SHUANGCHENGTZU SSM TRACKING FACILITY 5 (SSM TRACKING FACILITY 5, SHUANGCHENGTZU MISSILE TEST CENTER)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04739A000100070027-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 30, 2013
Sequence Number: 
27
Case Number: 
Publication Date: 
March 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04739A000100070027-6.pdf170.7 KB
Body: 
Declassified i ? ? en Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 TOP SECRET BCA-15/0025/69, 50X1 Basic Imagery Interpretation Brief NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 50X1 SHUANGCHENG1711 SSM TRACKING FACILITY 5 (SSM TRACKING FACILITY 5, SHUANGCHENGTZU MISSILE TEST CENTER] MISSILE RANGES -- STRATEGIC SSM & SPACE FACILITIES CHINA MARCH 1969 TOP SECRET COPY Not06 2 PAGES GROUP I: EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION A Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 WARNING This document contains information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT-KEYHOLE Control System. Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 Declassified in Part- Sanitized Copy Approved forRelease2013/05/30 : CIA-RDP78T04739A000100070027-630X1 TOP 'SECRET RUFF B0A-15/0025/69 50X1 INSTA amioN OR ACTIVITY NAME Shuang-cheng-tzu SSM Tracking Facility 5 (SSM Tracking Facility 5, Shuang-cheng,tzu Missile Test Center COUNTRY CH UTM COORDINATES NA MAP REFERENCE GEOGRAPHIC COORDINATES 41-39-51N 099-57-37E CATEGORY I BE NUMBER COMIREX NO NIETB NO 50X1 SAC. USATC 200 Sheet 0287-11HL 1st ed, May 62, scale 1:200,000 (SECRET) LATEST IMAGERY USED NEGATION DATE III 'equi,ed) NA INTRODUCTION This report updates the portions of a previous NPIC report 2./ dealing with SSM Tracking Facility 5 and describes the new construction activity and significant changes at the facility from March 1967 through December 1968. SSM Tracking Facility 5 (Figures 1 and 2) was first observed on Church Door photography in January 1962 and is approximately 27 nautical miles north- west of Launch Complex A. No security measures have been Observed at the road-served facility. 51 . 15. COMPLEX COMPLEX Cl SSM LAUNCH FACILITIES COMPLEXB COMPLEXA OPERATIONAL SUPPORT 0 FACILITIES MAIN SUPPORT BASE SITE ? 13 zz z 6 zz SAM LAUNCH FACILITIES 0 r=.3 LANDING STRIP NORTH TARGET MARKER L INSTRUMENTATION PATTERN EAST Railroad Concrete road Dirt road Power/Communications line Cable scar = Support area 10 A Communications facility 0 Radar facility ? Tracking facility APEX .IVPIC M-5852 0 5 NAUTICAL MILES 5 DESERT RAIL TERMINUS FIGURE 1. SHUANGCHENGTZU MISSILE TEST CENTER, CHINA. - 1 - TOP. SECRET RUFF 50X1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 Declassified in Part- Sanitized Copy Approved forRelease2013/05/30 : CIA-RDP78T04739A000100070027-6 TOP SECRET RUFF NA-15/oue)/0 b0X1 50X1 BASIC DESCRIPTION The facility was expanded between December 1966 and May 1967 by the installation of one optical tracking device (Radar A) and the construction of 14 buildings, making a total of two optical tracking devices and 17 buildings. No activity has been Observed since May 1967. MN PRESENT PRIOR TO JAN 67 NEW CONSTRUCTION ITEM DESCRIPTION DIMENSIONS (FT) 1 Prob barracks 2 Prob barracks 3 Prob messhall 4 Poss control bldg 5 Support bldg 6a Support bldg b Portico 7a L-shaped Radar A b Assoc bldg c Assoc bldg 8a Radar A w/dome b Assoc bldg 9 Poss operations bldg 10 Equipment tower w/base ha Equipment storage bldg b Portico 12 Support shed 13 Support shed 14 Support shed 15 Prob service bldg 16 Prob bunker 17 Support bldg 18 Walled area 19 Poss bathhouse 20 Animal pen 21 Walled garden plot 22 Buried water tank *Approximate dimensions. FIGURE 2. SSM TRACKING FACILITY 5. REFERENCES MAPS OR CHARTS SAC. US Air Target Chart 200, Sheet 0287-11HL, 1st ed, May 62, scale 1:200,000 (SECRET) DOCUMENT 1. NPIC. 50X1 50X1 50X1 SSM Instrumentation Sites, Shuang-cheng-tzu 50X1 Missile Test Center, China, Jul 67 (TOP SECRET RUFF) REQUIREMENT COMIREX BR-P/003-69 NPIC Project 210317 * Latest KEYHOLE coverage of the facility. - 2 - TOP SECRET RUFF 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6 TOP SECRET TOP SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6