KHARKOV AIRCRAFT ASSEMBLY PLANT #135
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04743A000200010007-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
April 6, 2004
Sequence Number:
7
Case Number:
Publication Date:
June 12, 1963
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 117.32 KB |
Body:
RDP78T04743A000200
?-o
25X1
5
5
5
0
1
1
1
1 wa
1---7 as Photography from
z used a base and upaatea sylusingIwztography from
Approved For Release 2004/05/05: CIA-RDP78T04743A0130200010007-5
TL
Le4 LJ
1B 111/63
12 June 1963
COW of 7
=mu= TO Caef, Itannr-Ecandade Division, ORR
ATTENTION
FROM
14
:
Declass Review by NGA7
.Chief, CIA/PID (EPIC)
BUBJECT : Kharkov Aircraft Assembly 'Plant 4135
REFERENCE Requirement No. BR/354/62
Project I.10. C 1237/62
a
1. This nemorandum is. in answer to referenced requirement cantering
Kharkov Aircraft AsseMbly Plant #135.
P., This study was combatted utilizing photography onl
The selection of for this study?was made by scree ng
available XI coverage over this installation, selecting the photography
showing the 'tangos which have occurred and still maintaining good quality
photography.
3. Kharkov Aircraft Assembly Plant #/35 is located in Kharkov, USE on
the east side of the Lopan River and appronimately 2.5 miles vs, 8f Kharkov City
Center. The coordinates are 50901'14"N/036-'15'34"E. The Aircraft Assembly
Plant is not rail served but is accessable by roads and highways. The adjacent
Kharkov Airfield North Jawed. as a flyaway field. The present production
activities are unknown and cannot be determined framavailable KH photography.
The outlined area (Enclosure #1) is the recognised limits of the Aircraft
Assembly Plant. Other buildings and facilities within the fenced area of the
airfield and assembly plant are primarily for maintenance and support. The
Aircraft Assembly Plant ,has a total estimated floorspace of a quer*
feet which is contained within storage buildings, administration buildings,
machine shops, foundry buildings, four unidentified buildings, an open storage
area, a thermal power plant, a boiler house, a sub.assembly building and a ?
final assembly building (See Enclosure #1).. All buildings in the Aircraft
Assembly Plant were included in the total estimated floorspace, only the
major buildings have been. annotated. The new addition to the machine shop
building (Annotation #21, Enclosure #1) is outlined in red and is shown on
Inset #1, Annotation #1. This building has been enlarged froml
to 470' X 3504, giving this building a new estimate of 164,500 square feet.
The previous estimate for this building was 67,510 square feet.
7p-)
h -
Approved For Release 2004/05/05 : CIA-
0100
EXeudL:
7_k,n r.
25X
25X'
25X1
25X1
25X1
Approved For Reiiete 2004/05/05 : CJA-RDP78T04713A604200010007-5
Li
StILTECTs itharkov Aircraft Assembly Plant #135
4. The photo analyst on this croiect is
who may be contacted on 8hould you have further g,uestions
regardina this project.
=LOME:
CIA/PIM/IB.P.160/63
Approved For Release '.0-,04/06/051431A
-RDP78T04743A00
0
1,
7-7,17-777-1-7'... 1
Ex,I..Ide.i ;,,a ?::?Ilzi7,:1Z,..
tspnlrai..!;.; add
020001000 - d"I'...5.?.;.s.L?'ar" -
25X1
25X
25X1
25X1