TYURATAM MISSILE TEST CENTER, TRACKING FACILITY 2 (46-17-15N 64-51-44E)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A010000010110-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
October 21, 2003
Sequence Number:
110
Case Number:
Publication Date:
January 10, 1972
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 66.33 KB |
Body:
25X1
Approved For Release 2003/12/19 : CIA-RDP78T04759A010000010110-4
Copy 9
25X1
25X1 D
25X1 D
TOP SECRET
25X1
10 January 1972
SUBJECT Tyuratam Missile Test Center, Tracking Facility 2
(46-17-15N 64-51-44E)
REFERENCE NSA/P04/SPO/R-118-72
(NPIC Project 251358)
1. A study of photography of Tyuratam Tracking Facility 2 supports
I I
25X1
2. There were no significant changes to the tracking facility 25X1 D
he date of the latest NPIC publication describin
the ac ty However, 25X1 D
roo
it was noted that the SHIP WHEEL radar had been removed from the
of the main control building. Also two of the three FORK REST antennas
and a probable R-400 microwave antenna had been removed, and several
pieces of unidentified materials were on the ground in front of the main
control building Ithe two environmental domes and the
optical tracking aevices prey ous y referred to as radar A's) had been
removed from their support structures. The third FORK REST antenna at
the facility had been removed.
3. When observedi the only electronics 25X1 D
25X1 D
equipment remaining at the facility were two horizontal dipole antennas.
In addition most of the ground support equipment which was normally
observed within the motor pool had been removed 2 5X1 D
The only ground support equipment observed in the facility
were two fuel trailers without prime movers.
4. No significant associated facilities or activity were observed
within a 5 rim radius of the tracking facility. An open ditch, probably
for water drainage, extends northward from the facility and terminates
at a dry lake bed.
should be directed to the imagery analyst
5. This project is considered to be complete.
Declass Review by NIMA / DOD
25X1A
25X1A
25X1
GROUP 1
Exc lAop~gq468TdF1 & 2003/12/19 : CIA-RD
downg ding and
'declassification TOP SECRET
evidence that the facility is being deactivated.
Approved For Releas 203t1 2f8?R1 I -RDP78T047 9A010000 10110-4 25X1
10 January
SUBJECT: Tyuratam Missile Test Center, Tracking Facility 2
(46-17-15N 64-51-44E)
Distribution:
Cy 1 & 2 - TCO/NSA/P04/SPO
3 & 4 - NPIC/IEG/MSD
5 - NPIC/PSG/R&RD
6 - NPIC/IEG/OD/RCB
7 - NPIC/PSG/RRD/ESS
8 - NSA/L0/NPIC
9 - CIA/DDI/IRS/Recce/R
10 - CIA/IAS
11 - DS-3B8
12 - DS-3B9
13 - TCO/NRTSC
GROUP 1
Excluded from automatic
dodge ca on Release 200?612/jE9CR~ -RDP78T0475 010000010110-4
declas ca ion
25X1
25X1
25X1 Approved For Release 2003/12/19 : CIA-RDP78T04759A010000010110-4
Approved For Release 2003/12/19 : CIA-RDP78T04759A010000010110-4