K' AI - FENG NITROGEN FERTILIZER PLANT K' AI - FENG, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A000600010072-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
13
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 7, 2003
Sequence Number: 
72
Case Number: 
Publication Date: 
April 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A000600010072-4.pdf4.23 MB
Body: 
Approved For Release pa(DUO912&PHOC H uml K A ?FENG N iTROGEN FERT MZER PLANT K A0?FENG, CH NA Declass Review by NIMA/DOD IAGERY ALYSIS ISION 25 25 M N ? YYIn7 .,.' MP SEC U CCPY`4 Cl/,/F Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010072-4 25X1 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010072-4 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010072-4 RECORD COPY COPY NO. PUB. DATE LOCATION MASTER DATE RECEIVED LOCATION D' {-Tab Lease 2004/05/05 : ` DP78T0 ?I ~'f A`l~'006Q0010072- MAXI MUM 10 CUT TO 0 COPIES DATE 7/72 CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE CUT TO COPIES DATE MASTER DATE DATE NUMBER OF COPIES DATE NUMBER OF COPIES MO. DAY Y,R. RECEIVED OR ISSUED RE C D ISS' 0 BAL MO. DAY YR. RECEIVED OR ISSUED REC'o Iss'o BAL 9 5 68 Dist Unit '1 0 10 10 7,1 - ? 1 SEC. CLASS. LOCATION PIR65107 APR. 1966 TSA I ~ci i,n 25 Approved For Release 200 RATA Mandalay Ku ei yang0 VEE"'AM H' n. THAILAND PREPARED BY - CHEMICAL AND SCIENTIFIC SECTION INDUSTRIAL BRANCH, IAD -'~-,. fl hasa PtNAKH KATm 14A U.. s11 F-4 FIGURE 1 Approved For Release 2ni; 4.MP.;gCRET A OR AT- ' - 5161A000600010072-4 25 25 25 25 25 25X5 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010072-4 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010072-4 Approv$ W 19M RS -?161 A00060001 077 PIE 2-4 - 65107 z K'AI-FENG NITROGEN FERTILIZER PLANT K'AI-FENG, CHINA The K'ai-feng Nitrogen Fertilizer Plant is located at 34 47N - 114 23E,? approximately 1.5 nm ea,st of the center of K'ai-feng in Honan Province, China (Figures 1 and 2). It is road and rail served and covers an area of approximately 5,700,000 square feet. Using coal and pyrite as raw materials, synthetic ammonia, sulfuric acid, and ammonium sulfate are produced at this plant. The specific facilities necessary to accomplish this have been identified by number on Figure 6: Boilerhouse Retort building Two gasholders Ammonia. synthesis building Sulfuric acid plant Sulfuric acid storage tanks Ammonium sulfate production section Area, of expansion Water treatment area. Abandoned construction site Coal storage and handling area. Conveyor Shops, stora.ge/temporary construction buildings, and open material storage Administrative and warehousing facilities Open material storage (probably coal and pyrite) All available photographic coverage during the period was examined in order to follow the constructs p Figures 3 through 6). The following significant changes and activity, by mission, were noted: (1) Externally, most of the production fa.cilities appeared in a late stage of construction in (Figure 3). The sulfuric acid plant was essentially complete a. oug rail service did not extend into this area,. One of the gasholders and many of the pipelines between the various facilities were under construction. Approximately 20 tank d For Release 2? 25 25 Approved For Release 2R/O&IJ?REiAjRDP78T05161A000600010072-4 Approved For Release 2CM105WRE1F- DP78T0 161A0006000 0072-4 PIR - 65107 cars and 7 gondola./hopper cars were noted within the plant area.. (2) A number of changes were noted from photography of Figure 4). Modification of the boilerhouse was underway; the roof had been removed and a, new one was under construction. Two conveyors had been constructed. One of these is on the south side of the boilerhouse, the other is indicated by Annotation 12, Figure 6. The gasholder previously under construction was complete. Construction of coal storage and handling facilities (Annotation 11, Figure 6) was in progress. Rail service still did not extend into the sulfuric acid and ammonium sulfate production areas. Seven gondola/hopper cars were observed within the plant area, and at least 40 gondola./hopper cars were near the open material storage area. (3) I I all production facilities appeared complete and probably in operation Figure 5). Open coal storage near the boiler- house was noted. Rail service extended into the ammonium sulfate production area and into an area. of new construction (Annotation 8, Figure 6). (4) Several unidentified buildings were constructed in this new area between nnotation 8, Figure 6). (5) Fluctuations in the amount of open material storage were noted in comparing the various missions. For example, increases in the amount of coal stored in the area, indicated by Annotation 15, Figure 6, were observed in A. decrease was apparent I 'These changes are probably y indicative of some level of production. Approved For Release 2va4P049'R~ 25 25 25 25 Apprc ved For Release TO4/EMET14 5161A00060001OO 2-4 MAPS AND CHARTS General Locator Map, China. - 29606 (UNCLASSIFIED) U.S. Air Target Chart, Series 200, Sheet 0385-9HL, 2nd Edition, November 1963 (SECRET) C-RR5-83,036 CIA/IAD PROJECT 30)+32-6 Approved For Release 21 25 25 25 25 PHOTO DATA: TOP SECRET Approved T05161 A000600010072-4 }! PIR - 65107 FIGURE 3 5161 A000609 ,01 ~OT2 K'ai-feng, China 34+4+7N- 11423E ' is TOP SECRE mwmwfip,l~- WPM K'ai-feng, China 34 47N - 114+ 23E IJIE b5107 FIGURE 6 K'AI-FENG NITROGEN FERTILIZER PLANT K'ai-feng, China 34 47N - 114 23E l, AV C TOP OP78 *Mffd For ReI "~"- e-vv,4lvul4-&*~ 25 p Approved For Release TOP/0 CCj M05161A000600010072-4 Approved For Release LQR/OS6C 76T05161A000600010072-4