NEW TEST STAND AT KRASNOYARSK ROCKET ENGINE TEST FACILITY, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04759A002200010097-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 5, 2001
Sequence Number: 
97
Case Number: 
Publication Date: 
December 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04759A002200010097-7.pdf260.35 KB
Body: 
APProd =Release 2001/09/01 : CIA-RDP78TO4759AO02200010097-7 NEW TEST STAND AT KRASNOYARSK ROCKET ENGINE TEST FACILITY, USSR Declass Review by NIMA/DOD TCS-81598/65 DECEMBER 1965 COPY 1 PAGE Approved P PelgfeffEll/09/01 : CIA-RDP78T04759Af02200010097-7 Approved For Release 2001/09/01 : CIA-RDP78TO4759AO02200010097-7 i;, n',,cument contains Iriir of the espionage laws U. S the revelation of its conten hrr. judi r:iol to the safety or 9:3+rtriirnent of the United Stat t , re,- ve information in th wrrl-, regulations pertaining t nation at ecting the notioncii sncurii at the Unit,.rd : ures wirrun the meaning Code i i^tc 18, Sections 79:3 and " d. l he "taw prohibits its transmission or in any manner to an unauthorized erson, as vve1i ax ;its, use in any manner merest of the United States or for tr benefit of ny foreign government to rite _1 It is to be seen oniy by persona' i especially inelrit iii :,,roux or,u uuthari r:oe designdt,id control Channels., Its ii must tie riot ,'l tof red in accordance i ALENI',t: YH?LF Control System., Approved For Release 2001/09/01 : CIA-RDP78TO4759AO02200010097-7 Handle Via (~p Tr Ip ~T TCS-nl 8 65 M l/ Talent?KEYHOLEApproved For Release Control System Only .`CIA- 78T04759A00229gq~ -7i965 New Test Stand at Krasnoyarsk Rocket Engine Test Facility The second vertical test stand at the Krasnoyarsk Rocket Engine Test Facility, USSR, appears to be essentially complete and may be operational. A small structure which possibly is a control building has been erected immediately south of the new test stand. The new stand is about 50 feet high, approximately half the height of the original stand, and is propor- tionately smaller in length and width. Like the original stand, the new test stand appears to have a rectangular projection or elevated housing attached to the blast deflector side of the structure. A ditch/pipeline leads from the lower end of the flame bucket to the bottom of the adjacent valley. Activity at the test facility on was indicated by a 25X1D large plume of smoke/steam rising from a of er ouse near the north end of the installation. Handle Via Approved For Release /0~ 4R ffA 8T04759A00220001Lp0 7! 't KEYHOLE on rol yste m Only Approved For Release 21A 0910k.gIiRDP78TO4759AO02200010097-7 Approved For Release ?UM?t: RDP78TO4759AO02200010097-7