ORR - HTA REQUIREMENT RE RUMANIA BRASOV PETROLEUM REFINERY - OPPOSITE THE MAIN BRASOY RR STATION/ BOUNDED ON E BY MACHINE TOOL PLANT.

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04753A000100090004-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 2, 2001
Sequence Number: 
4
Case Number: 
Publication Date: 
September 14, 1956
Content Type: 
REQ
File: 
AttachmentSize
PDF icon CIA-RDP78T04753A000100090004-0.pdf54.28 KB
Body: 
Approved For Release 2001/08/13: CIlj O"~4 [ 0%4p 04-0 U"UitL September 1956 Gov Petroleum Refinery .. Opposite the mein ov 251 45388-253?E Materials petroleum /897156 Lubricating oil plant located here during WU. Report the location, sizes, and identification of the following types of equipment tin a sketch) installed at this plants 1 Shell stills and furnaces 2 Atmospheric stills 3 Vacuum stills Lubricating oil treating inatailationsi a Devaxing b Solvent treating 5 St ge tanks f Power plant and iroilerhouse Any evidence of new construction or plant expansion? (For typical photos of some of this equipment, see Air Pores Manual, t 200-18, 1 Nov. 1955 Intelligence Collection ftidance Manual, Fuels,LLuubricantsand Rocket ftoopela tss, pp 21-72, Confidential)- DECLASS REVIEW by NIMA/DOD Approv r I U CLASS. CHANGED TO: TS Q C NEXT REVIEW DATE: AUTH: HR 70 N DATE: 2" ga_ REVIEWER: ez"s DOCUMENT NO. ____ NO CHANGE IN CLASS. ^ F 1 DECLASSIFIED 0 `7, 5 L,