
25X1 D
25X1 D
25X1 D
KREMOVO MRBM, COMPLEX,
STATUS:UNKNOWN
REMARKS;
NO ELEMENTS OF THE,COMPLEX,WERE VISIBLE, NO SILO CONSTRUCTION
WAS OBSERVED IN THE VISIBLE PORTION OF THE SEARCH. AREA.
25X1A
25X1 D
LEBtDIN IRBM COMPLEX
25X1 D NAG
STATUS;OPERATIPNAL. 25X1A
REMARKS
ONLY LAUNCH SITE 3 WAS VISIBLE. FOUR LAUNCHERS WERE ONTHE..
PADS. NO SILO CONSTRUCTION WAS OBSERVED.
25X1 D
25X1 D
25X1 D
NOVUSYSQYEVKA IRBM COMPLEX 25X1A
STATUS:.UNKNOWN
25X1A
RLMARKS 1
NO COMPONENTS OF THE COMPLEX WERECOVEREO, NO SILO
CONSTRUCTION ,WAS OBSERVED IN THE VISIBLE PORTION OF THE SEARCH
AKEA.
25)1 D
27 Handle Via
Approved For Release 2000/0-4/ 7St" A & ~7 T04562A00090001OT04 J4SYHOLE
C`RL Control System Only
25X1A
HaLdle Via
T .pfAWgd For Release 2009/&/1VCC1'A-R9978T04562A000900010013-5
Control System Only
. 2 UNION.
TCS-20334/70 - IPIR SOVIET
A
EGIC SSM FArILITIES
A
DEP
YED STR
T
25X1 D
OSTKOG MRB.M COMPLEX
25X1 D NAC
STATUS
OPERATIONAL
RLM.ARKS
ALL COMPONENTS . OF. COMPLEX WERE OBSERVED. EXERCISES WERE. IN.
PKOGRESS ON , ONE, LAUNCH PAD AT, EACH LAUNCH SITE. THE, NORMAL.
COMPLEMENT OF ERECTORS AND OXIDIZER AND FUELTRANSPORTERS WAS
PRESENT AT EACH. SITE. NO SILO CONSTRUCTION WAS OBSERVED.
25X1 D
PERM ICBM. COMPLEX
25X1 D
25X1A
25X1A
STA. TUS