CONSTRUCTION ACTIVITY IN CHANG PENG PARK, SHANGHAI, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A009100010183-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
October 24, 2003
Sequence Number:
183
Case Number:
Publication Date:
April 22, 1969
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 77.21 KB |
Body:
Approved For Rel
ase 2003/1 ~
f?J
A00910001014814-4
D
22 April 19 9
Copy 0
THROUGH:
SUBJECT:
Construction Activity In Chang Feng Park, Shanghai, China
REFERENCE: Requirement No. NSA/SOC/R-139-69
NPIC Project No. 250410
25X1
25X1
1. In responae to the referenced requirement, a search of all photography
covering the Chang Feng Park, Shanghai, China, subsequent tol was e,2.5X1 D
amined to verify new construction in the park and to determine the purpose of
such construction.
2. The park was located through the use of map sheet CIA 52352, 9-65
(West Sheet). The location conforms to the coordinates in the reference.
3. The search area was covered only on small-scale photography, the inter-
pretability of which is rated good.
4. The study revealed an area of construction activity at the east edge of
the park which is chronologically described below:
On photography of
tion activity.
Photography of I Irevealed that a large arched-roof
structure had been constructed on the southeast edge of the park. Two
buildings had been constructed immediately north of the large arched-
roof structure.
Photography of
revealed that the arched-roof 25X1 D
same place. Two additional buildings had been constructed since
0
Declass Review by NIMA / DoD
GROUP I
Excluded frun automatic
doA 1 W FWcPe lease 2003/12/1
T?tlAE T0475 A009
declassification
25X1
25X1
Approved or a eas
2003/12/1991lE,
22 April 1969
SUBJECT: Construction Activity In Chang Feng Park, Shanghai, China
There is no apparent change in this facility on photography of
The scale of the photography precludes a determination of the
function of the activity; however, it is probably associated with the
installation located along the east edge of the park, which appears
institutional in nature.
No other construction activity can be identified in the immediate
area of the Chang Feng Park during the referenced time interval.
5. Questions regarding this project may be directed to the imagery
analyst, of the China, North Korea Branch, EGD/IEG, on
extension Tials project is considered to be complete.
25X1
25X1
25X1A
Distribution:
Chief, Imagery Exploitation Group
NPIC
1&2
- NSA TCO/POL/SOC
8 -
NP
IC/
PSG/RRD
/ESS
3
- NSA/LO/NPIC
9 -
CI
A/D
DI/IRS/
Recce/R
4
- NPIC/IEG/EGD
10
CI
A/I
AS
5
- NPIC/IEG/EGD/CNKB
11 -
DI
AXX
-3A
6
- NPIC/PSG/AID (Attn:
12 -
DI
AXX
-3C
2
5X1A
7
- NPIC/IEG/PCS/RCB
13 -
TC
O/N
RTSC
14 -
AF
NIE
-BA
25X1
Approved For Release 2003/12/19: CIA-R 59A00 100010183-5
TOP SECRET 25X1
25X1 Approved For Release 2003/12/19 : CIA-RDP78TO4759AO09100010183-5
Approved For Release 2003/12/19 : CIA-RDP78TO4759AO09100010183-5