MOSCOW EXPLOSIVES PROPELLANTS RESEARCH AND DEVELOPMENT FACILITY LYUBERTSY, STRATEGIC WEAPONS INDUSTRIAL FACILITIES, USSR,(SANITIZE

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04563A000800010010-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
10
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 6, 2005
Sequence Number: 
10
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04563A000800010010-8.pdf537.12 KB
Body: 
Approved For Release 2005/06/08 : CIA-RDP78T04563A000800010010-8TOP SECRET NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER BASIC IMAGERY INTERPRETATION REPORT MOSCOW EXPLOSIVES PROPELLANTS RESEARCH AND DEVELOPMENT FACILITY LYUBERTSY 25X1 STRATEGIC WEAPONS INDUSTRIAL FACILITIES USSR 25X1 DECLASS REVIEW by NIMA/DOD TOP SECRET5X1 RCA-09/0009/71 COPY NO 1," 3 7' PAGES GROUP I: EXCLUDED FROM AUTOMATIC DOWNGRADING AND f?fr F'For Release 2005/06/08: CIA-RDP78TO4563A00080001001ffl1 25X1 Approved For Release 2005/06/08 : CIA-RDP78TO4563A000800010010-8 Approved For Release 2005/06/08 : CIA-RDP78TO4563A000800010010-8 ved For IFQFa*E,/$ 25X1 00800010 91-09 0009/71 5X1 Moscow Explosives Propellants Research and Development Facility Lyubertsy NA 55-37-30N 037-50-30E US Air Target Chart, Series 200, Sheet 0167-5, scale 1:200,000 (SECRET) NA ABSTRACT 1. Moscow Explosives Propellants Research and Development Facility Lyubertsy consists of two major areas: an engineering and laboratory area and a possible double-base 25X1 production area. The latter area has the capability to produce and test very small rocket motors. The plant covers 60 acres and contains 45 major structures, 2. The major research effort at Moscow Explosives Propellants R&D Facility Lyubertsy is probably in the rocket motor field. This contention is substantiated by the completion in 1964 of structures which possibly house double-base rocket motor production operations and by the proximity and close functional relationship between the subject facility and Moscow Solid Motor Production Plant Lyubertsy (Moscow Solid Propellant R & D Facility Lyubertsy). 3. Moscow Explosives Propellants R&D Facility Lyubertsy may be the home of Scientific Research Institute 125, which has been reported by 0 to be in the Lyubertsy area. 25X1 25X1 4. This report is based on photography from I It 25X1 contains a photograph, a line drawing, and textual description and discussion of the facility. INTRODUCTION 5. Moscow Explosives Propellants Research and Development Facility Lyubertsy is situated on uneven terrain near the east bank of the Moscow River, 11 nautical miles (nm) southeast of the center of Moscow (Figure 1). 6. Photographic evidence suggests that a design bureau involved in solid propellant and possibly explosives research and development is located here. Scientific Research Institute 125, probably engaged in propellant and explosives R&D, has been reported in the Lyubertsy area.1 7. Moscow Explosives Propellants R&D Facility Lyubertsy is the only known facility in the Moscow area with an apparent capability of producing nitroglycerine. It is very likely that the facility supplies nitroglycerine to Moscow Solid Propellant R&D Facility Lyubertsy,2,3 which is 2 nm to the southeast. 8. Moscow Solid Propellant R&D Facility is engaged in development and prototype production of rocket motors. However, there are no buildings in this plant devoted to engineering research. This suggests that Moscow Explosives Propellants R&D Facility Lyubertsy, with an abundance of engineering space, provides the engineering R&I) work required by the Solid Propellant R&D facility. Although physically separate, the two facilities may be completely integrated. 9. The Moscow area has the largest concentration of aerospace facilities in the USSR. The Lyubertsy facility could be related to a number of these installations, including Krasnoarmeysk Solid Motor Development Facility 25X1 Approved For "Pf1/08 : CIA-RDP78T04563A00p80001 25X1 25X1 25X1 App roved FoT Ie$EER W BASIC DESCRIPTION Kaliningrad MISSILE AND SPACE DEVELOPMENT CENTER KALININGRAD 88 MOSCOW/SUPONINO Engineering and Laboratory Area 11. The functional distribution of floorspace of the engineering and laboratory area and a photographic comparison with the Central Design Bureau for Space and Intercontinental Rockets, Moscow Missile and Space Development Center Kaliningrad 88 25X1 I suggest a design and development role for the facility. Table 2 shows the floorspace distribution for structures in the area. 10. Moscow Explosives Propellants R&D Facility Lyubertsy covers approximately 60 acres and consists of 45 major structures, providing 52, 246.3 square meters (562,170 square feet) of floorspace (Figures 2 and 3 and Table 1). The facility can be divided into two main areas: an engineering and laboratory area and a possible double-base propellant production and test area. MOSCOW/SHEREMETYEVO AIRFIELD GUIDED MISSILE R&D PLANT KHIMKI 301 MOSCOW/KHIIAK AIRFIELD Krasnogorsk GUIDED' (SSILE PLANT ' TUSHINQ 82 ,1 MOSCOW/M YACHKOVO AIRFIELD 25X1 25X1 25X1 FIGURE 1. LOCATION OF MOSCOW EXPLOSIVES PROPELLANTS RESEARCH AND DEVELOPMENT FACILITY LYUBERTSY, USSR Approved F t- 1 T06/08 : CIA-RDP78TO4563A?0080001 MISSILE ANA IEACE PROPULSION DEVELOP INTER KHIMKI 456 MOSCOW!F`ILI P'*, AIRF1 Etf -Railroad, Railroad, double track I I Railroad, single track AIRQAFT EXPERIMENTAL PLANT.HIMKI 243 008000 fbOabV/0009/71 AIRFIELD CENTRAL AEROHYDRODYNAMIC GUIDED MISSILE R&D AND PRODUCTION CENTER (AERODYNAMIC) 25X1 - 25X1 Approved For Release 2005/06/08 : CIA-RDP78TO4563A000800010010-8 Approved For Release 2005/06/08 : CIA-RDP78TO4563A000800010010-8 RCA-09/0009/71 W N ~~ Rallroatl W,11 Steamllne or pipeline Barricade 2 Reaent in I Completed between Completed between II Approved For Release 2005/06/08 : CIA-RDP78TO4563AO00800010010-8 39*1 25X1 b5X1 TOP SECRk~p oved For Release 2005/06/0 Table 1. Data on Buildings and Structures at Moscow Explosives Fropellants Research and Development Facility Gyubertsy Item Description or Probable Function Storage Storage (2) Storage Ingredients preparation Ingredients preparation & storage Barricade Dimensions (meters) Length Width Height Floorspace quare Meters) (Square Feet) Date Complete Comments RCA-09/0009/71 Bldg inside barricade on first observed missing ml I still missing on photography. Processing Magazine Magazine Poss double-base mixing Poss shipping Poss finishing Finishing Puss rolling & extrusion Processing Nitration Processing Laboratory test South half of bldg complete 0 Five test bays on each side of this section. Four test hays on each side of this section. a b 31 a b C 32 33 34 35 36 a b 37 38 39 40 41 42 a b 43 44 Inert operations Support Utility Utility Utility Utility Utility Storage Utility Foundry Engineering Shop/assembly Engineering Shop Engineering Support Warehouse Warehouse Support Engineering Laboratory Engineering Laboratory Admin Admin Engineering Laboratory Storage Shop Storage Support * Approximate measurement. Three-story section. Four-story section. Four-story walkway connects this building with item 35. Two-story section. Four-story bldg. Two-story bldg. Possibly for pattern or model making. TOP SECRET Approved For Release 2005106108 : CIA-RDP78T04563A000800010010=8 Bldg was renovated by 0 Whole bldg een progressively renovated since Estimated three-story bldg. 25X1 25X1 25X1. 25X1 25X1 25X1 25X1 2551 25X1 Approved For Rel 5[a M 25X1 80001001 I&A-09/0009/71 25X1 Table 2. Engineering and Laboratory Area Floorspace Distribution. Administration Engineering Shop and metal working Shop assembly Other (storage, support, utility) 25X1 25X1 13. The possible double-base production 25X1 12. Two-thirds of the floorspace of this area is devoted to engineering. The area contains four large multistory engineering/laboratory buildings, the largest of which appeared to be externally complete in One large shop/assembly building (item 25X1 30), supported by a probable foundry i em 26) is hardware associated with the research and testing g programs. probably used to produce scale-model pPossible Double-Base Production Area 25X1 -LUCL s identified on the [Comm arison with an area of Perm Munitions and Che mical Combine K Kirov 98basis of a The identification is weakened by the lack of nitrocellulose production in e plant. owever, nitrocellulose is easily transportable and is brought in from outside sources in at least one other double-base plant (Petrokrepost Explosive and Solid Motor Plant Morozov, 14. Based on the relationship and locations of the buildings in this area, it is possible to hypothesize that double-base rocket motors might be produced in the following manner. Raw materials for nitroglycerine production, such as nitric acid, sulfuric acid, and glycerin, are supplied from other plants and stored and prepared for use in the ingredients preparation buildings (items 4 and 5). After the nitration process (items 7, 15, and 16), nitroglycerine is mixed with nitrocellulose in the possible double-base mixing building (item 10). 15. Double-base propellant then moves to the possible rolling and extrusion building (item 14), where it is extruded into grain of the proper size. Final processing of the grain and the assembling of motors is accomplished in the finishing building (item 13). 16. The collocation of engineering space and at least 18 small test bays indicates that item 18 serves as a laboratory test building. Motors of the very small size believed to be produced at this facility could be tested in this building. A motor too large to be tested in the laboratory test building could be tested at the nearby Moscow Solid Motor Production Plant Lyubertsy, which has three test cells. Chronology 17. This facility has approximately doubled in floorspace since it was first observed in 25X1 The completion of the new engineering building (item 29) by 25X1 represents an increase of over 40 percent in the available engineering floorspace. The completion between 1964 and 1968 of buildings believed to be associated with double-base propellant and rocket motor production and the close association with the solid motor production plant suggest that the major effort at the facility is in the rocket motor field. Estimated dates of completion for each building are given in Table 1. Essential Services and Security 18. A single rail spur enters the facility in the northeastern section and serves four buildings along the northern wall of the plant. Heat and power are supplied from Moscow Heat and Power Plant, Lyubertsy TETS-22 A security wall completely 25X1 circumscribes the facility. Approved !O R4L3ffRRg5/06/08 : CIA-RDP78T04563~0008 25X1 Approve I For RIQRJEG1 d MAPS OR CHARTS USATC. Series 200, Sheet 0167-5, scale 1:200,000 (SECRET) 25X1 1. NSA, "Identification of Scientific Research Institute x'125, Lyubertsy, As a Possible Munutwns Propellants Research Facility (TOP SECRET CODEWORD-- only) 25X1 25X1 25X1 25X1 2. NPIC. RCA-09/0025/69, Moscow Solid Propellant R&D Facility Lyubertsy, Feb 69 (TOP SECRET 3. NPIC. RCA-09/0001/71, Moscow Solid Motor Production Plant, Lyubertsy, Aug 70 (TOP SECRET 4. NPIC. RCA-09/0026/70, Moscow Missile and Space Development Center Kaliningrad 88, Apr 70 (TOP SECRET REQUIREMENT COMIREX BR-J/02 NPIC/IEG/MSD/DMB Project 221339 25X1 "Latest photography as of D Approved FIgt Op 25X1 80001 0 0- 09/0009/71 25X1 25X1 25X1 Approved For Release 2005/4Qft 78T04563A000800010010-8 Approved For Release 200"/0WCVfiRDP78T04563A000800010010-8