NEW CONSTRUCTION AT THE YUNG-TING MACHINERY PLANT (618 FACTORY) CHANG-HSIN-TIEN, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04759A000800010026-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
11
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 12, 2003
Sequence Number: 
26
Case Number: 
Publication Date: 
April 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04759A000800010026-1.pdf1.14 MB
Body: 
n .......,..a C- In-1---- nnneinnwwnrrnrmrRrYViernennnnnonnnnnnc Copy C 9 Pages April 1965 NEW CONSTRUCTION AT THE YUNG-TING MACHINERY PLANT (618 FACTORY) CHANG-HSIN-TIEN, CHINA Declass Review by NIMA / Approved For Release 2005/ 25X 25X s AgLII1IVVAL RECORD PLEASTE USX ~ ohs 41 ~ UUiIUU6l ?' 5X 1 2 25X1 0026-1 NEW CONSTRUCTION AT THE YUNG-TING MACHINERY PLANT (618 FACTORY) CHANG-HSIN-TIEN, CHINA 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A A previously observed but hitherto uniden- tified installation located 1 nautical mile west- southwest of Chang-hsin-tien, China, and ad- jacent to the Peiping 1st Armored School, is identified as the Yung-ting Machinery Plant. This plant, which has the code designation 618 Factory, probably produces and/or repairs tracked armored vehicles and farm tractors; however, its proximity to the Peiping Rocket Engine Test Facility and the presence of anew- ly constructed section of the plant containing a large fabrication/assembly-type building sug- gest that the plant may be associated with the Chinese missile program. The Yung-ting Machinery Plant is located at 39-49N 116-10E (Figure 1), approximately 1 nautical mile (nm) southwest of the town of Chang-hsin-tien, China, and approximately 1.5 nm east of the Peiping Rocket Engine Test Fa- cility, Chang-hsin-tien I The city of Peiping is approximately 9 nm Mort - east of the plant. Nearby installations (I igure 2) include the Peiping 1st Armored School, Chang-hsin-tien Petroleum Product Storage, Kang Wa the Chang-hsin-tien Locomotive and Rolling Stock Plant the Military Barracks Area, Nan-ying; t i - itary Barracks and Depot, Chang-hsin-lien; a probable armored school; and 2 driver-training and vehicle test tracks. Also in the ar(?a is a reservoir which occupies a portion of the site of the abandoned Chang-hsin-tien Ammunition Depoti An analysis of numerous collateral reports shows that the Yung-ting Machinery Plant is al- so known by the Chinese under the code designa- tion 618 Factory and is located south of Chang- hsin-tien near an armored school and tank train- ing area. The plant was formerly associat.~d with the Chang-hsin-tien Locomotive and lolling Stock Plant which continues to manufactur_~ loco- motives. The Yung-ting Machinery Plant is re- ported to repair armored vehicles and tanks, in- cluding the Soviet T-34, and to produce farm tractors. 25X1 25X1 25X1 25X1 The Yung-ting Machinery Plant is .livided into 2 separately secured adjacent sections. The 25X1 Approved For Release 2005/02/10 : CIA- R78T04759 010 TOP SECRET 25X1 95X1 Approved TOP SE W MAIL, cpwqfmm~r FIGURE 2. INSTALLATIONS IN THE VICINITY OF CHANG-HSIN-TIEN, CHINAI Approved For Release 2005/02/10 : C TOP SECRET 4LITAR LEA fez 25X1 D 080001 25X1 25X1 25X1 25X1 2 Approved For TOP SECRET older of the sections is adjacent to the northwest side of the Peiping 1st Armored School, Chang- hsin-tien (Figures 2, 3, and 4), and the newer section is immediately north-northwest of the older section. A narrow strip between the sec- tions contains a diverted stream or ditch and also a road which connects a separately secured section of the 1st Armored School west of the the plant with a driver-training and vehicle test track east of the plant (Figure 4). The Chang-hsin-tien Locomotive and Rolling Stock Plant is immediately east of the test track, and on the western side of this plant (adjacent to the test track) is located an area of recent plant expansion (Figure 4). The site occupied by the older section of the Yung-ting Machinery Plant was a barracks and storage area when observed~ubsequent- ly, the barracks and storage facilities were re- moved, and the older section of the machinery plant which was built on the site has shown al- most no change since first observedi One small support building was constructs I and another was still under con- struction he layout of the area and dimensions of the major buildings are shown on Figure 4. The main production and/or repair facilities probably consist of 6 monitor-roofed shop buildings in the northern end of the section (Figure 3). Two of these buildings (items 7 and 8, Figure 4) are near a rail spur serving 4 on/ off loading and storage buildings. Arail-served steamplant is in the northernmost corner of the older section, and an apparently older heat and powerplant is in the western part of the section. Small support and storage buildings and ahous- ing and support area occupy the remainder of this older section. I 25X1 The L-Jphotography to reveal activity 25X1 D the site of the newer section of the Yurg-ting Machinery Plant was obtained he25X1 D only ground scarring and 1 building item 3, Figure 4) in an early stage of construction were seen. The only previous photography w is ob- tained~and showed no activit at th;, sit95X1 D Although photography Is 25X1 D poor quality, the 3 main buildings of thc_? plant (items 2, 3, and 4) appeared complete, but con- tinued ground scarring indicated that the newer section of the plant was not operational it that time. lie newer section cortaine25X1 D 1 large multi ay, monitor-roofed fabrication/ assembly building (item 2) with an adjacent smokestack, 1 support building composed of 2 adjoining gable-roofed structures (item 3), 1 shop building having a single roof monitor (item 4), and 1 small 2-level structure (item 6). The probable transformer house (item 1) at the site of the future substation in the torth- west extremity of the newer section appeared to be in the early stages of construction. No security was visible, and temporary , ccess roads converged from several directions. showe25X1 D ditches for steamlines extending from a nearby steamplant in the older section of the plant to the new plant buildings. These ditches were later filled and are no longer visible 2X1 D F7 the substation had been separately se-uredc5X1 D and a powerline was visible leading from Y he di- rection of the large thermal powerplant at the Peiping Rocket Engine Test Facility. Portions of a security wall had been erected around the plant, an interior road network was forming, and a small building appeared just east of thi, shop building. Photography showed con25X1 D 25X1 Approved For Release 2005/02/10: CIA-R 001 TOP SECRET I "I 5X1 25X1 Approved For Release 2005/02/10 : CIA-RDP78TO4759A000800010026-1 Approved For Release 2005/02/10 : CIA-RDP78TO4759A000800010026-1 25X1 D Railroad, double track Railroad, single track Road Track Wall Powerl ine Built up area Stack Tank TOP SECRET (618 FACTORY) ITEM LENGTH WIDTH (FT) (FT) COVERAGE (SQ FT) 1 100 x 70* 5,500 2 575 x 465 x 30h 267,375 3 215 x 95 20,425 4 340 x 155 x 20h 52,700 5 100 x 80 8,000 6 120 x 45* 5,000 7 440 x 140 61,600 8 180 x 70 x 30h 12,600 9 385 x 220*x 30h 60?000 *overall -5- Approved For Release 2005/02/10 : CIA- 01 TOP SECRET M1 25X1 25X1 TOP SECRE APPFUVUCI elease 2005/ pletion of 1 small support building (item 5) on the east side of the 2-level structure (item 6), and a small support building on the west side of the 2-level structure. plete I and is probably an indi- cation of full operational capability. An area of continuing activity was observed just east oft[ e support building (item 3). The newly constructed section of the Yung- ting Machinery Plant appears to be directly as- sociated with the older section of the plant; how- ever, the fact that it is separately secured could be an indication of a function different from that of the older plant. the security wa.11 was completed, the newer plant section appeared to be generally in a more finished state and was observed to be approximately 1,600 feet long and 1,100 feet wide. Photography Bowe ve is track activity in t e open area within the security wall and 2 rows of vehicles parked near the fabrication/ assembly building. The bridge for the main access road was observed to be com- 1IC J-9291 (4/651 FIGURE 5. VIEW OF THE VEHICLE SHEDS AT THE SEPA- RATELY SECURED SECTION OF THE PEIPING 1ST ARMORED SCHOOL, CHANG-HSIN-TIEN, CHINA, The main section of the 1st Armored School contains a large administration building, nume ous classrooms, barracks, support, and mes- ing buildings, and a firing range. A separately secured section approximately 1,500 feet to the northwest (immediately west of the Yung-tiiig Machinery Plant) contains 6 vehicle sheds, a small heat plant, a messhall, and other person- nel and vehicle support buildings 11 F igg- ures 5 and 6 are ground views of these sane areas showing t 4e vehicle sheds with the doors open and 1 T-34 tank, 1 JS-1/2 tank, and 3 SP guns parked near the test track. Since photography l track activity -C 1-9292 (F651 FIGURE 6. VIEW OF ARMORED VEHICLES AT THE PEIPING 1ST ARMORED SCHOOL, CHANG-HSIN-TIEN, CHINA, D Approved For Release 2005/02/10 : Cl - 0001 TOP SECRET 25X1 25X1 25X1 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25)1 Approved on Release 25/22C has been continuously observed leading from the separately secured section of the 1st Armored School to the nearby driver-training and vehicle test track and within the test track itself. CHANG-HSIN-TIEN LOCOMOTIVE AND ROLLING STOCK PLANT The Locomotive and Rolling Stock Plant has shown little change xcept for an area LL of expansion on its southeast corner where a large probable rolling stock production or repair building (item 9, Figure 4) and a steamplant were under construction IThe area immediately surrounding these buildings ap- peared scarred and probably contained con- struction materials Iwhen photography reveale an extension of the secu- rity wall enclosing the area of expansion and also showed well-defined service roads. The Yung-ting Machinery Plant has received an addition of more than 350,000 square feet of roof cover in the separately secured newer sec- tion of the plant his section 25X1 probably became fully operational) X1 D )though individual buildings were com25X1 D E D p eted earlier. A possible tank/SP gun and rows of vehicles have been observed within the plant which is adjacent to an armored school and a vehicle test track. This evidence, togetherwith collateral reports indicating that the plane pro- duces farm tractors and repairs tanks and ar- mored vehicles, supports the conclusion that the Yung-ting Machinery Plant probably produces and/or repairs tracked armored vehicles and farm tractors. The Peiping Rocket Engine Test Facility is located 1.5 nm west of the Yung-tint. Ma- chinery Plant. The test facility contains stands and support buildings for testing large rocket engines; however, an extensive related mis- sile production installation has not been posi- tively identified. The construction of a large fabrication/assembly building in the newer sec- tion of the Yung-ting Machinery Plant during the same time span as the construction of the Peiping Rocket Engine Test Facility suggests a possible association of the Yung-ting Ma- chinery Plant with the Chinese missile pro,,,rram. 25X1 Approved For Release 2005/02/10 : CIA- q TOP SECRET 25X1 25X1 25X1 25X1 D 25X1 D 25X1 C 25X1 25X1 C Release 2005/0 25X1 25X1 25X1 Approved For Release 2005/02/10 : CIA-RDP78T04759A00 080001 TOP SECRET 25X1 25X1 25X1 25X1 25X1 1 25X1 Approved For 4. Air. IR 1121189, ((1)C,hrnaii-Ilsien.-Tien Tank Repair Works, 7 Jun 60 (SECRET) 25X1 C 25X1 25X1 25X1 25X1 C 25X1 C 25X1 25X1 25X1A 7. Army. 0:340/61, Common/ut Chinese Industrial Plants, III: Engineering Products 1, 27 Jan 61 (UNCLASSIFI!F:D) S. 1'a h'uny Pao, Peiping, "Yung-tiny 'tiachinerv Plant," 1). 2, 24 Oct 62 (UNCLAS SIFIED) 9. NSA. 2X,'Q'CCY/T58-(i4 , P(, icI) ing 1118 I actor/ 11/or ate s Machinery to \ 010 /1110/ 9?4 Factory, I8 Feb 6 1 TOP SECRET 10. NSA. 2X,'O/ CCY/R32-6-1, Fifth. Ministry of Machine Industry Controls the Armored Vehicle Industry, 23 Sop X54 1 1 . NSA. IX, 'O/ CCY,'T126-63 Identification. of 0'18 Factor?/, Ch'anghsintien, a,s' the Youytiny liachine_ry Fac to r 26 Mar 63 (SI CRE'III 11. DOD, 500th INTC GI). Rpt. No 3566,'63 (CIA :9659167 C /Old Vehicle Repair and Filling Plant, S Nov 6 (CONh'IDENTIAh I 25X1 25X1 NPIC. R-111'6;), Installations in the Vicinit', of the Missile and Propulsion 1'est Comple;r Wear Peiping, China, Jul 63 25X1 (TOP SECRET Arni}. PIR-TK-63, Ch'a-ng-lisin-Tien Missile Research Center, Ch'any-11sin-Tien, Ckina, Oct 63 (TOP SECRET Approved For Release 2005/02/10 : CIA- 01 TOP SECRET II 25X1 25X1 X1 25X1 Approved For Release 2005/02/10 : CIA-RDP78TO4759A000800010026-1 Approved For Release 2005/02/10 : CIA-RDP78TO4759A000800010026-1