SARY-SHAGAN PROBABLE LAUNCH AREA A USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A001700010086-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
August 9, 2001
Sequence Number:
86
Case Number:
Publication Date:
August 1, 1965
Content Type:
BRIEF
File:
Attachment | Size |
---|---|
![]() | 435.91 KB |
Body:
Approved For Release 2001/09/01 : CIA-RDP78TO4759AO01700010086-5
TOP SECRET
PHOTOGRAPHIC INTERPRETATION REPORT
Declass Review by
NIMA/DOD
Approved For RAW 2U0'f0 : CIA-RDP78TO4759AO017
TCS-81 132/65
AUGUST 1965
GROUP 1 EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For Release 2001/09/01 : CIA-RDP78T04759A001700010086-5
WARNING
This document contains Information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive Information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining toTALENT-KEYHOLE Control System.
Approved For Release 2001/09/01 : CIA-RDP78T04759A001700010086-5
Handle ViaApproved
For Release 200y8rr ~10SEefTDRffT04759A001700010086-5
Talent-KEYHOLE
TCS-81132/65
Control System Only
August 1965
Sary-Shagan Probable Launch Area A
Location: Approximately 4 nautical miles (nm) NW of the Explosives Storage
Area, Main Support Base, Sary-Shagan Antimissile Test Center; 2.5 nm NW of
Sary-Shagan M1/SAN Launch Area 1.
Negation: No activity observed in the area on
Construction activity first observed on ?lissio
General: Connected by extensive trackage and a ground scar, probably for a
cable line, with Ml/SAKI Launch Area 1, also under concurrent construction.
This area bears a resemblance to Sary-Shagan Probable Launch Area B. Both
of these areas consist of a Probable Launch Area in initial construction
stage and an Electronic Site.
Handle Via
Talent-KEYHOLE
Approved For Release 2001/ j1S T)FRUf F4759A001700010086 5trol System Only
Handle Via Approved For Releas?aP1~( ~1~1rCb Ijp?P78TO4759AO01700010086-5
Talent-KEYHOLE 1 tJ J[trl~ I 1(Urr
Control System Only
TCS-81132/65
Probable Launch Area: Consists of 2 generally rectangular probable launch
sites in initial construction stage, separated by a distance of a roximate-
ly 1,800 feet. Additional clearing and grading took place from
at both sites. The azimuth of a perpendicular bisector of a line
drawn between the center of the 2 probable launch sites is degrees
(t 5 degrees). Each probable launch site is approximately 3 Meet from
the Electronic Site.
25X1D Electronic Site: On photography the Electronic Site consisted
of a revetted central control position occupied by vehicles/vans, 4 mounds
(1 occupied by a probable SIDE NET radar), and 1 probable BACK NET radar on
25X1D the ground. By two probable SIDE NET radars (a and c) and 1
probable BACK N, radar were positioned on 3 mounds and 1 probable BACK
NET (d) was on the ground. The fourth mound(e) remained unoccupied. Addi-
tional vehicles/vans had appeared in the central control position (f) during
the 4-day period. Distance from Item a to e and Item c to b is approximate-
ly 230 feet; distance from Item e to c and Item b to a is 400 feet.
Handle Via
Approved For Re1eaT1F0(G1T #WDP78T04759A00170A9t~T04tYn oHOLE
nly
Approved For Release 2001/OT?P: Leff f T04759AO01700010086-5
Approved For Release 2001 /097 PCS MT04759A001700010086-5