SOVIET MILITARY ORDER OF BATTLE TRANS CAUCASUS MD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A002000010023-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
9
Document Creation Date:
December 28, 2016
Document Release Date:
May 23, 2001
Sequence Number:
23
Case Number:
Publication Date:
October 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 687.79 KB |
Body:
Approv~d~~or~e4~3eT2001/09/01 :CIA-RDA >0475$0?OfOQ0023
PHOTOGRAPHIC INTERPRETA _ N REPO
SOVIET MILITARY
ORDER OF BATTLE
TRANS CAUCASUS MD
TCS-81338/65
OCTOBER 1965
.,~.
COPY ~`"~
6 PAGES
GROUP 7 EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSI FICATICN
TOP SECRET
DECLASS REVI~AI'P~q~oo1/09/01 :CIA-RDP78T04759A002000010023-0
Approved For Release 2001/09/01 :CIA-RDP78T04759A002000010023-0
WARNING
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. 5. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unouthori=ed person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by per.;onnel especialFy indoctrinated and authorized
to receive Information in The designated control channels. Its security must be maintained in accordance
with regulations pertaining toTALENT-KEYhIOLE Control System.
Approved For Release 2001/09/01 :CIA-RDP78T04759A002000010023-0
Handle Y;~pproved For Release /O~IR~I~TR9A002000010023-bCS-81338/65
TALENT-KEYHOLE
Control System Only
This report is one in a series on Soviet Ground Force and Logistic
installations being prepared for aDIA/CIi~ Panel. The series is being
coordinated, published and disseminated by NPLC. The photographic
analysis is being performed by the NPIC Photographic Analysis Group,
the CIA Photographic Intelligence Division (NPIC), and the Production
Center 1Pla (DIA). The photographic analysis for this particular re-
port was performed by the Production Center 1Pla.
In the interest of uniformity, the titles and letter designators for
the facilities observed at these installations are identical with those
appearing in the project requirement. When a specific facility is not
observed both its title and letter designator are omitted in the report.
Titles and letter designators for the various facilities are as
follows: (A) railroad service, (13) road service, (C) landing strips,
(D) administrative and troop housing areas, (I%) storage areas, (1~) am-
munition storage areas, (G) POI. storage areas, ([1) other buildings and
facilities, (J) equipment storage/maintenance areas, (K) athletic fields,
(L) small arms firing ranges, (IVl) driver training areas, (1\) tank/
assault gun firing ranges, (P) flat trajectory firing ranges, (Q) artillery
emplacements (batteries), (ft) infantry ~r combined arms field train-
ing areas or courses, (S) special training facilities, (T) unidentified
facilities or tracking activity.
TOP SECRET CHESS RUFF
Handle Yia
TALENT?KEVHOLE
Control System Only
Approved For Release 2001/09/01 :CIA-RDP78T04759A002000010023-0
dandle Yia gpproved For R~~~s~~~1~9/r~:~ls--~~$T04759A002000(~'~,0~~~~~,~7
TALENT-KEYHOLE
Control System Only
B ~~KU ARMY BARRACKS SI{~~.[?N]YA'~
t.'+~)-2:3-12N Q49-d9-lfil~l
13AK: A7,F.RBAYf~/,Ht~NSKAYA ~Sft, L!~,Slt
~= Rn?JSCAUC:r1S[iS, ?V11 i
TOP SECRET CHESS RUFF
Handle Yia
TALENT-KEYHOLE
Control System Only
Approved For Release 2001/09/01 :CIA-RDP78T04759A002000010023-0
Handle Vi ~1/~T~.'R~~IA-~~P~6~~~9A002000010023 0 S 81338/6`
V4 roved For Release
TALENT-KEYHOLE
Control System Only
FIGURE 2. BAKU ARMY BARRACKS SHAUMYAN, BAKU, USSR
TOP SECRET CHESS RUFF
Nandle Yia
TALENT-KEYHOLE
Control System Only
Approved For Release 2001/09/01 :CIA-RDP78T04759A002000010023-0
liantlle Yia
TALENT-KErHOLE Approved For Rej~e~D~'~~~/0(H~~R~~ f~704759A0020000'I00~-3-10~3r/65
Control System Only
Baku Army Barracks Shaumvan is located
un the western outskirts of Baku approximately
a kilometers rkm) west-northwest of the Baku
Railroad Station Yards and Shops (Figure 1),
~L'he installation covers approximately 315
acres and contains 15 administr: tion buildings,
;i5 multistory barracks, S vehicle/erluipment
raintenance structures, 21 vehicle/equipment
storage buildings, 6 warehouses, 97 support
buildings, and 8 hospital buildings (Figures 2
and ,3i.
C;on"~parative ~.nalysis of ~ rt\I.~\"C and