KH-4 MISSION 1111 IPIR NUMBER 17 OAK SUPPLEMENT PART XI 23 JULY - 10 AUGUST 1970
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04562A001200010001-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
49
Document Creation Date:
December 28, 2016
Document Release Date:
October 8, 1999
Sequence Number:
1
Case Number:
Publication Date:
September 1, 1970
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T04562A001200010001-4.pdf | 2.08 MB |
Body:
Approved For Release 2000/04/17 : CIA-RDP78T04562A0012000 VCRET
J&~EMMZ 'T
NATIONAL, PHOTOGRAPHIC
INTERPRETATION CENTER
PHOTOGRAPHIC INTERPRETATION REPORT
KH-4 MISSION liii
IPIR NUMBER 17
OAK SUPPLEMENT PART XI
23 JULY - 10 AUGUST 1970
Handle via
Talent-Keyhole
Channels Only
TOP SECRET
TCS-20420/70
SEPTEMBER 1970
COPY NO 117
58 PAGES
GROUP I: EXCLUDED FROM
AUTOMATIC DOWNGRADING 1 4170
ApproYedE For Release 2000%04/17 : CIA-RDP78TO4562AO0120001 I =~
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
This document contains Information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive information In the designated control channels. Its security must be maintained in accordance
with regulations pertaining toTALENT-KEYHOLE Conttol System.
TARGET CATEGORIES
AND
ASSOCIATED NTP FUNCTIONAL AREAS (CODES)
1. STRATEGIC SSM
Deployed Strategic SSM Facilities (A)
2. MISSILE RANGES
Missile Ranges: Strategic SSM/Space Facilities (P)
Missile Ranges: Air- Launched Missile Facilities (Q)
Missile Ranges: Naval-Launched Missile Facilities (R)
Missile Ranges: Tactical SSM Facilities (S)
Missile Ranges: SAM/AMM Facilities (T)
3. AIR DEFENSE MISSILES
Deployed AMM Facilities (B)
Deployed SAM Facilities (D)
4. ELECTRONICS/COMMUNICATIONS
Deployed Communication/Electronic/Radar Facilities (C)
5. AIR
Air Base Facilities (E)
6. NAVAL
Naval Base Facilities (F)
7. GROUND
Ground Force Facilities (G)
8. TACTICAL SSM
Deployed Tactical SSM Facilities (H)
9. LOGISTICS
Military Logistics Facilities (K)
10. NUCLEAR ENERGY
Atomic Energy Facilities (0)
11. CBR
CBR Facilities (V)
12. INDUSTRY
Strategic Weapons Industrial Facilities (J)
General Purpose Weapons Industrial Facilities (L)
Non -Military Industrial Facilities (N)
Communication/Electronic/Radar R&D Facilities (U)
13. MISCELLANEOUS
Non-Military Logistics Facilities (M)
Miscellaneous/Unidentified Facilities (Z)
These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National
Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional
association (i.e., missile range tracking facilities are reported under "MISSILE RANGES," fly-away airfields at aircraft plants are reported
under "INDUSTRY," airfield nuclear weapons storage facilities are reported under "AIR," etc.).
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
TAL N EYHS[E_elease 200 64 RETA-WbP78TO4562AO01200010001-4
CONTROL SYSTEM ONLY
.TCS 20420/70 w IPIR 17
KH-4 MISSION 1111
TABLE OF CONTENTS
PREFACE
MISSION HIGHLIGHTS
CHINAI COMMUNIST
MISSILE RANGES
AIR DEFENSE MISSILES
AIR BASE FACILITIES
GROUND FORCE FACILITIES
INDUSTRY
MISCELLANEOUS
UNITED ARAB REPUBLIC
INDUSTRY
25X6
ROMANIA
AIR DEFENSE MISSILES
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
MISSILE RANGES
AIR DEFENSE MISSILES
INDUSTRY
PAGE
1
2
3
4
1i
13
22
23
24
26
27
30
32
51
YUGOSLAVIA
AIR DEFENSE MISSILES 55
JLE VIA
For Release 2000/04/17 :CIA-RDP78T04562A00120 1
Approved YHOI-E
I 99LRM4~N
TOP SECRET RUFF CONTROL SYSTEM ONLY
A iINrD V4,,~&ase 2000/d T49~7s it[9f gT04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 -.IPIR 17 PREFACE
KH-4 MISSION 1111
PREFACE
THIS IS THE ELEVENTH OAK SUPPLEMENT REPORT ON MISSION 1111,
FOR ADDITIONAL PREFACE DETAILS. SEE FIRST OAK SUPPLEMENT,
Approved For Release 2000/04/17 : CiA-RDP78T04562A0012Qrp( 1 VIA
A EN -KEYMQLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
Hwy
T AL NT*~*For Release 200 84 tTA b 78TO4562AO01200010001-4
KEYHOLE
CONTROL, SYSTEM ONLY
TCS 20420/70 "' IPIR 17 HIGHLIGHTS
KH-4MISSION 1111
MISSION HIGHLIGHTS
USSR
MISSILE ACTIVITY
A SIX-POSITION SA-5 LAUNCH SITE AND A SEPARATELY SECURED
SQUARE PAIR RADAR HA VE BEEN NEWLY cONSTRUCTEp AT GORKIY
SAM STTF 818.2.
25X1 D
25X1 D
Approved For Release 2000/04/17 : CIA-RDP78T04562A00120Qg1L0 YMOiA
QLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
eElease 2000/b ~'17P~&IiIR AT04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17 CHINA# COMMUNIST
KH*i+ MISSION 1111 MISSILE RANGES
SIGNIFICANT RESULTS
25X1 D
WU
25X1 D 25X1 D
CHA MAIN SUPPORT BASE 38-48M ON 111-36-
STATUS:UNDER CONSTRUCTION
REMARKS;
RAIL BED CONSTRUCTION HAS BEEN STARTED FOR,TME REMAINING 1#341
METERS (49400 FEET) TO THE MAIN SUPPORT BASE FROM SUPPORT AREA
24 A RAIL SPURR 4,497 METERS (13010 FEET).. HAS BEEN EXTENDED
FROM THE RAILROAD UNDER CONSTRUCTION ' ATWU-GHAT TO WU-CHAI
AIRFIELD NORTH RAILROAD CONSTRUCTION FROM NING"FWU EXTENDED AS
FAR AS 2Q591 METERS (80580 FEET') SW OF KO-LAND PASSING
APPROXIMATELY 366 METERS (11200 FEET) WEST OF THE WALLED
VILLAGEQ A TURNING WYE WAS UNDER CONSTRUCTION 701 METERS
(2x300 FEET) NORTH OF KO*LAN AND EAST OF THE RAIL BEDo
25X1 D
25X1 D
Approved For Release 2000/04/17 : Cl -RDP78TO4562AO0120 1 ~ E VIA
4 E ~ YHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
4A
~2000T 6)4/1 F -RbM8TO4562AO01200010001-4
RL14
CONTROL. SYSTEM ONLY
TCS 20420/:70 1 IPIR 17 CHINA, COMMUNIST
KH-4 MISSION 1111
AIR DEFENSE'MISSILES
SIGNIFICANT RESULTS
CHANG-CHIAJ'KOU SAM SITE A15-2
25X1 D NAC
STATUS;OCCUPIED
REMARKS:
25X1 D 25X1 D
jjjjON.j1jj58E
25X1A
EQUIPMENT WAS STILL BEING STORED.IN THE DEEP GULLIES.
MISSILE ORDER OF. BATTLES
4 PROFS LAUNCHERS
FAN SONG RADAR
25X1 D
CHANG-CHIA*KOU SAM SITE 012.2 40-41
25X1 D
STATUS40CCUPIED
PHYSICAL DESCRIPTION:
21,9 NM EAST OF CHANGUCHIA-KOU.
25X1A
25X1 D
25X1 D
THE SITE CONSISTS OF SIX REVETTED POSITIONS OCCUPIED BY
LAUNCHERS AND MISSILE TRANSPORTERS,' THE GUIDANCE.AREA WAS
OCCUPIED BY A PROBABLE ,FAN SONG RADAR AND FOUR BUILDINGS. THE
SIX EXCAVATED AND REVETTED LAUNCH POSITIONS ARE ARRANGED IN TWO
ESSENTIALLY STRAIGHT LINES, A PROBABLE MISSILE-HOLD BUILDING
IS ON THE PERIMETER ROAD TO THE EAST OF THESITEs THE SUPPORT
AREA CONTAINED APPROXIMATELY 30.TENTS AND NUMEROUS PIECES OF
EQUIPMENT
MISSILE ORDER OF BATTLES
6 LAUNCHERS 6 MISSILE. TRANSPORTERS
1 PROB FAN SONG RADAR I PROB'MISSILE TRANSPORTER
25X1 D
Approved For Release 2000/04/17 : ftlA-RDP78T04562A0012000 VIA
TALENT-KEYHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
F. ~g-LRelease 2006W4/~IA P78T04562A001200010001-4
CONTROL. SYSTEM ONLY
TCS.20420/70 " IPIR 17
KH'i+. MISSION 1111
CHANG-CHIA-KOU SAM SITE D10m2
25X1 D
STATUS: OCCUPIED
25X1A
CHINA. COMMUNIST
AIR DEFENSE MISSILES
25X1D 25X1D
40447-EN? 115.35ME
PHYSICAL DESCRIPTION:
32.4 NM EAST OF CHANG-CHIA"KOU.'
THE SITE CONSISTS OF SIX REVETTED POSITIONS. THE GUIDANCE AREA
WAS OCCUPIED BY A PROBABLE FAN SONG RADAR AND ONE BUILDING,
.THE SIX EXCAVATED AND REVETTED LAUNCH POSITIONS ARE ARRANGED IN
TWO ESSENTIALLY STRAIGHT LINES. THE SUPPORT AREA CONTAINED
THREE MISSILE TRANSPORTERS, ONE PROBABLE MISSILE' TRANSPORTER.
AND FIVE PROBABLE TRACKED PRIME MOVERS,`
MISSILE ORDER OF BATTLE
6 LAUNCHERS
1 PROBFAN SONG RADAR
3 MISSILE TRANSPORTERS
25X1 D
1 PROS MISSILE TRANSPORTER
5 PROS TRACKED' PRIME MOVERS
2 POSS VANS.
25X1D 25X1D
CHANG-CHOU SAM SITE A01-2 24-36 N 117.'39E
25X1 D
STATUS:UNKNOWN 25X1A
MISSILE ORDER OF BATTLES
AT LEAST 5 PIECES OF
EQUIPMENT
25X1 D
CHIHtCHINoHSIA SAM SEARCH AREA 4O4"1O-//N 09726-//
25X1D
STATUS:UNKNOWN
REMARKS: 25X1A
25X1A
YU-MEN SAM SITE A12A-2 t WAS OCCUPIED'. NO OTHER
MISSILE-RELATED ACTIVITY WAS OBSERVED.
Approved For Release 2000/04/17 : 6IA-RDP78T04562A00122~0~AL . 8HOLE
0E" tV I A
~T` TOP SECRET RUFF CONTROL SYSTEM ONLY
Hit For Release 200644f ~ IAR P78T04562A001200010001-4
TAL -MHOL>E
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17 CHINA. COMMUNIST
KH-4 MISSION 1111 AIR DEFENSE MISSILES
25X1 D
25X1 D 25X1 D
CHI-NINE SAM SITE A3O.2 25X1A 41-04?1W 112-58-SE
25X1 D
STATUS OCCUPIED
PHYSICAL DESCRIPTION:
5vB NM WNW OF CHI-NINE.
THE SITE CONSISTS OF SIX EXCAVATED AND PARTIALLY REVETTED
LAUNCH POSITIONS. EACH OCCUPIED BY A MISSILE TRANSPORTER. FIVE
LAUNCHERS AND ONE PROBABLE LAUNCHER . WERE OUTSIDE THE REVETMENTS
IN A FIELD-DEPLOYED PATTERN. THE.REVETTED SITE CONFIGURATION
IS ESSENTIALLY SQUARE. THE CENTRAL GUIDANCE AREA CONTAINED A
SQUARE EXCAVATION, AN ADDITIONAL NINE EXCAVATIONS WERE IN THE
SUPPORT AREA.
MISSILE'ORDER OF BATTLE:
5 LAUNCHERS 10 MISSILE TRANSPORTERS
I PO55 LAUNCHER 12 VANS
1 PROB FAN SONG RADAR 5 TRACKED PRIME MOVERS
25X1 D
HSI-AN S M SEARCH
25X1 D
STATUS :.UNKNOWN
25X1A
34-15-//N' 108-5040//E
REMARKS: 25X1A
SAN-YUAN SAM SITE A06-2
MISSILE-RELATED ACTIVITY WAS OBS-RVED.
25X1
WAS OCCUPIED. NO OTHER
Approved For Release 2000/04/17: 6A-RDP78T04562A0012gR@gg0~R 9VIA
HOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
HA4 r-dik%l For Release 2 0 0 # ?Q; IAWbP78T04562A001200010001-4
TAG NT->KEYHOLE
CONTROL SYSTEM ONLY
TCS 20420/70 .. IPIR 17 CHINAv COMMUNIST
KH-f MISSION 1111 AIR DEFENSE MISSILES
TARGETS
25X1 D 25X1 D
HU!-HOMHAO+TE SAM SITE C12-2 25X1A 40-41-EN 112-04-ME
25X1 D
STATUS:OCCUPIED
PHYSICAL DESCRIPTION:
20.2 NM ESE OF HU HO HAO-TEm
THE SITE CONTAINS SIX EXCAVATED AND REVETIED LAUNCH POSITIONS.
EACH OCCUPIED BY A LAUNCHER AND A MISSILE TRANSPORTER. THE
SITE CONFIGURATION IS ESSENTIALLY SQUARE.. THE CENTRAL GUIDANCE
AREA CONTAINED A PROBABLE FAN SONG RADAR AND A LINEAR
EXCAVATION WHICH PROBABLY CONTAINED, THE FAN SONG SUPPORT VANS.
THE SUPPORT AREA IMMEDIATELY TO THE EAST CONTAINED SIX MISSILE
TRANSPQRTERSP APPROXIMATELY 30 TENTS, AND NUMEROUS UNIDENTIFIED
PIECES OF EQUIPMENT.
MISSILE ORDER OF BATTLE:
6 LAUNCHERS 12 MISSILE TRANSPORTERS
3. PROB FAN SONG
25X1 D
LAN ?CHOU SAM SEARCH AREA 36-09-//N 103-30-//E
25X1 D
STATUS:UNKNOWN
REMARKS: 25X1A
LAN-?CHOU SAM SITES CE5A-2 r C29--2 (BE..
25X1 - AND ""~V WERE OCCUPIED. LAN-CHOU 25X1A
25X1A SAM SITE B12A'2 AND 29-2 WERE 25X1A
UNOCCUPIED. NO OTHER MISSILE-RELATED ACTIVITY WAS OBSERVED.
25X1 D
HANDLE VIA
Approved For Release 2000/04/17 : JIA-RDP78T04562A0012QQQlQgQt HOLE'
TOP SECRET RUFF CONTROL SYSTEM ONLY
r~Hwu~.t 4FeIease 200 /B4/1 CUA-k ,8T04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/7Q.w IPIR 17 CHINA# COMMUNIST
KHe4 MISSION 1111 AIR DEFENSE MISSILES
I v I v
LAND-CHOU SIT.E..C5A*~2 25X1A 35-54 N 3'> E
25X1 D
STATUS:OCCUPIED
REMARKS;
NUMEROUS STRUCTURES HAVE BEEN BUILT
25X1 D SAM SITE
25X1 D
OF THE
25X1D 25X1D
LAN-CHOU SAM SITE 029-2 36 1300 103012 E
25X1 D NAC
STATUS.OCCUPIED 25X1A
MISSILE ORDER OF BATTLE
6 LAUNCHERS I PROB FAN SONG RADAR
25X1
LAN-CHOU M SITE E04-2
25X1 D
STATUS:OCCUPIED
25X1A
25X1A
REMARKS:
LOW REVETMENTS WITH SHRUBS ENCIRCLED EACH. OF THE LAUNCH.
POSITIONSa EIGHT TENTS WERE IN THE SUPPORT AREA TO THE'WEST,
MISSILE ORDER OF BATTLE:
6 LAUNCHERS 1 PROS MISSILE TRANSPORTER
I PROS FAN SONG RADAR 6 FAN SONG ASSOCIATED VANS
10 MISSILE TRANSPORTERS
25X1 D
25X1 D 25X1 D
.36-38-ON 104-13-ME
Approved For Release 2000/04/17 .8CIA-RDP78T04562A00120014VIA
TALENT-KOHOLE
TOP SECRET. RUFF CONTROL SYSTEM ONLY
H y*F8 ERelease 200 641 BETA 578T04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70?- IPIR 17 CHINAP COMMUNIST
KFi-4 MISSION ] 111 AIR DEFENSE MISSILES
25X1 D 25X1 D
LIEN-CHENG SAM SITE A21-2 25X1A 25-38-EN 116-43-ME
25X1
STATUS:OCCUPIED
REMARKS:
THE SITE HAS BEEN COMPLETED AND CONSISTS OFS.IX EXCAVATED AND
REVETTED LAUNCH POSITIONS AND A CENTRAL GUIDANCE AREA
CONTAINING EIGHT BUILDINGS,
MISSILE ORDER OF BATTLE..
6 LAUNCHERS 1 PR05 GIN SLING RADAR
10 MISSILE TRANSPORTERS 9 UNIDENTIFIED VEHICLES
25X1 D
PAO TOU SAM SEARCH AREA 25X1A 40-39-/'/N 109-58-//E
25X1 D
STATUS:UNKNOWN
REMARKSt 25X1A
PAO*TOU SAM SITE A11-2
MISSILE-RELATED ACTIVITY WAS OBSERVED,
25X1
WAS OCCUPIED. NO OTHER
Approved For Release 2000/04/17 : C* A-RDP78T04562A00129Q
TOP SECRET RUFF CONTROL,
VIA
HOLE
YSTEM ONLY,.
HANDLE
L@lease 2000Th ' E 4fiF f8TO4562AO01200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 IPIR 17 CHINA. COMMUNIST
KH-4 MISSION 1111 AIR DEFENSE MISSILES
25X1 D 25X1 D
25X1 D PAQ-'TOU. SAM SITE A1i"2 25X1A 40-m31,, 110-07 E
STATUS:OCCUPIED
REMARKS;
THREE MORE UNOCCUPIED REVETTED LAUNCH POSITIONS HAVE BEEN
CONSTRUCTED, AND A FOURTH WAS UNDER CONSTRUCTION, OTHER GROUND
SCARRING WAS EVIDENT WITHIN THE LAUNCH AREA'.
MISSILE ORDER OF BATTLE:
6 MISSILE LAUNCHERS I PROS FAN SONG RADAR
25X1 D
OTHER RESULTS-NO APPARENT CHANGE
LAN-CHOU SAM SITE B12A-2
25X1 D NAC
STATUS;UNOCCUPIED
25X1 D
LAN-CHOU SAM SITE B29-2
25X1 D
STATUS; UNOCCUPIED
25X1 D 25X1 D
35 57- 4- E
25X1A
25X1 D 25X1 D
25X1A 3-8 - E
REMARKS:
THE SITE APPEARED ABANDONED.
25X1D
Approved For Release 2000/04/17 ?'IA-RDP78T04562A0012000t9W1-4 VIA
TALENT-KEYHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
,c W56eiease 1000rn"411-fu-- IFA-K`f ! Ttj I U4bb AUU110001 UUU1-4
.CONTROL SYSTEM ONLY
.TCS 20420/70 - IPIR 17
KH-4 MISSION 1111
SIGNIFICANT RESULTS
KAI?FENG AIRFIELD
25X1 D
CHINA, COMMUNIST
AIR BASE' FACILITIES
STATUS:UNDER CONSTRUCTION
REMARKS:
THE SW END OF THE RUNWAY WAS BEING EXTENDED. LARGE AMOUNTS OF
CONSTRUCTION MATERIAL WERE ALONG THE EDGE OF, THE:.RUNWAY AND THE`
PARALLEL TAXIWAY, AT LEAST 13 CONSTRUCTION/SUPPORT BUILDINGS
HAVE BEEN ERECTED ON THE SE SIDE OF THE RUNWAY,'
AIR ORDER OF BATTLE
NONE DISCERNIBLE
25X1 D
KUANG-CHOU/PAIYUN AIRFIELD 25X1D 25X1D 25X1D 23-1t1- E`
STATUSOPERATIONAL 25X1A
REMARKS;
THIS IS THE FIRST IDENTIFICATION OF THE HAWKER SIDDEL.EY TRIDENT
JET TRANSPORT AT A CHINESE .AIRFI'ELD.
AIR ORDER OF BATTLES
2 TRIDENT JET TRANSPORT 4 CRATE
25X1
SHAN-PO IELD
25X1 D
25X1D 25X1D
'. iii& "4--
STATUSS,OPERATIONAL 25X1A
REMARKS:
.THE SIX REVETTED HARDSTANDS PREVIOUSLY REPORTED U
. CONSTRUCTION ON MISSION HAVE' BEEN COMPLETED,
25X1 D
Approved For Release 2000/04/1713CIA-RDP78T04562A001200000UOkE4 VIA
TALENT-KEYHO.E
TOP SECRET RUFF CONTROL'SYSTEM ONLY
H oNd For Release 20g@Ybd ?9Fdl4 P78TO4562AO01200010001-4
TALENT-KEYHOLE
CONTROL SYSTEM ONLY.
TCS 20420/70 - IPIR 17 CHINAr COMMUNIST
KI*4 MISSION 1111 AIR BASE FACILITIES
25X1 D
AIR ORDER OF BATTLE;
22 SMALL SWEPT-'WING
7 CAB
Approved For Release 2000/04/17 : UTA-RDP78T04562A0012 Fi""
OLE
TOP SECRET-RUFF CONTROL SYSTEM ONLY
W"NULE 34ease 2000//1 fEATFl8T04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17
KH-4 MISSION 1111
SIGNIFICANT RESULTS
CHINA# COMMUNIST
GROUND FORCE FACILITIES
25X1 D 25X1 D
AI-HUI ARMY BARRACKS AL 1 so-O- EN 12728
25X1 D
STATUS:UNKNOWN
25X1A
PHYSICAL DESCRIPTION:
ON THE SOUTHERN EDGE OF AI'-HUI AND 1 NM SOUTH OF THE
SINO/SOVIET BORDER,
THE INSTALLATION CONTAINS ONE ADMINISTRATION,BUILDING, ONE
MESSHALLO TEN PROBABLEBARRACKSP THREE PROBABLE STORAGE
BUILDINGSP ONE SMALL POSSIBLE HEATING PLANT. AND APPROXIMATELY
FIVE SMALL SHEDS,
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1 D
CHAO^CHUANIPAO ARMY BKS AL 1
25X1 D
STATUS:UNKNOWN
25X1A
25X1 D 25X1 D
40-40-EN 115-18-^E
PHYSICAL DESCRIPTION:
1.5 NM SW OF CHAO--CHURN,
THE SECURED AREA CONTAINS APPROXIMATELY 16 BUILQYNGS, SMALL
SCALE PRECLUDED IDENTIFICATION OF THIS AREA AS BEING MILITARY.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1 D
CHING*'HSING ARMY 8KS S AL 1
25X1 D ^
STATUS:OCCUPIED 25X1A
25X1 D 25X1 D
46-58 MN 123,.01-ME
Approved For Release 2000/04/17 : &TA-RDP78TO4562AO012YA YE VIA
HOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
HAM' Vid For Release 20 M1'$ I/ -W15P78T04562A001200010001-4
TAL T-KEYHOLE
CONTROL SYSTEM ONLY
TCS 20420170 - IPIR 17 CHINA' COMMUNIST
KH-4 MISSION 1111 GROUND FORCE FACILITIES
PHYSICAL DESCRIPTION:
5.4 NM SOUTH OF CHING-HSING..
THE INSTALLATION CONTAINS ONE ADMINISTRATION BUILDING' ONE
POSSIBLE ADMINISTRATION BUILDING' 15 BARRACKS., 13
STORAGE/SUPPORT BUILDINGS' AND~ONE PARADE FIELD.
GROUND FORCE ORDER OF BATTLE;
NONE DISCERNIBLE
25X1 D
25X1 D
25X1 D 25X1 D
CHI?NING ARMY BARRACKS W AL 2 25X1A 4101 113-04-ME
STATUS; UNKNOWN
REMARKS:
THERE WAS NO APPARENT, CHANGE IN THE INSTALLATION' HOWEVER'
EXTENSIVE MILITARY ACTIVITY WAS OBSERVED IN A 5 X 5'NM AREA
IMMEDIATELY SW OF THE. INSTALLATION, WEAPONS POSITIONS (FIELD
ARTILLERY AND AAA SITES)' EXTENSIVE TRENCHING' NUMEROUS.
UNIDENTIFIED EXCAVATIONS, AT LEAST 70 PROBABLE TENTS' AND AT
LEAST 85 VEHICLE REVETMENTS WERE OBSERVED IN THIS AREA.
GROUND FORCE ORDER OF BATTLE.
8 PROB VEHICLES
25X1 D
25X1 D 25X1 D
SHANG-CHUAN CD SITE AL 3 21" 35-UN 112>45-
25X1 D
STATUS:UNDER CONSTRUCTION 25X1A
PHYSICAL DESCRIPTION:
ON THE SW EDGE OF SHANG*CHUAN. (ISLAND).
THE COASTAL DEFENSE SITE CONSISTS. OF AT LEAST FOUR POSITIONS
VIA,
Approved For Release 2000/04/17 4tlA-RDP78T04562A0012pRLq#~
%41 HOLE
TOP SECRET RUFF' CONTROL'SYSTEM ONLY
HA B oK orERelease 20b8?04 IREGI~ P78T04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17 CHINA. COMMUNIST
KH-+ MISSION 1111 GROUND FgRCE FACILITIES
AND AT LEAST 20 SUPPORT BUILDINGS.
MISSILE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1
TAI-PU-SSU-CHI ARMY OKS AL
25X1D
25X1 D
42.01-EN 115-12
25X1A
25X1 D
ME
STATUS:NEGATED
25X1D
REMARKS,
25X1D NO MILITARY INSTALLATION WAS OBSERVED AT.THE REFERENCED
COORDINATES. POSSIBLE DEFENSIVE WEAPONS POSITIONS, PERSONNEL
TRENCHES. AND AT LEAST 35 TENTS WERE OBSERVED AT 42-04--
115?10
25X1 D
25X1 D 25X1 D
WU-SU-LI ARMY BKS SSE AL 2 53-26- EN 123-22E
25X1 D
STATUS :UNKNOWN
PHYSICAL DESCRIPTION:
25X1A'
8 NM SE OF WU-SUuLI AND .7 NM SOUTH OF THE I SINO/SOVIET BORDER.
THE INSTALLATION CONTAINS 12 BUILDINGS AND IS A POSSIBLE LUMBER
CAMP.
GROUND.FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1 D
VIA
Approved For Release 2000/04/17 :eIA-RDP78TO4562AO01299eg~o 5 HO
LE
TOP SECRET RUFF CONTROL SYSTEM ONLY.
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
25X1 D
Next 6 Page(s) In Document Exempt
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
gtp6 RLelease 2006iV4/ 0 Tk- 78TO4562AO01200010001-4
CONTROL SYSTEM ONLY
TCS2042Q/70 - IPIR 17 CHINA. COMMUNIST
KH-4 MISSION 1111 MISCELLANEOUS
SIGNIFICANT RESULTS
25X1 D 25X1 D
HSUAN-HUA POSS SSM STOR FAC 40-38-EN 115-01^EE
25X1 D
STATUS:OPERATIONAL
REMARKS:
25X1A
THE INSTALLATION HAS BEEN IDENTIFIED AS A POSSIBLE SSM STORAGE
FACILITY* THE IDENTIFICATION IS BASED ON THE RESULTS OF
25X1 B
HSUAN-HUA POSSIBLE SSM STORAGE FACILITY IS SERVED BY A SPUR OF
THE PEKING/TA"TUNG RAIL LINE AND CONSISTS OF AN INITIAL
TRANSLOADING AREA, POSSIBLE MISSILE STORAGE AND CHECKOUT AREAS.
AND A SUPPORT AREA FOR PERSONNEL. AND EQUIPMENT, A HIGH.
GABLE-ROOFED BUILDING IS IN THE INITIAL; TRANSLOADING AREA AT
THE TERMINUS OF THE STANDARD-GAUGE RAIL SPUR. AT THIS BUILDING
LARGE OBJECTS CAN BE TRANSLOADED TO AN INTERNAL NARROW-GAUGE
RAIL SYSTEM OR ROAD. OTHER FEATURES FOUND AT THE FACILITY ARE
FOUR NARROW-GAUGE RAIL-SERVED POSSIBLE MISSILE STORAGE AND
CHECKOUT BUILDINGS. FOUR NARROW-GAUGE RAIL-SERVED TUNNEL.
ENTRANCES. A POSSIBLE MISSILE CHECKOUT AREA CONTAINING A
DRIVE.-THROUGH BUILDING AND DRIVE-IN BUILDINGS, AND TWO
HARDSTANDS CROSSED BY RAIL. AND SERVED BY ROAD RAMPS* 25X1D
THE HSUAN?HUA FACILITY WAS PARTIALLY OPERATIONAL AS EARLY AS
25X1 D CONSTRUCTION WAS OBSERVED'. TO BE
ESSENTIALLY COMPLETE ON PHOTOGRAPHY OF
25X1 D
25X1 D
Approved For Release 2000/04/17 IA-RDP78T04562A0012&0
LO nE HOt A
TOP SECRET RUFF CONTROL SYSTEM ONLY
H o For Release 20( 49f FM1ARI tfP78T04562A001200010001-4
TAL NT-KEYHOLE
CONTROL SYSTEM ONLY
TCS 20++20/70 - IPIR 17 UNITED ARAB REPUBLIC
KH-4 MISSION 1111 INDUSTRY
SIGNIFICANT RESULTS
25X1 D 25X1 D
HULWAN ARTY AMMO COMPONENTS PLANT 229.52*MN 031-19-ME
25X1 25X1A
STATUS:OPERATIONAL
REMARKS:
TWO LARGE BUILDINGS IN THE NORTHERN SECTION OF THE PLANT WERE
IN A LATE STAGE OF CONSTRUCTION.. A SMALL BUILDING IN THE
SOUTHERN PART OF THE PLANT REMAINED UNDER CONSTRUCTION.
25X1
Approved For Release 2000/04/17 ?-IA-RDP78T04562A0012i0A(( 11H VIA
TOP SECRET RUFF CONTROL SYSTEM ONLY
25X6
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
Next 1 Page(s) In Document Exempt
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
e -O eIease 200011 ECd -F&P~8T04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17 . SOVIET UNION
KH-4 MISSION 1111 DEPLOYED STRATEGIC SSM FACILITIES
SIGNIFICANT RESULTS
25X1 D 25X1 D
IMENI GASTELLO ICBM COMPLEX 510003 -EN 066-14 E
75X1 n
STATUS: OPERATI ONAL
25X1A
REMARKS:
ALL KNOWN COMPONENTS OF THE COMPLEX WERE'OBSERVED. THIS
INCLUDES THE NEWLY. IDENTIFIED LAUNCH 'SITE. 55Ie WHICH WAS
REPORTED IN THE OAKS LAUNCH SITES 39G. 46Gv 41Gr 42G. AND 43G
ARE NOW CQMPLETEQ THIS M THE SEVENTH GROUP COMPLETE AT
25X1DTHIS COMPLEX. ON PROBABLE PROPELLANT TRANSPORTER
TRAILERS AND TEN UN DENTIFIED.VEHICLES WERE OBSERVED IN THE
GARAGE AREA OF THE PROPELLANT FACILITY AT THE RAIL-TO-ROAD
TRANSFER POINTo
25X1 D
POSTAVY MRBM COMPLEX
25X1 D
25X1 D 25X1 D
55-15U N 026-5 E
T"ATU S;QPERATIQNAL 25X1A
REMARKS,
ALL COMPONENTS OF THE COMPLEX WERE VISIBLE. LAUNCH SITE 1 WAS
IN AN INCREASED STATE OF READINESS WITH PROPELLANT VEHICLES
ALIGNED ALONGSIDE ALL FOUR ERECTORS, NO MISSILES WERE
OBSERVED. LAUNCH SITE 2 WAS IN THE NORMAL STATE OF READINESS
WITH ERECTORS ON ALL FOUR PADS AND PROPELLANT VEHICLES PARKED
IN THE PROPELLANT STORAGE AREA, SIX LONG CYLINDRICAL
UNIDENTIFIED OBJECTS WERE OBSERVED IN THE SUPPORT AREAS AT BOTH
LAUNCH SITES 2 AND 30 NO SILO CONSTRUCTION OBSERVED.
25X1 D
Approved For Release 2000/04/17: A-RDP78T04562A0012q( Rj
FK
HVIA
TOP SECRET RUFF CONTROL. SYSTEM ONLY
H9d of crP- For Release 20 dM4 ~OA81 ~fP78TO4562AO01200010001-4
TAL NT HOLE
CONTROL SYSTEM ONLY
TCS 20420/70 -. IPIR 17 SOVIET UNION
KH*-4 MISSION 1111 DEPLOYED STRATEGIC SSM FACILITIES
25X1 D 25X1 D
54jjj29O2jl7-ME
SMORGON IRBM COMPLEX
25X1 D NAC
STATUS:OPERATIONAL
25X1A
REMARKS,
ALL COMPONENTS OF THE COMPLEX WERE VISIBLE, A PROBABLE MISSILE
EXERCISE WAS OBSERVED ON THE SOUTHERN PAD AT LAUNCH SITE 2. A
PROBABLE 5S-5 MISSILE ON A TRANSPORTER WAS ALIGNED WITH THE
ERECTOR. ERECTORS WERE VISIBLE ON ALL FOUR PADS AT BOTH SOFT
SITES. EIGHT OXIDIZER TRANSPORTERS WERE OBSERVED AT LAUNCH
SITE 1, A STORAGE AREA HAS BEEN CONSTRUCTER JUST SOUTH OF THE
TRANSFER POINT. THIS AREA IS SEPARATELY.FENCED FROM.THE
TRANSFER POINT AND CONTAINS FOUR LARGE CYLINDRICAL STORAGE
TANKS WITH A POSSIBLE ON/OFFLOADING DOCK FOR RAIL TANK CARS.
ALSO IN THIS FACILITY ARE FOUR LARGEP MULTISTORY WAREHOUSE-TYPE
BUILOINGSp TWO ON EITHER SIDE OF A RAIL SPUR, ON THE SIDE
OPPOSITE THE RAIL SPUR' EACH BUILDING HAS THREE DRIVE-IN BAYS.
NO SILO CONSTRUCTION OBSERVED.
25X1 D
25X1 D 25X1 D
UKMERGE MRBM COMPLEX 55-10-ON 024.39."^E
25X1 D NAC
STATUS;OPERATIONAL 25X1A
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. FOUR ERECTORSP
EIGHT OXIDIZER TRANSPORTERSp AND FOUR FUEL TRANSPORTERS WERE
VISIBLE AT BOTH LAUNCH SITES I AND 2. NO SILO CONSTRUCTION
OBSERVED.
25X1 D
OTHER RESULTS-NO APPARENT CHANGE
25X1 D 25X1 D
POSTAVY.IR/MRBM DIVISION HQ 55-Q7-M 02b-52-SE
25X1 D
NAC
A
Approved For Release 2000/04/17 :Pt IA-RDP78T04562A001^
L 292elo~ VIA
HV
?
?
J
TOP SECRET RUFF CONTROL SYSTEM ONLY
HAqq1Mv*LIAFor Release 20OV641 .RCTA I578T04562A001200010001-4
TALENT-KEYHOLE
CONTROL. SYSTEM ONLY.
TCS 20420/70 - IPIR 17 SOVIET UNION
KH*4 MISSION ii11 DEPLOYED` STRATEGIC SSM FACILITIES
STATUS;OPERATIONAL.
REMARKSS
NO SILO CONSTRUCTION OBSERVED.
25X1
POSTAVY SSM TRAINING FACILITY
25X1 NAC
STATUS:OCCUPIED
25X1D
55-07-ON D026-53-`E
25X1A
. 25X1D . 25X1D
S MRBM DIVISIO 56-0i*- N 023w17RE
25X1D
STATUS:UNKNOWN
25X1A
REMARKS:
NONE OF THE DIVISION HEADQUARTERS FACILITIES WERE VISIBLE- NO
SILO CONSTRUCTION OBSERVED IN VISIBLE PORTION OF THE SEARCH
AREA.
25X1 D
E. VIA
Approved For Release 2000/04/17: GSA-RDP78TO4562AO0120%tqot Y
HOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
e llPaor Release 2000109/1 QUA-1 78T04562A001200010001-4
LEN -KEYHOLE
CONTROL SYSTEM ONLY.
TCS 20420/10 - IPIR 17 SOVIET UNION
KH-4 MISSION 1.111 MISSILE RANGES
SIGNIFICANT RESULTS
KAPUSTIN YAR RANGEHEAD TRACKING FAC
25X1 D
25X1A
25X1 D 25X1 D
25X1 D
KAPUSTIN YAR/VLADIMIROVKA MSL TEST CTR 48-42W EN 0416-00-ME
25X1D
STATUS: OPERATIONAL
25X1A
STATUS:UNKNOWN
25X1 D 25X1 D
48?-38-ON 045-45-EE
REMARKS:
NEW PROBABLE CABLE SCARS INDICATE THE INTERFEROMETER MAY BE
UNDERGOING MODIFICATION.
REMARKS:
ALL LAUNCH COMPLEXES WERE VISIBLEo HOWEVERo LAUNCH COMPLEX 8
COULD BE IDENTIFIED ONLY. A POSSIBLE MISSILE EXERCISE WAS
OBSERVED ON LAUNCH PAD 2C-2P AND POSSIBLE VEHICLES OR PIECES OF
EQUIPMENT WERE OBSERVED IN LAUNCH AREAS 1C. 2Cr 3Cs 4C' AND 5C.
ADDITIONAL GROUND SCRAPING AND NEW EXCAVATIONS WERE OBSERVED
ON THE EAST SIDE OF SITE 5C-2p
25X1 D
OTHER RESULTS-NO APPARENT CHANGE
KAPUSTIN YAR TRACKING FACILITY
25X1 D NAC
STATUS:OPERATIONAL
25X1 D
25X1 D 25X1 D
48-33-^N 046-48-ME
25X1A
Approved For Release 2000/04/17 : CIA-RDP78TO4562A00120gg1ggi T E VIA
YHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
25X1 D
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
e #or Release 200 fT/ /' cIA-R W78T04562A001200010001-4
T ENT1?KEYHOLE
CONTROL SYSTEM ONLY
TCS 20420/70 ,. IPIR 17 SOVIET UNION
KH-4 MISSION 1111 AIR DEFENSE MISSILES
SIGNIFICANT RESULTS
25X1 D
25,1 D
CHEKHOV ABM/SPACE RADAR SITE. A 55-14 N 037-18".
25X1 D
25X1A
25X1 D
E VIA
Approved For Release 2000/04/17 : GFA-RDP78T04562A00120y 1 Q~ 1RYHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
r-KE please 2000T/8 /#7EC i -9 78T04562A001200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 < IPIR
17
SOVIET UNION
KH-4 MISSION 1111
AIR DEFENSE MISSILES
25X1 D
STATUS:UNDER CONSTRUCTION
REMARKS:
25X1 D BY f A TOTAL OF 12 PRINCIPAL STRUCTURAL MEMBERS AND AN
EQUAL NUMBER OF SUPPORT MEMBERS HAD BEEN ERECTED ON THE
NORTHERN SEGMENT OF THE ANTENNA FOUNDATION* THIS FRAMEWORK IS
6698 METERS (219 FEET) IN OVERALL LENGTH TWO STRUCTURAL
MEMBERS WERE OBSERVED ON THE GROUND AT THE SOUTHERN END OF THE
ANTENNA FOUNDATION9 THESE MEMBERS ARE 43o2 METERS (142 FEET)
IN LENGTHo THESE STRUCTURAL MEMBERS WILL. APPARENTLY FORM PART
OF THE FRAMEWORK FOR THE SOUTHERN SEGMENT OF THE ANTENNAo THE
25X1 B
25X1
NEARLY HALF OF THE ROOF ON THE CONTROL BUILDING WAS COMPLETE
EXCEPT FOR WEATHER PROOFINGo THE ROOF'HAS BEEN INSTALLED ON A
SUPPORT BUILDING IMMEDIATELY WEST OF THE CONTROL BUILDINGo A
PROBABLE STRUCTURE WAS OBSERVED UNDER CONSTRUCTION AT ONE OF
THE PREVIOUSLY REPORTED EXCAVATIONS, NW OF THE CONTROL
BUILDINGo A SMALL AMOUNT OF ADDITIONAL TREE CLEARANCE WAS NOTED
IN THE EASTERN PORTION OF THE SITE@
Approved For Release 2000/04/17 : dPA-RDP78T04562A00120PQ1 D E VIA
TtCLE RiYHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY.
H V tFor Release 20=04 F'tTA P78TO4562AO01200010001-4
TALENT-KEYHOLE
CONTROL SYSTEM ONLY
TCS 20420/70 . IPIR 17
KH-4 MISSION 1111
DOI
25X1 D I
25X1 D
25X1 D
25X1 D
25X1 D
25X1A
STATUS:OCCUPIED
REMARKS:
A SIX-POSITION SA-5 LAUNCH SITE AND A SEPARATELY SECURED SQUARE
P IR RADAR AREA HAVE BEEN Y CONSTRUCTED AT THIS SA-2 SITES
25X1D 25X1D
THE SIX LAUNCH POSITIONS, ARE REVETTED
AND HAVE BEEN CONSTRUCTED AROUND THE PERIMETER RING ROAD OF THE
iNA MRBM COMPLEX SAM SITE A18-2
NAC
STATUS:OCCUPIED
DONETSK SAM SITE B22-2
STATUS:OCCUPIED
SOVIET UNION
AIR DEFENSE MISSILES
25X1 D 25X1 D
48-54-EN 024-08-ME
25X1A
25X1 D 25X1 D
47-46 N 037--34-1
25X1A
PHYSICAL DESCRIPTION:
13 NM SW OF STALINOo
THE STAR-CONFIGURED SITE CONSISTS OF SIX REVETTED LAUNCH
POSITIONSp A REVETTED GUIDANCE AREA. . THREE REVETTED
MISSI.ENWHOLD POSITIONSo AND ONE U-SHAPED PROBABLE STORAGE
REVETMENTC THE ON-SITE SUPPORT CONSISTS OF ONE LARGE AND SIX
SMALLER BUILDINGSQ
25X1D 25X1D
GORKIY SAM SITE B18-2 56-02-MN 043-58-ME
t 1 E VIA
Approved For Release 2000/04/17 : Gib-RDP78T04562A00120 YHtDLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
HA ov*bAFor Release 200!4 1 ? CTA f'78T04562A001200010001-4
TAI. NT"KEYHOLE
CONTROL SYSTEM ONLY.
TCS 20420/70 - IPIR 17
KH-4 MISSION 1111
SOVIET. UNION
AIR DEFENSE MISSILES
SA-2 SITED THE SIX SA-5 LAUNCH POSITIONS WERE OCCUPIED. A
SQUARE PAIR RADAR WAS OBSERVED ON A MOUND IN A SEPARATELY
SECURED AREA 700 METERS (2000 FEET) SW. OF THE SITED A SECOND
SMALLER MOUND OCCUPIED BY AN UNIDENTIFIED OBJECT IS ADJACENT TO
THE SQUARE PAIR RADAR MOUND. THE ORIENTATION. OF THE SA-5 SITE
NE AT APPROXIMATELY 45 DEGREES. 25X1D
THE GUIDANCE AREA, AND AT LEAST TWO LAUNCH POSITIONS OF THE SA-2
SITE WERE POSSIBLY OCCUPIED ON THIS MISSIONS
(SEE ATTACHMENT)
25X1 D
KALININGRAD SAM COMPLEX 810'"5
25X1 D NAC
STATUS:OCCUPI
25X1 D
KIMRY SAM COMPLEX A19-5
NAC
25X1 D
STATUS:OCCUPIED
25X1 D
25X1 D 25X1 D
54-41 EN 021.00?M
25X1A
25X1 D
56s45wW 03720 D
E
25X1A
Approved For Release 2000/04/17 : t '?A-RDP78T04562A00120~ KE VIA
YHOLE
TOP SECRET RUFF CONTROL SYSTEM ONLY
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
25X1 D
Next 5 Page(s) In Document Exempt
Approved For Release 2000/04/17 : CIA-RDP78TO4562AO01200010001-4
eeI1 or. Release 2000' 8 /1 ~ -F b 18TO4562AO01200010001-4
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17 SOVIET UNION
KHU4 MISSION 1111 AIR DEFENSE MISSILES
25X1 D
MALOYAROSLAVETS SAM COMPLEX A19-5
25X1 D
STATUSOCCUPIEC
25X1 D 25X1 D
54-55-EN 03E 27' E
25X1A
REMARKS;
LIMITED CONSTRUCTION PROGRESS WAS OBSSERVED.
25X1 D
Approved For Release 2000/04/17 : A-RDP78T04562A0012y
A lpQkE VIA
TOP SECRET RUFF CONTROL SYSTEM ONLY
HIl trT ld1For Release 200 WP 4/$IFQFMf~4 WF78TO4562AO01 20001 0001-4
TA NT-KEYHOLE
CONTROL SYSTEM ONLY
25X1 D
25X1 D
TCS 20420/70 - IPIR 17 SOVIET UNION
KH-4 MISSION 1111 AIR DEFENSE MISSILES
25X1 D 25X1 D
MOSKVA ABM SUPPORT FACILITY BOROVSK 55_18-ON 036-X33-ME
25X1A
STATUS; OPERATIONAL
REMARKS:
APPROXIMATELY 33 GALOSH MISSILE CANISTERS WERE OBSERVED ON THE
EASTERN MISSILE-HOLD HARDSTAND. THE WESTERN MISSILE-HOLD
HARDSTANO CONTAINED NO MISSILE CANISTERS, TWO SMALL POSSIBLE
VEHICLES WERE OBSERVED ON THE WESTERN HARDSTAND ON 25X1D
DARK-TONED MATERIAL WAS OBSERVED ON THE SURFACE OF THREE OF THE
FOUR SEGMENTS OF THE WESTERN MISSILE'HOLD HARDSTANOQ NO
SIGNIFICANT STRUCTURAL CHANGES WERE OBSERVED INTHE OPERATIONS
AREA OR THE SUPPORT AND HOUSING AREA ,
MISSILE ORDER OF BATTLE:
33 GALOSH CANISTERS
(APPROXIMATELY)
Approved For Release 2000/04/17 19A-RDP78T04562A0012Q~r VIA
A H0LE
TOP SECRET RUFF CONTROL SYSTEM ONLY
HI Abv* 1For Release 200 04 RCTAL 78TO4562AO01200010001-4
TALENT-KEYHOLE.
CONTROL SYSTEM ONLY
TCS 20420/70 - IPIR 17 SOVIET UNION
KH-4 MISSION 11.11 AIR DEFENSE MISSILES
25X1 D 25X1 D
MOSKVA ABM TRAINING SITE D25