SOVIET MILITARY ORDER OF BATTLE MOSCOW MD

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04759A001200010044-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
8
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 22, 2001
Sequence Number: 
44
Case Number: 
Publication Date: 
June 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04759A001200010044-6.pdf416.3 KB
Body: 
Approved For Release 20011)aFb7S ADT'78T04759A001200010044-6 Copy 82 TC5,80650/65 6 Pages June 1965 PHOTOGRAPHIC INTERPRETATION REPORT SOVIET MILITARY ORDER OF BATTLE MOSCOW MD Handle Via TALENT - KEYHOLE Control Only This document contains classified information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive TALENT-KEYHOLE information. Its security must be maintained in accordance with KEYHOLE and TALENT regulations. NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER T001/09/07: CIA-RD P78T04759A001200010044-6 eclass Revi ' e'llfl' RYEM[3 001/0TC~P SECRET HandleAPproved For Release 2001/907 :`CAA`-4T8%J ff9A001200010044-6 TALENT-KEYHOLE Control System Only This report is one in a series on Soviet Ground Force and Logistic installations being prepared for a DIA/CIA Panel. The series is being coordinated, published and disseminated by NPIC. The photographic analysis is being performed by the NPIC Photographic Analysis Group, the CIA Photographic Intelligence Division (NPIC), and the Production Center 1Pla (DIA). The photographic analysis for this particular re- port was performed by the NPIC Photographic Analysis Group. In the interest of uniformity, the titles and letter designators for the facilities observed at these installations are identical with those appearing in the project requirement. When a specific facility is not observed both its title and letter designator are omitted in the report. Titles and letter designators for the various facilities are as follows: (A) railroad service, (B) road service, (C) landing strips, (D) administrative and troop housing areas, (E) storage areas, (F) am- munition storage areas, (G) PO1. storage areas, (H) other buildings and facilities, (J) equipment storage/maintenance areas, (IC) athletic fields, (L) small arms firing ranges, (M) driver training areas, (N) tank/ assault gun firing ranges, (P) flat trajectory firingranges, (Q) artillery emplacements (batteries), (R) infantry or combined arms field train- ing area or courses, (S) special training facilities, (T) unidentified facilities or tracking activity. Approved For Release 2001/09/07 : CIA-RDP78T04759A001200010044- ALENT-KEYHOLE TOP SECRET RUFF Handle Approved For Release 211(/09/OF-`CPRDP7`8T04759A001200010044-6 TALENT-KEYHOLE Control System Only BUY AMMUNITION DEPOT NO 50 (58-26N 041-33E) BUY, KOSTROMSKAYA OBLAST, USSR MOSCOW MD Handle Via -KEYHOLE Approved For Release 2001/09/07 : CIA-RDP78TO4759AO01200010044-6ConTALEtroi l System Only nly TOP SECRET RUFF TOP SECRET RUFF Hand lA~ pproved For Release 2001/09/07 :CIA-RDP78T04759A001200010044-6 TALENT_ KYHOLE Control System Only Handle Via TALENT-KEYHOLE Approved For Release 2001/09/07 : CIA-RDP78TO4759AO01200010044-6 Control System Only TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only Approved For ReleaseS2 0S/03/07 RCIA fRDP78T04759A001200010044-6 Buy Ammunition Depot No 50 is located approximately 3.5 kilometers (km) from the center of Buy (Figure 1). The depot is comprised of a storage and support area and covers approximately 1,000 acres. The storage area contains 64 ammunition storage buildings, 3 possible ammunition storage buildings, 1 possible ammunition storage build- ing under construction, and 5 support buildings. The support area contains 1 administration building, 3 multistory barracks, 29 support buildings, and an athletic field (Figures 2 and 3). KEY- Comparative analysis reveals no change in faci itics and a light level of activity. Railroad Service A rail spur enters from Buy and splits into 5 sidings inside the installation. An all-weather road from Buy serves the installation. Administration and Troop Housing Arc>a Area D contains 1 administration building, 3 multistory barracks, and 29 support buildings. Ammunition Storage Areas Area F1 contains 64 ammunition storage buildings, I possible ammunition storage building under construction, and 5 support build- ings. Area F2 contains 3 possible ammunition storage buildings. POL Storage Area Eight medium POL tanks are located at 58-27N 041-42E. Handle Via ly Approved For Release 2001/09/07: CIA-RDP78T04759A00120041 #`-4 m Only n r s 25X1 D 25X1 D 25X1 D TOP SECRET RUFF TOP SECRET RUFF Handle via Approved For Release 2001/09/ 7: CIA-RDP78TO4759AO01200010044-6 TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Approved For Release 2001/09/07 : CIA-RDP78T04759A00120001004' rol System Only Railroad, single track Road Fence -------- Area outline TOP SECRET RUFF Handle via Approved For ReleasTe cJ0Za7'' IA- 6 7F8T04759A001200010044-6 TALENT-KEYHOLE Control System Only Handle Via Approved For Release 2001/09/07 : CIA-RDP78TO4759AO012000100 4!6NT-KEYHOLE ontrol System Only TOP SECRET RUFF Approved For Release 2001909 OT: CIA RDP78T04759A001200010044-6 Approved For Release 20V600S 7t 7 8TO4759AO01200010044-6