SHEN-YANG AIRCRAFT ENGINE PLANT #410

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04743A000300010012-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
12
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 1, 2004
Sequence Number: 
12
Case Number: 
Publication Date: 
May 24, 1963
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78T04743A000300010012-8.pdf1.17 MB
Body: 
Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 1. a 3, is in answer to referenced requirement concerning -Tang Airerstt E C.ne P!La + 2. its l rns two-areas: Yan one the main plant of Shen- y 90th and ysag AILror ft Ugh plant `AS a des #410. The following for each area PCiaa Of each Plant area and a list of annotations Tla~se 1 tjM* are keyed to photo enlargements Enclosures #1 and 3. Shenk-Tan She-Tang Arsensl is1o ed in 4.1- Coordinates 41?47?27",, 12 seven 3029030*B,, 0 The axsenal is served by a rail line and purs. The entire arsenal area is enclosed by a masonry wall aPProxiaaately eight feet high and all entrances ' appear to be well secured. The total estimated floorspace is 3,110,045 square feet which is contained within aseeMbIT buildings,mchine shops, workshops, administration buildings, boiler houses, test ilities, warehouses and storage buildings. All buildings in the r inalvtded in the total estimated floors buildi~ags hav been aam~crteted. pace but only major 5X1 photographs, was reviewed and cc+^~arisoar~ aM 'r pbctograp ? This complete rebab~i2ltation of the entire arsenal. further cother comer copa arison shows a was conducted bed 19 photo h grap y This c s a+ sled the construction of new builds of some older 1 ngs and the modification Thum cha n e s g s are indicated bor the red stars Eucloaure Ak ') . J-lLditio> 5X 1 changes occurred between tionc These changes were the construction of a new Enclosure *41 and Annotation #1 Enclosure #2) and Declass Review by NGA. TOP SECRET Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 building was approximately 90 pert t complete on unidentified engine. 0onstruction~started possibly in early 1961 and the IB 92/6-3- Page 2 and the partial completion of two wings on the engine test building at Annotation A. The unusual features at this plant are located at Annotation A, Annotation B, Annotation #89 (Enclosure #1) and Annotation #1 (Enclosure #2). The following is a description of each of the aforementioned'annotations.. Annotation A; this building has been identified as a test facility for an 25X1 The building miulti-winged with the base wing measuring 1470' x 65'?. There are seven projecting wings, two of which are under construction and measure 85' x 30' and are, probably single test bays, one measures 150' x 25' and is probably a single test bay and four measure 150', x 55', three are probably double test bays and the fourth a single test bay with an additional servicing area. The seven wings are served by individual exhaust towers approximately 65 to 75 feet above ground level. Annotation B; this area consist 'of three buildings one large and two smaller buildings. The large building was a former thermal electric power plant,. 25X1 which has bem -Rd sincel _J to house three engine test cells. The two smaller buildings are new since 195b but are prior to one building hon ss a large teat cell an4. the other is an unidentified building. Me thno buildings are connected by pipeline. Annotation #89; the function of this building is It is adjacent to the transformer yard (Annotatticm #9) but separated am additional fence. The buildi appears to ba-ve 'u , modified between. w25X1 The measukaomts are 125' x 50' and the roof has two levels with the south section being approximately 50 to 55 feet tall. This tall section is rail served. Annotation #1 (Enclosure #2) This is a new and its function is mnkwm. The foundation was started on ;25X1 I I and a leted on Annotation #56). The building ;25X1 was tom: ed on `25X1 #88 (Enclosure #1) shams four unidentified objects mounted on rail flatcars. These objects are qppraiinstoly all have the same The building measures approximately 150' x 75' and is approximately 60 to 70 feet tall. Annotation Vs. configuration. onatograAWF shows five unidentified objects approximate trailer is canvas wmvd and has an irregular sha , measurements are anoatatioa OW object located approximately 200 feet south of the other + f o u r aloft t z %&tw*m rail sus appears to be mounted on a trailer,' possibly a list W t3pm and Is eovmcted to an unidentified prime mover. The an flatcars y one has tber"saga configuration as the four located at (* atatian 01, MMR .osu .% , In. the same general area, these are not mounted pproved or Release 2004/07/29 : CIA-RDP78T04743A000300010012-8 .1. 'Assembly building 2: Assembly building 3. Assembly building 4. Assembly building 5. Assembly building 6. Assembly building 7. Assembly. building 8. Assembly building 9. Workshop 10. Workshop and storage yard 11. Possible forge or smelter 12. 13. 14. 15 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29- 30. 31. 32. 33- 34. 36. 37. 38. 39.. 40. 41. 42. 43. 44. 45. Workshop Administration building Workshop and machine a machine dwp- and machine sbv Machine abop Machine shy Machine shop machine, --hop Storage bu.41ding Machine shop Machine shop Storage building Storage building Machine shop Storage building Storage building U/I.building U/I building Workabop Storage p d1ding x 130 x 115' 305' x 115' - 270' x 130' 240' x 50' 320' x 95' ; 85' x 8o' 310' x 60' - 70' x 25' - 70! x 25' 210' x 175' 210' x 75' 215' x 135' 320' x 135' 320' x 150' 215' x 150' 240' x 135' 175' x 85' 240' x 150' 240' x 135' 345' x 135' 160' x 90' 31o' 'x 80' 150' x 120' 140' x 120' 145' x 105' 160 240' 220' 205' Work" 205' Macshop 220' Possible forge 240' A tsaation bulldlAg 150' Wo 200' Boils' house ana. c - le 120' Machos shop shop e administratic 170' 160' x 65' x 65' x 75' x 125 x 65' x 150' x 85' x 35' x 85' x 95' x 50 Adiinistration and b ratory buildings TOP S1 IR-92[63 665' x 490' 665' x 275' 360' x 330' 400' x 225' 425' x 250' 330' x 260' 570' x 250' Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 46. 47. 1+8. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63. 64. 65. 66. 67. 68. 69. 70. 71. 73. 714. 76.11 77. 78. 79. 8o. 81. 83. 84. 85. 86. 87. 88. 89. 90. Five unidentified service buildings Administration building 95' x 55` Administration and security building 370' x 40' Motor vehicle storage and repair shed 200' x 70' Fifteen fenced storage buildings 70' x 15' each Storage building Power Plant and coal stockpile 175.' x 150' Workshop 135+ x 50' Workshop 225' x 105' Workshop 340' x 105' Foundation for new building Storage building 2100' x 40, Storage buildings Storage buildings Security buildings and guard quarters Workshop and Machine shop 195' x 130' - 150' x 75' Gantry cream Storage building 135' x 40' Storage buildings Storage building 2.255 x 40' Underground P0Z reservoir, and control station Three warehouses Unidentified -building, within a secured area Two large and twos small Two workshops Maintance shops and storage buildins Warehouse 350' x 80' Storage building 65' x 3Q' Two large warehouses Five warehouses Six storage sheds and two large warehouses Two warehouses and four storage sheds Two warehouses and one unidentified building Pour warehouses Open storage yard and two gantry, cranon Gantry cram and possible shipping and receiving building i ve waifs r Pour warehouses Administration and six unidentified service buildings Three water reservoirs Administration building and storage buildings Pour unidentified objects on flatcars Possible test building Transformer yard TOP S T Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 1. New building, function unknown 101 x 75' roximately 60-70 25X1 feet tall. Erected between Foundation started 25X1 2. ent fied objects, one the same as shown on 3. 'Engine test building, two wings partially completed between 25X1 Construction started possibl in e l 1 6 y ar y 9 1. 4? rmeag rsral eleatr,c power plant converted to test cell building prior to 1961 and after 1956. Shn-Ya 41rcrat't BOOM Plant is located in the Ta Tung ward of Shen-Yang adjacent :o Sh90th and Shen-Yang Airfield Southeast. The coordinates are 41047-2141M 30'2"E'. The plant area is enclosed by a 25X1 masonry wall approximately The Engine Plant is served by the sane rail line which serves the =Wmal. This study was conducted from the same photography utilized in the stay of ghee-Y Arsenal. The Engine Plant has a total estimated floor space Of 955, 175 square feet. All buildings were included in the total estimated floor space, only the major buildings have been annotated, This plant Was rehabilitated between 1945 and 1956. A co ison between 19% photos and far- shows the construction of th bAildIx" ree new buildings which are I sated by the red stars (Enclosure #1). The located s #1. and #3 were constructed prior to was under plant located at annotation 25 25X1 on The purer and was about 50 percent complete the final plant is shown on and is in steps of i ? The Engine test ng a Annotation D contains` six test cells, The_ test call on ~& rAnr+h^32? end of the building 25X1 is undergoing This photography shows what appears to be ? ssible cleared blast area, in the rear of the test cell mentiowd above (Annotation #5 Enclosure #2). This construction and modifi ti ca on eetivi Jonas in an early stage on KEY TO A N N O T A T I O N S - Y A N G A E . 90th ENCLOSURE #2 IB 92/63 Page 5 4xcwo I cor.v Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 IB 92/63 Page 6 1. Storage building 250' x 110' 2. Workshop and storage 360' x 185' 3. Storage building 180' x 70' 4. Assembly and machine shop 325' x 200' 5. Machine shop and workshop 170' x 145' 6. Foundry 185' x 185' 7. Boiler house 135' x 55' 8. Administration building 265' x 65' 9. Storage building 180' x 45' 10.. Assembly building 530' x 220' U. Assembly and Machine shop 580' x 170' 12. Assembly building 300' x 160' 13. Workshops 170' x 115' 14. Store" buildings 8o' x 60' - 70' x 55' 15. building 250' x 170' 16. Storage building 200' x 45' 37. Administration 230' x 55' - 200' x 40' - 100' x40' 1001' x 40' 18. Sams. shy 100' x 30' 19. Storms building 150' x 55' 20. Administration building 75' x 75' 21. Storage but tng 22 . Adaini.stration build a 23. Administration buildings 24. Two warehouses 25. Power plant under 26. .Pour warehouses 27. Machine shop 165' x 110' 28. Workshop 230' x 100' 29. Workshop 135' x 135' 30. Storage building 100' x 35' 31. Storage building 85' x 40' 32. w4rabous 150' x 45' 33. P L reeserroir, pumping and control 2hre*-l*W i robooses and two storage sheds. Boiler fia~ee 130' x 50' Test 0e11 building ?Additio Administration area Bben-Tanilt Airfield southeast and TOP CRS ? E?~ 6::1: N~ ~.~.Y.-~.vf opy ~___ i cxamo Approved For Release 2004/07/29 : CIA-RDP78T04743A000300010012-8 ;25X1 25X1 25X1 IB 92/63 Page 7 KEY T O A m o u r T O I : S - XIM1711 PLANT ENCLOSURE J2 5. Test cell .building - one test cell modified and a possible blast area constructed bgtween 6. Power plant - construction began oi~ approximately 50 percent complete ono and is nearing completion on 7. Dismantled Mig-19 and Shen-Yang Airfield Southeast repair facilities. 5. Summary Shen-Yang Aircraft Engine plant #410 and Shen-Yang Arsenal 90th are definitly interrelated in their productiou.a.etivities. A more complete evaluation of production activities at these two plants cannot be determined from present photography. Additionalaphotographic coverage would be needed for a complete analysis of the engine test facilities. The arsenal may still be engaged in the production of armament. The aircraft engine plant may or may not be'producing aircraft engines as a primary product. Airframe production is possible but doubtful since the entrances of the final assembly sections on the assembly buildings are not wide enough to accommodate an assembled aircraft. Aircraft repair is probably undertaken at the facilities of the adjacent Shen- Yang Airfield Southeast, (see tion p Enclosure #1 and Annotation #7 ~ ~ Enclosure #2). Each of salons used in this study shows a notable increase in overall activity s 1 h plants. 7. The photo st cos this project is who may be ould you have further questions regarding this 5X1 contacted on extension F irl?.,ar i Exctudee L?aa sctawtlc deve3ndiod-tot dac:assrncttN* Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 i Y=I ea : v n_ L Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 1. 6 fl vetted Ctcr,, ~ r ;r r~vcttcd Ctor.-,-' Ft 1''n^ 3. t.'aancauce 4. 3 R;vottcd Prac.r: Sr- #.Sl:r 7. Arl=inictrticn G. Proccc-,in^, r . 2 I ob ]. -.y ....... . 0. A:.cch1y-tyn:~ 9 ? Y. ,Uch~a_o 10. F:axvhoaze U. icct R=-- 12. 4 13occcoin^, fai1cunv.: 13. 2 R vetted 0tor.`.yo Cailui,;T 14. 2 t:.irhoaxt i i:.ut;hc?.c:c PrJL:,P1o t t r.i: tr..ticn raildlq, Ciar?o 1?`iildi~ .. .l Li with 10 rxcceccirz ca rallalrz ~' ^C: P,a11di A_Iri:-trticn #11d1,:; U:-L a:.:tificd Ctractum Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 I 1? i'cro Lmidcntifscd c^.iildiq;a 2. C"ra*o'i-ec znd nd=laictr3tiea 3. Prcc;tzin? ruldin~ `+. Pror,ccir '3 ri11ain3 5. P~11cr F,o G. Unidentified raildlnn 7. Pr_ec;ciq; r111dx Processing Euildin6 Warehouse Unidentified Building T,o Warehouses Rwvetted StornCe Building, E vetted Processi47 Buildjr Eevetted Processing Building Eevctted St,-,,U, Building Approved For Release 2004/07/29 : CIA-RDP78TO4743A000300010012-8 A. LIT=OR 1. Prob. prcciplt tioa tld . 2. Prob. finlchi, bld^c. 3. I'rcec:zin_- bli~:c. 4. Ctor c bld^.e. 5. F:e: ig bli . C. proc:ecir:: bldC3. ... 1:'vctted :tor-?.^o bld.. :-:11 r1::cl. bldro. 1. 2 1.t1i . csx4_cr:... pp n Ltcr.sc rrrsc 2. 3 . Ct rcuc ~ ll bldg . 1. I..achinc chops 2. roundriec 3., Prob. foundries 4. Unidentified buildin,^, 5. Adnin. bldg. 6. Boiler houses Cz erouo uirchoucco, en support buildin^p Processing bldgo. Storage bldgo. Unidentified bldgs. Boiler house Craters at foz r bldg. sites E. BOOSTER IQADICO SCCPIQZ 1. Large procesoir3 bldro 2. Revetted otoro?c bld;a scull niscl. bldgs. D. UDIDEDTIPTED PRO=SILO SELT] 1. Aoseobly-type bldg. 2. Processing bldgo. 3. Boiler house 4. Unidentified toll bldg. 5. Buried reservoirs H. LIQUID HACTILI ..G SECTIO..7 1. Tank (2nd addel by 1963) 2. Loading/unloadirx,3 bldg. 3. Boiler house 4. Took care T. P.OOD AID LIP. MR SECTI07 1. Open atorago of loZa 2. SaLmill 3. Luber otor{;a 4. Boiler hsaco y