SOVIET MILITARY ORDER OF BATTLE MOSCOW MD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A001200010044-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
August 22, 2001
Sequence Number:
44
Case Number:
Publication Date:
June 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 416.3 KB |
Body:
Approved For Release 20011)aFb7S ADT'78T04759A001200010044-6
Copy 82 TC5,80650/65
6 Pages June 1965
PHOTOGRAPHIC INTERPRETATION REPORT
SOVIET MILITARY ORDER OF BATTLE
MOSCOW MD
Handle Via TALENT - KEYHOLE Control Only
This document contains classified information affecting the national security of the United States within the
meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission
or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to
receive TALENT-KEYHOLE information. Its security must be maintained in accordance with KEYHOLE and
TALENT regulations.
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
T001/09/07: CIA-RD P78T04759A001200010044-6
eclass Revi ' e'llfl' RYEM[3 001/0TC~P SECRET
HandleAPproved For Release 2001/907 :`CAA`-4T8%J ff9A001200010044-6
TALENT-KEYHOLE
Control System Only
This report is one in a series on Soviet Ground Force and Logistic
installations being prepared for a DIA/CIA Panel. The series is being
coordinated, published and disseminated by NPIC. The photographic
analysis is being performed by the NPIC Photographic Analysis Group,
the CIA Photographic Intelligence Division (NPIC), and the Production
Center 1Pla (DIA). The photographic analysis for this particular re-
port was performed by the NPIC Photographic Analysis Group.
In the interest of uniformity, the titles and letter designators for
the facilities observed at these installations are identical with those
appearing in the project requirement. When a specific facility is not
observed both its title and letter designator are omitted in the report.
Titles and letter designators for the various facilities are as
follows: (A) railroad service, (B) road service, (C) landing strips,
(D) administrative and troop housing areas, (E) storage areas, (F) am-
munition storage areas, (G) PO1. storage areas, (H) other buildings and
facilities, (J) equipment storage/maintenance areas, (IC) athletic fields,
(L) small arms firing ranges, (M) driver training areas, (N) tank/
assault gun firing ranges, (P) flat trajectory firingranges, (Q) artillery
emplacements (batteries), (R) infantry or combined arms field train-
ing area or courses, (S) special training facilities, (T) unidentified
facilities or tracking activity.
Approved For Release 2001/09/07 : CIA-RDP78T04759A001200010044- ALENT-KEYHOLE
TOP SECRET RUFF
Handle Approved For Release 211(/09/OF-`CPRDP7`8T04759A001200010044-6
TALENT-KEYHOLE
Control System Only
BUY AMMUNITION DEPOT NO 50
(58-26N 041-33E)
BUY, KOSTROMSKAYA OBLAST, USSR
MOSCOW MD
Handle Via
-KEYHOLE
Approved For Release 2001/09/07 : CIA-RDP78TO4759AO01200010044-6ConTALEtroi l System Only
nly
TOP SECRET RUFF
TOP SECRET RUFF
Hand lA~ pproved For Release 2001/09/07 :CIA-RDP78T04759A001200010044-6
TALENT_
KYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Approved For Release 2001/09/07 : CIA-RDP78TO4759AO01200010044-6 Control System Only
TOP SECRET RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
Approved For ReleaseS2 0S/03/07 RCIA fRDP78T04759A001200010044-6
Buy Ammunition Depot No 50 is located
approximately 3.5 kilometers (km) from the
center of Buy (Figure 1).
The depot is comprised of a storage and
support area and covers approximately 1,000
acres. The storage area contains 64 ammunition
storage buildings, 3 possible ammunition storage
buildings, 1 possible ammunition storage build-
ing under construction, and 5 support buildings.
The support area contains 1 administration
building, 3 multistory barracks, 29 support
buildings, and an athletic field (Figures 2 and 3).
KEY-
Comparative analysis reveals no
change in faci itics and a light level of activity.
Railroad Service
A rail spur enters from Buy and splits into
5 sidings inside the installation.
An all-weather road from Buy serves the
installation.
Administration and Troop Housing Arc>a
Area D contains 1 administration building,
3 multistory barracks, and 29 support buildings.
Ammunition Storage Areas
Area F1 contains 64 ammunition storage
buildings, I possible ammunition storage
building under construction, and 5 support build-
ings.
Area F2 contains 3 possible ammunition
storage buildings.
POL Storage Area
Eight medium POL tanks are located at
58-27N 041-42E.
Handle Via
ly
Approved For Release 2001/09/07: CIA-RDP78T04759A00120041 #`-4 m Only
n r s
25X1 D
25X1 D
25X1 D
TOP SECRET RUFF
TOP SECRET RUFF
Handle via Approved For Release 2001/09/ 7: CIA-RDP78TO4759AO01200010044-6
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Approved For Release 2001/09/07 : CIA-RDP78T04759A00120001004' rol System Only
Railroad, single track
Road
Fence
-------- Area outline
TOP SECRET RUFF
Handle via Approved For ReleasTe cJ0Za7'' IA- 6 7F8T04759A001200010044-6
TALENT-KEYHOLE
Control System Only
Handle Via
Approved For Release 2001/09/07 : CIA-RDP78TO4759AO012000100 4!6NT-KEYHOLE
ontrol System Only
TOP SECRET RUFF
Approved For Release 2001909 OT: CIA RDP78T04759A001200010044-6
Approved For Release 20V600S 7t 7 8TO4759AO01200010044-6