HSI-AN AIRFRAME PLANT YEN-LIANG AIRFIELD CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A002100010021-1
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
June 26, 2001
Sequence Number:
21
Case Number:
Publication Date:
November 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 225.38 KB |
Body:
Approved For Rel ease 2001/09/01 : CIA-RDP78TO4759AO02100010021-1
PHOTOGRAPHIC INTERPt;. TA.T]ON REPORT
HSI-AN AIRFRAME PLANT
YEN-LIANG AIRFIELD
CHINA
T C S-81454/65
NOVEMBER 1965
DECLASS REVIEW by NIMA/DOD
GROUP i EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DEC LASSIFIC AT. ON
Approved For Relea oSE ETCIA-RDP78T04759A002100
Approved For Release 2001/09/01 : CIA-RDP78T04759A002100010021-1
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining to TALENT-KEYHOLE Control System.
Approved For Release 2001/09/01 : CIA-RDP78T04759A002100010021-1
Handl.e Via ~yEed For Release 2001/09B) P. (SO BR'9A002100010021-1
Ta l e tltRf'
Control System Only Tcs-81l+54/65
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Hsi-an Airframe Plant, Yen-liang Airfield
China 34-39N l09-16E
A study of the level of construction activity at Hsi-an Airframe Plant,
Yen-liang Airfield, shows that construction of the plant has been resumed 25X1D
after a standstill of almost 2 years.
A subassembly building which has been under construction since is
now completed, and the probable final assembly hall, still under cons ruc-
tion, has been enlarged. A workshop on the west side of the plant has been
completed. A subassembly building at the north end of the plant and a taxi-
way from the plant to Yen-liang Airfield are under construction.
SUBASSEMBLY BUILDING
(UNDER CONSTRUCTION
TAXIWAY
UNDER CONSTRUCTION
YEN-LIANG AIRFIELD
W8,400' _X 230' OP
WORKSHOP/MACHINE SHO
AUNDER CONSTRUCTION
PROBABLE
FINAL ASSEMBLY HALL
UNDER CONSTRUCTION
November 1965
Handle Via
p r0RIYiCC I' ry Talent-KEYHOLE
Approved For Release 2001/0 y, 8R9A002100010021-1 Control System Only
TOP SECRET
Approved For Release 2001/09/01 : CIA-RDP78T04759A002100010021-1
Approved For Release 2001/09/O10PIq ET04759A002100010021-1