UKHTA PETROLEUM REFINERY UKHTA, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A000500010079-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
16
Document Creation Date:
December 28, 2016
Document Release Date:
April 26, 2004
Sequence Number:
79
Case Number:
Publication Date:
October 1, 1965
Content Type:
IR
File:
Attachment | Size |
---|---|
![]() | 853.19 KB |
Body:
Declass Review by NGA
~4GERY
ALYSIS
ISION
CIA/Ply 65037
GROUP I
Excluded f,om au+omor;c
dow q.adinq and daclo ssif is
DATE OCt. 1965
COPY y
~Op ~~~~~~
f
p
II
Approved For Release 2004/07/07 :CIA-RDP78T05161A00050~~60~~-8
RECORD
COPY
COPY N0.
PUB. DATE LOCATION
MASTER
DATE RECEIVED LOCATION
o ~ smov~ab,~rt release 2004/07/07
CUT TO DATE
COPIES 0 DATE 1 0 7 1 COPIES
f3k~RDP78T 5~t16t1~u000500 ,AX I ~uMiO
LEVEL
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
NUMBER OF COPIES
RECEIVED OR ISSUED
~
RECEIVED OR ISSUED
q0.
DAY
YR.
REC D
ISS
D
BAL
MO.
DAY
YR.
RECD
ISS~D
BAL
8
16
68
'~isto Unit ~r'S1-o0
10
10
~
d~'
7~f
"~ . _ ' ~; /- ~ ~
~
lit,
d
~~
Approv
CIA IMAGERY AN ALY515 DIVISION
UKE~TA PETROLEUM REFINERY
UKHTA, USSR
d For Release 2QQ~J~7~~~
PIR - 5037
The Ukhta Petroleum Refinery is situated in the northeastern sector
of the town of Ukhta. The approximate center of the refinery area is
located at geographic coordinates 63 34N - 53 43E, Figures 1 and 2.
The refinery area, as delineated by a fence-road system (solid line
perimeter shown on the overlay to Figure 6), covers an area of approximately
250 acres. The separate but apparently related installation immediately
east of the refinery area proper occupies an additional 75 acres. The .
facilities in the latter area appear to be those most likely to be used
for the processing of the viscous and heavy semi-solid crude hydrocarbons
reportedly produced in the vicinity of Ukhta.
A branch line from the Vorkuta-Moscow-Leningrad railroad system enters
the refinery area via a bridge over the Ukhta River. Several spurs, with
transloading facilities, are apparent in the northwest and central parts of
the refinery area.
A possible carbon black plant, also rail served, is located about one
nm east of the refinery area. A steam power plant is situated due west of,
and adjacent to, the refinery. Steam lines can be traced leading from this
plant to the several processing areas within the refinery. Both of these
facilities are annotated on Figure 5, as is the refinery flare tower.
Considerable possible construction activity in plant area G, Figure 6
is evident on photography of This construction may be more
apparent than real inasmuch as e re erenced photography is of poor
quality. In any event, the facilities in the area appeared to be essentiall
complete by - Figure 4. Photographic coverage of
Figure 5, shows four large probable crude oil storage tanks un er construction.
The tanks had been completed and the refinery boundary moved to accommodate
them by Area A, Figure 6. A small, secured, possible storage
area located just east of, and adjacent to, plant Area G, Figure 6, is also
evident on the photography. This facility is annotated on
Figure 7. The rows o unidentified objects visible in this area on the
photography could be a bank of horizontal tanks; the quality of th
p o ography does not permit a positive identification.
The following categorization of the various areas of the refinery and
adjacent facilities is keyed to the overlay to Figure 6.
Approved For Release~~~4~~~ IA-RDP7 T05161A00050a010079-8
Area A: There are 4 large probable crude oil storage tanks,
two medium sized buildings and 1-3 small structures in this area.
Area B: Five large probable crude oil storage tanks, 4 medium
sized tanks and g small tanks, the latter two groups of tanks being
probable product storage facilities, and two buildings that probably
house pumping equipment constitute the facilities present in this
area .
Area C: The greater part of the processing equipment present in
the Ukhta Refinery is located in this area. Approximately 15 buildings,
including 3 large structures, approximately 20 small tanks and two
groups of unhoused or partially housed processing equipment constitute
the principal facilities in the area. One of the large structures,
No. 3, probably houses processing equipment, the nature of which is
not discernible. The equipment located in the vicinity of No. 1
may be one or more thermal cracking units although pipe furnaces
plus the usual fractionating equipment are equally likely.
The equipment in the vicinity of No. 2 appears to be one or
more pipe stills. In this area, as is the case throughout the refinery
area, the available photography is not of sufficiently high resolution
to permit the certain identification of processing units.
Area D: This area is primarily concerned with the shipping and
receiving of materials, with incoming materials probably unloaded and
warehoused in the central part, No. 3, and the outgoing petroleum
products probably loaded in the vicinity of the two long loading
racks, No. 1. Three large underground probable product storage tanks
with an associated probable pumphouse are located at No. 2. The
10-12 buildings in the area are probably used for storage and shop
space.
Area E: The greater part of this area is occupied by product
storage tanks, with the likelihood that several of the larger tanks
are utilized for crude oil storage. An apparent processing unit,
possibly pipe stills, is located at No. 1. A total of approximately
70 tanks, some of which are below grade, are present in the area.
Area F: This area contains the administrative and laboratory
facilities of the refinery, as well as the water treatment facilities.
Three probable POL tanks of medium size are located near the eastern
end of the area .
Area G: The facilities in this area constitute a possible
plant for specialized products derived from semi-solid crude hydro-
carbons. The fenced area, No. 1, contains 5-6 small buildings, a
small tower-like structure and a number of small tanks, some of which
Approved For Release 2
- 2 -
Approve
05161 AO -
PIR - 5037
appear to be set on a raised platform, some appear to be below grade
and the rest are conventional above-ground tanks. The processing area
contains a number of large structures, one .of which is very long, No.
2, and two of which have complex floor plans. The long building
appears to connect to its neighbors on the north and west by conveyor
systems, suggesting the handling of bulk solid or near-solid materials.
A.probable steam line emanating from the refinery area proper, as well
as possible pipeline scars tying the two areas together, suggests
an interrelationship as does the complex of tanks previously mentioned
and the fact that the installations are contiguouso Five rows of
material in open storage beside the rail spur in the northeast corner
of the area are similar in appearance to the material visible in the
new possible storage area annotated on Figure 7.
All measurements have been made by the CIA~IAD~IB project analyst.
They should be considered as approximate and must not be taken as official
NPIC mensuration data compiled by the Technical Intelligence Division, NPIC.
Approved For Release 0~~~`
25
25
Approv
61A000 00010079-8
1. SAC, 15th Rts., US Air Target Chart, Series 200, Sheet 0101-5HL
2nd Ed., September 1862, Scale 1:200,000 (SECRET)
2, General Locator Map, USSR - 29656 1-61 (UNCLASSIFIED)
RE QUI REI~NT
CIA. C-RR5-82521
CIA~IAD PROJECT
30598-5
- ~+ -
Approved For Release ~B/O~~f~ -RDP78 05161A0005 0010079-8
Approved For Release 200 /~~~ A-RDP7 T05161A00050001007 -
PIR - 5037
25
PREPARED BY - CHEMICAL AND SCIENTIFIC SECTIONS
INDUSTRIAL BRANCH IAD
FIGURE 1
Approved For Release 2 R - T05161A000500010079-8 25
25
25X1 gpproved For Release 2004/07/07 :CIA-RDP78T05161A000500010079-8
Approved For Release 2004/07/07 :CIA-RDP78T05161A000500010079-8
RECORD COPY NO.
COPY
PUB. DATE
LOCATION
DATE RECEIVED LOCATION
MASTER
~ ~ slAp~ano~e~stbT~t release 2004/07/07
~k~LRDP I a,A>< I ~~~^ 10
CUT TO
COPIES U
DATE
1/7~
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
NUMBER OF COPIES
AfO
DAY
YR
RECEIVED OR ISSUED
~
RECEIVED OR ISSUED
.
.
RECD
ISS
D
BAL
MO.
DAY
YR.
RECD
ISS~D
BAL
~ 5
~`'
Dis-ta :,n ~-t -`57_-~;;
10
10
-8
D
TE
NUMBER OF COPIES
DATE
D
NUMBER OF COPIES
A
RECEIVED OR ISSUED
RECEIVED OR ISSUE
C
ISS?D
BAL
~0.
UAY
YR.
A roved ForRel
~~~
,p
O04/
-
D
RE
-
Approved For Rel
ase
004/0
/07 :
CIA
RD
78
5161A000500010079-8
_
CLASS. IOCATiON
T.TKEfiI'A PETRQL7~UM REPTNERX'
Ukhta, USSR 2 5
63 3~+V - ~3 ~-3E
Approved For R~~~se~~9^~~"$~'~~ '^-?^D7 ~ 'AO 0500010079-8 25
N~~
X1 PIR _ 5G37
FIGURE ~-
UKE~TA PETR4ZE~l3M REFINERY
Ukhta, USSR
63 3~+~ - S3 ~-3E
roved For Release 200
r
Approved For Release
F
7805 "F?6:1 AQ00500010079-8
~ FLARE TOWER
POSSIBLE CARBON BLACK PI,ANI'.'"~
00~~7~~~ IA-RDP
PIR - 65037 2 5
FIGURE ~
UKEiTA PETROLEUM REFINERY
Ukhta, USSR
63 3~-N - 53 43E
___..
_.---- o ,
-- oved For Re1se 2004f07f0~:
Y?P S~C~~~
FIGURE 6
Approved For R
Approved For Release 2004~01~/9I$~~[~I -RDP7 T05161A000500010079-8
25
25
ux~r~ ~~x~~~ ~~~~ 25
UI~.Yita, USSR
63 3~-N - 53 ~+3~
Approved For Release 2004/07/07[[CIA-RDP~j7'8T05161A000500010079-8
1
1
1
1
1
1
1
1
1
Approved For Releas~7/~~~1~78T05161A000500010079-8