SHUANGCHENGTZU SSM TRACKING FACILITY 5 (SSM TRACKING FACILITY 5, SHUANGCHENGTZU MISSILE TEST CENTER)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04739A000100070027-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
May 30, 2013
Sequence Number:
27
Case Number:
Publication Date:
March 1, 1969
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 170.7 KB |
Body:
Declassified i ? ?
en Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
TOP SECRET
BCA-15/0025/69,
50X1
Basic Imagery Interpretation Brief
NATIONAL
PHOTOGRAPHIC
INTERPRETATION
CENTER
50X1
SHUANGCHENG1711 SSM TRACKING FACILITY 5
(SSM TRACKING FACILITY 5,
SHUANGCHENGTZU MISSILE TEST CENTER]
MISSILE RANGES -- STRATEGIC SSM & SPACE FACILITIES
CHINA
MARCH 1969
TOP SECRET
COPY Not06
2 PAGES
GROUP I: EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
A Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
50X1
Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
WARNING
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive Information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining to TALENT-KEYHOLE Control System.
Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
Declassified in Part- Sanitized Copy Approved forRelease2013/05/30 : CIA-RDP78T04739A000100070027-630X1
TOP 'SECRET RUFF B0A-15/0025/69
50X1
INSTA amioN OR ACTIVITY NAME
Shuang-cheng-tzu SSM Tracking Facility 5
(SSM Tracking Facility 5, Shuang-cheng,tzu Missile Test Center
COUNTRY
CH
UTM COORDINATES
NA
MAP REFERENCE
GEOGRAPHIC COORDINATES
41-39-51N 099-57-37E
CATEGORY I BE NUMBER
COMIREX NO NIETB NO
50X1
SAC. USATC 200 Sheet 0287-11HL 1st ed, May 62, scale 1:200,000 (SECRET)
LATEST IMAGERY USED
NEGATION DATE III 'equi,ed)
NA
INTRODUCTION
This report updates the portions of a previous NPIC report 2./ dealing
with SSM Tracking Facility 5 and describes the new construction activity
and significant changes at the facility from March 1967 through December 1968.
SSM Tracking Facility 5 (Figures 1 and 2) was first observed on Church
Door photography in January 1962 and is approximately 27 nautical miles north-
west of Launch Complex A. No security measures have been Observed at the
road-served facility.
51 .
15.
COMPLEX
COMPLEX Cl
SSM LAUNCH
FACILITIES
COMPLEXB
COMPLEXA
OPERATIONAL SUPPORT 0
FACILITIES
MAIN SUPPORT BASE
SITE
? 13
zz
z
6
zz
SAM LAUNCH
FACILITIES
0
r=.3
LANDING
STRIP
NORTH
TARGET
MARKER
L INSTRUMENTATION
PATTERN
EAST
Railroad
Concrete road
Dirt road
Power/Communications line
Cable scar
= Support area
10 A Communications facility
0 Radar facility
? Tracking facility
APEX
.IVPIC M-5852
0 5
NAUTICAL MILES
5
DESERT RAIL
TERMINUS
FIGURE 1. SHUANGCHENGTZU MISSILE TEST CENTER, CHINA.
- 1 -
TOP. SECRET RUFF
50X1
50X1
Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
Declassified in Part- Sanitized Copy Approved forRelease2013/05/30 : CIA-RDP78T04739A000100070027-6
TOP SECRET RUFF NA-15/oue)/0 b0X1
50X1
BASIC DESCRIPTION
The facility was expanded between December 1966 and May 1967 by the
installation of one optical tracking device (Radar A) and the construction
of 14 buildings, making a total of two optical tracking devices and 17
buildings. No activity has been Observed since May 1967.
MN PRESENT PRIOR TO
JAN 67
NEW CONSTRUCTION
ITEM
DESCRIPTION
DIMENSIONS (FT)
1 Prob barracks
2 Prob barracks
3 Prob messhall
4 Poss control bldg
5 Support bldg
6a Support bldg
b Portico
7a L-shaped Radar A
b Assoc bldg
c Assoc bldg
8a Radar A w/dome
b Assoc bldg
9 Poss operations bldg
10 Equipment tower w/base
ha Equipment storage bldg
b Portico
12 Support shed
13 Support shed
14 Support shed
15 Prob service bldg
16 Prob bunker
17 Support bldg
18 Walled area
19 Poss bathhouse
20 Animal pen
21 Walled garden plot
22 Buried water tank
*Approximate dimensions.
FIGURE 2. SSM TRACKING FACILITY 5.
REFERENCES
MAPS OR CHARTS
SAC. US Air Target Chart 200, Sheet 0287-11HL, 1st ed, May 62, scale
1:200,000 (SECRET)
DOCUMENT
1. NPIC.
50X1
50X1
50X1
SSM Instrumentation Sites, Shuang-cheng-tzu 50X1
Missile Test Center, China, Jul 67 (TOP SECRET RUFF)
REQUIREMENT
COMIREX BR-P/003-69
NPIC Project 210317
* Latest KEYHOLE coverage of the facility.
- 2 -
TOP SECRET RUFF
50X1
Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6
TOP SECRET
TOP SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/05/30: CIA-RDP78T04739A000100070027-6