WONSAN ARMY BARRACKS AND HEADQUARTERS 53RD INFANTRY REGIMENT(SANITIZED)GROUND FORCE FACILITIES NORTH KOREA DECEMBER 1969

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04563A000400010092-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 8, 2006
Sequence Number: 
92
Case Number: 
Publication Date: 
December 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04563A000400010092-2.pdf988.12 KB
Body: 
Approved For Release 2006/11/09: CIA-RDP78TO4563AO00400010092-2 TOP SECRET Basic-Imagery- Interpretation Report NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER CA-07 /00f%'l /7n WONSAN ARMY BARRACKS AND HEADQUARTERS 53RD INFANTRY REGIMENT GROUND FORCE FACILITIES NORTH KOREA DECEMBER 1969 rieclass Review by NG~ COPY NO.1....16 .. Tnp CCr'DCT Approve dl For Release 2006/11/09 - CIA-RDP78T04563Ab ....... PAGES GROUP L EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION25X1 Approved For Release 2006/11/09: CIA-RDP78TO4563AO00400010092-2 Approved For Release 2006/11/09: CIA-RDP78T04563A000400010092-2 Apps oved For Release 20ff(p1Qj(, 4563A0004000100 Wonsan Army Barracks and Hq 53rd Infantry Regiment USATC. Series 200, Sheet M0380-9HL, scale 1:200,000 ABSTRACT This report is a photographic study of this ground force installation and provides the following data: A. Delineation of installation - boundaries B. Identification of functional areas C. Measurements of all buildings within the installation INTRODUCTION The following alphabetical designators are used to identify functional areas within military installations. A. Billeting area B. Vehicle storage /maintenance area C. General storage area D. Ammunition storage area E. Miscellaneous areas (hospitals, prisons, POL, personnel training facilities) F. Small-arms range G. Driver-training area H. Support area J. Tank/assault-gun range K. Automatic weapons range L. Subcaliber range M. APC range N. Combined-arms range P. Artillery training area Q. Infantry training area R. Special or unidentified area The absence of one or more alphabetical designators indicates that those functional areas were not observed at that particular installation. Lower case letters (e.g., Ba) are used to identify more than one area of a particular functional category. This report has been published as an interim Basic Imagery Interpretation Report with concurrence of the Defense Intelligence Agency. 5X1 Top urRFTF--~ 5X1 5X1 Approved For Release 2006/11/09: IA-RDP78T04563A 00400010092-2 proved For Release 2006/11/09: Cl A -P 8T04563A000400010092-2 25X1 Tf1P SFCRFT - INSTALLATION: Wonsan Army Barracks and I LOCATION: 3.7 nm northwest of Wonsan FUNCTIONAL ANALYSIS: Aa 2 barracks 1 1 "E" shaped IIq Admin bldg 3 1 "T" shaped admin bldg 4 1 heating plant 5 1 multi-wing messhall 6 2 vehicle sheds 7, S 1 guard house 9 2 support bldgs 10 11 2 quarters 3 support bldgs 1-4 9 q 53rd Infantry Regt, North Korea wing wing < ing DIMENSIONS (deters) (Feet) *Measurements are aroximate and were derived by the photo interpreter. All other measurements REQUIRE\4E SIT NPIC Project 22099OBF 'Latest imagery used in the preparation of this report. Trip cFrRFT r--] Approved For IRelease 2006/11/09: IA-RDP78T04563A0 0400 63A000400010092-2 *1 RCA-07/0063/ 1 25X FIGURE 1. WONSAN ARMY BARRACKS AND HQ 53RD INFANTRY REGIMENT, NORTH KOREA -3- TAD CcrnrT I I Approved Fo Release 2006/11/09: CIA-RDP78T04563A0 ed For Release 2006/11/09: CIA-PD TOP CFrRni Approved For Release 2006/11/09: CIA-RDP78TO4563AO00400010092-2 Approved For Release 2006/11/09: CIA-RDP78TO4563AO00400010092-2