CONSTRUCTION STATUS OF SOVIET SINGLE SILOS(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A001000010053-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
78
Document Creation Date:
December 28, 2016
Document Release Date:
August 7, 2003
Sequence Number:
53
Case Number:
Publication Date:
August 1, 1966
Content Type:
IR
File:
Attachment | Size |
---|---|
![]() | 2.88 MB |
Body:
Approved For Release
UCTOO STATUS OF S MET
SOO COLE SOLOS
Declass Review by NIMA/DOD
25X1
25X1
GROUP I
ER Iudad (ram. wt
dovigpeed ny and Mak f'carian_
CIA/PIR 71005
DATE Aug 1966
MP 59CRU AGES 7 4
Approved For Release 2003/09/30 : CIA-RDP78TO5161AO01000010053-0
25X1 Approved For Release 2003/09/30 : CIA-RDP78TO5161AO01000010053-0
Approved For Release 2003/09/30 : CIA-RDP78TO5161AO01000010053-0
RECORD
COPY
COPY NO.
PUB. DATE
LOCATION
MASTER
DATE RECEIVED
LOCATION
DIS I I N TE(
STOCK L
MINIMUM
MAXIMUM C
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
RE
E
NUMBER OF COPIES
NO.
DAY
YR.
RECEIVED OR ISSUED
REC D
ISS~D
BAL
NO.
DAY
YR.
C
IVED OR ISSUED
RECD
ISS'D
SAL
I~
6C
Des_'. ui ni- ?L1 L.1,,y
i
/ 6-,0
I?
r
=776
Aeoreved For Re'
ease
2003i
1
SEC. CLASS. LOCATION
1 i
25X1
r
Approve
For Rele'28f1j : CIA-RDP78T05161A001000010053-0
1
1
1
11
1
I
CONSTRUCTION STATUS OF SOVIET SINGLE SILOS
25X1
25X1
Approved For Relea5~P209 1+99P30
X1
Approved For ReleaseTOp3&EccE A-RDP78T05161A001000010053-0
N
N
Approved For ReleasT?PSE? f T
Approved
For Relea 0offew
CIA PIR-71005
CONSTRUCTION STATUS OF SOVIET SINGLE SILOS
This PIR is part of a continuing series which have evaluated the
progress of the Type III-C and Type III-D deployment programs. A full
explanation of the construction timing sheets which accompany this report
can be found in CIA/PIR-61119
This report reviews the construction status of Soviet Type III-C and
single silo launch sites (Figure 1) on 25X
I provided good quality photography o
various Type III-C sites early in eir construction cycle. It also con-
firmed the existence of a third Type III-C group at the Zhangiz Tobe ICBM
Complex. The repetitive coverage of though of poor quality
(as was that of I I , was in general sufficient for the identifi-
cation of Type III-D sites, particularly those in an advanced state of
construction. One probable Type III-D group was confirmed, and five con-
firmed and one probable group were added. Twenty-eight confirmed, eighteen
probable, and seven possible Type III-D sites were newly identified from
these three missions, and twenty-three sites previously carried as possible
or probable were confirmed. Four of the five new groups were observed at
Tatishchevo and Olovyannaya, the largest of the Type III-D complexes. They
are also the only two at which interferometers have been observed at the
control sites. These facilities may yet appear at any or all of the four
newest complexes--Svobodnyy, Kozelsk, Yedrovo, and Kostroma--since control
sites at these locations have not yet reached the stage of construction at
which installation of the interferometer legs normally occurr.
Observations and General Discussion
Type III-D Complexes
Svobodnyy
Poor quality coverage and heavy cloud cover prevented a good assessment
of the progress of this complex. However, the identification of a cluster
of three confirmed and two possible sites near the city of Svobodnyy is an
almost certain indication that three groups are under construction. One
confirmed site was added to fill out the first group, but the control site
has not yet been identified.
-~
ppCC9~
Approved For ReleasIQ00~1~89T
Approved q
or Releas Tu ft 8} :
among the seven confirmed and fourteen
This complex was covered by heavy clouds oni Site 7 was
identified as the control site for the only group known to be under con-
struction here, although there has been no adequate search coverage of
Kostroma
251
Two probable sites, far enough removed from the first sites to indicate
the presence of a probable second group, were identified on 2511
Kostroma has not been covered by =photography since o this year. 2 511
Yedrovo
This complex was covered by poor quality repetitive coverage. Two
possible sites were identified.
Drovyanaya
The presence of a fourth group under construction was confirmed.
Repetitive coverage resulted in the identification of four new confirmed
sites and one possible site; eleven sites previously carried as probable
and possible were confirmed.
Olovyannaya
Poor quality repetitive coverage established the presence of seven new
sites. Six of these form part of two new groups located at the extreme north
and south ends of the complex. Both are late first quarter or early second
quarter starts. This brings to eight the number of groups presently deployed
at Olovyannaya, the second largest Type III-D complex.
Tatishchevo
Elements of two new groups were
probable launch sites identified on
Tatishchevo remains the largest Type
CIA/PIR-71005
With nine groups deployed,
D -2
Approved For RelealDfo`0~C~~~911~0~ :
t
41
Approve
CIA./PIR-71005
1
t
1
Six confirmed, two probable and three possible sites were newly identified
on poor to fair quality repetitive coverage. One confirmed site filled out
the 'H' group. The rest form a new group south of the 'H' group, apparently
started in the first quarter of this year.
Gladkaya
Gladkaya was not covered during this period, nor has there been any
adequate search coverage of the complex this year. Gladkaya remains the
only one of the five original Type III-D complexes to have less than four
groups identified.
Dombarovskiy
For ReleasTOPOIRRET
Type III-C Complexes
25X1
This complex was partially covered by good quality photography. 25X
The control facility for the 'A' group now appears complete. Various parts
of the complex have not been seen well since and it is 25X
probable that three sites needed to complete the fourth group are under
construction but have not yet been observed.
Aleysk
Aleysk was not covered by any of the Imissions. There has been no
adequate search coverage of this complex since At least one
additional site should be under construction, an the time e apsed since
the start of construction of the second group strongly suggests the possi-
bility that a third group may have been started during this period of
inadequate coverage.
Few details were discernible on the repetitive coverage of
One site was observed to be complete.
Approved For ReleasJE403 3DE IA-RDP78TO5161A001000010053-0
25>
25X1
25X1
25X1
X1
X1
Approve
For Relea
CIA/PIR-71005
zt
I
Heavy clouds obscured most of this com lex on Three sites 25X
-L I
in the 'C' group were observed oni with wor proceeding at a 2f
normal pace.
Kartaly
Only Launch Site A-2 and a small portion of the transfer point were
visible oni Search coverage of this complex has been poor
this year, and some of the known sites have not been evaluated as to construction
status since late Three sites in the fourth group, as yet unidentified,
should now be under construction.
Good quality photography of
the 'C' group.
Tyuratam Missile Test Center
Headworks are still not apparent at any of the sites in the 'M' group,
although construction is continuing. There has still been no discernible
change in Launch Sites 1-6 (B-4),I-2, or 1-3. The latter two have now been
observed in Stage III for six months longer than has been customary for a
Type III-C site built at the range, and it seems probable that all three,
at least temporarily, have been abandoned.
t
t
X1
Approved For ReleaP265BB
2f
Approved
For Relea TUF g ff
a
t
CIA/PIR-61119,
ICBM Sites
REQUIREMENT
C-RR6-83,711
CIA/IAD PROJECT
31361-6
CTA/PIR-71005
25X1
Construction Status of Soviet Single Silo
(TOP SECRET 1 71 25X
Approved For ReleasTOS9 9T
25X
Approved I or Relea a CLI .
1 AO010 0010053-0
Approved For Relea QT,:
A roved
pp
For ReleasW1
A0010000 0053-0 25X
ALEYSK ICBM COMPLEX
SITE CONSTRUCTION STATUS
t
t
t
LAUNCH SITE
Al+
A
A4
A
A6
PREVIOUS DESIGNATION
F
E
D
A
B
TDI SITE DESIGNATION
6
4
12
1
2
MISSION/DATE
CONSTRUCTION STAGE
6A
6-g
TT)
4A
2
6A
4A
ID
ID
ID
2
ID
ID
7
6A
4A
Q
2
C
4A
C
4A
4A
Probable site
Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X
I Approved For ReleaslQ003>rKUT4IA-RDP78T05161A001000010053-0
Approve
For ReleaST&P?f Mt
ALEYSK ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
G
H
I
J
K*
TDI SITE DESIGNATION
7
8
9
10
11
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
TT)
TT)
Tp
ID
ID
ID
ID
TT)
Tp
TT)
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Launch Site H is probably the control site.
Approved For Releas O OSQ bT
Approv
CIA PIR-71005
LAUNCH SITE 11
A1+
A2
A~
4
A5
6
+
-RP
-R~
-R4
-Rr,
PA
PREVIOUS DESIGNATION
B
A
F
E
D
C
J
I
L
K
G
H
TDI SITE DESIGNATION
3
4
7
6
1
2
8
13
12
11
10
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
6A
6A
c)
A
4-B
4A
2
4A
4A
4A
ID
ID
ID
ID
ID
ID
ID
ID
ID
TT)
TT)
TT)
C
6R
C'.
TT)
(I.
ID
4
ID
6B
ID
ID
ID
TT)
ID
ID
IT)
Tn
TT)
T'r)
TT)
ID
'?
ID
r) R
TT)
TT)
TT)
TT)
TT)
6A
4A
6P
4A
4A
C
ID
ID
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
d For Releas~,2A03/EOp pt
DOMBAROVSKIY ICBM COMPLEX
SITE CONSTRUCTION STATUS
Approved For Releas0ST
t
2j
Approve
t
t
P For ReleasTOpOWR T
DOMBAROVSKIY ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
:-x
.!
0
R
M
TDI SITE DESIGNATION
20
15 1
19
1 18
17
1 16
14
MISSION/DATE
ID
ID
TT)
N
ID
TT)
TT)
CON
N
-
TT)
STRU
1
TT)
CTION
N
TT)
STA
N
I
2
GE
N
ID
TT)
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Site 18 was negated
25X1
25X
25X
I Approved For ReleasI 05TKIbT ~IA-RDP78T05161A001000010053-0
Approved
For ReleasTldr hT
DOMBAROVSKIY ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
T
S
TDI SITE DESIGNATION
22
21
24
MISSION/DATE
CONSTRUCTION STAGE
N
2
2
1
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Releas OB0 bT 4IA-RDP78T05161A001000010053-0
2f
A
1
1
r
r
r
w
r
r
I
25X
I
Approved Flo
r Releaser&3? IA-RDP78T05161A001000010053-0
DROVYANAYA
ICBM COMPLEX
A,
J51
11300- 1l3?15-
25X
25X
II Approved For Releas4i2an mcu= IA-RDP78TO5161AO01000010053-0
El Kt
Approve
For Relea TOP SECRET
DROVYANAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
Gl
G2+
G
G4
G
G6
G
G8
G
G10
X+
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
[]
L
I10
Ill
1121
131
14,
16
18
41
MISSION/DATE
CON
STRU
CTION STAGE
TT)
Tp
Tp
11)
11)
11)
ID
ID
-
-
-
ID
2
2
TD
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Releas - ( KtT
25X
Approved
or Releasef3 *E. IA-RDP78T05161 00010 00010 553-0
DROVYANAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
t
t
t
1
LAUNCH SITE
Hl
H2
H3
H4
H5
H6
H7+
H8
H9
H10
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
22
23
1 24
21
25
20
15
19
1 26
28
9
9
TT)
9
TT)
9
9
TT)
9
TT)
TT)
9
9
TT)
9
TT)
TT)
CON
TT)
TT)
STRU
9
Tp
TT)
CTION
9
9
TT)
9
TT)
TT)
STA
9
6B
9
6B
6B
TT)
TT)
9
8-
GE
ID
Tj)
TT)
ID
TT)
TT)
ID
TT)
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X1
T
I Approved For ReleaseTc
Approve
DROVYANAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
X1
LAUNCH SITE
I1+
12
I
14
I
16
17
1 18
I
I10
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
33
2
1
34
5
32
30
36
40
37
MISSION/DATE
CON
STRU
CTION
STA
GE
TT)
TT)
TT)
T1)
TT)
ID
ID
ID
ID
ID
_
I T1)
TT)
TT)
T
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
6
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
7
7
9
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
r For Relea TOP /EWT
Sites 30, 31, 33, 34, 35, 36, , an
I
Approved For ReleaSW05' ET
REMARKS: Sites 29 and 32 were negated on
21
t
1
I
25X
25X
I
Approved
For ReleasTO}0/RtT9
DROVYANAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
1
I
LAUNCH SITE
J1+
J2
J3
J4
J5
J6
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
44
8
46
45
1 47
1 39 1
43
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
N
ID
ID
ID
ID
ID
ID
ID'
ID
ID
ID
ID
TT)
TT)
TT)
TT)
TT)
TT)
Tn
* Probable site
REMARKS: Site 39 was negated on
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X
25X1
Approved For ReleasTOP0,SE(/R?T4IA-RDP78T05161A001000010053-0
Approve
0010053-0
CIA./PIR-71005
For Releasf(b3Sf?R(T
Approved For Relea 0g . ?IA-RDP78T05161A001000010053-0
t
Approved
053-0
CIA/PIR-71005
For ReleaseMp3/SKREf
GLADKAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
Fl+
F2
F
F
F5
F6
F
F8
F
F10
PREVIOUS DESIGNATION
_
TDI SITE DESIGNATION
8
4
10 I
ll 1
121
15
22
20
CON
STRU
CTION
STA
GE
TT)
77)
TT)
rT
D
T T)
TT)
TT)
TT)
TT)
TT)
Tp
TT)
TT)
-
-
Tp
ID
ID
C'.
I
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
2.5X1
25X1
Approved For Releasel63/s'REE
'X1
Approved
For ReleaMf0SI I :
05
GLADKAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
X1
LAUNCH SITE
Gl
G2
G
G4
G5+
G6
G
G8
G
G10*
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
16
1
18
21
23
- 24
19
- 40
39
8
MISSION /QATF
TT)
TT)
TT)
TT)
TT)
CON
TT)
TT)
STRU
TT)
TT)
9
CTION
TT)
IT)
STA
ID
GE
IT)
TT)
ID
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For ReleaTOROQ{'Q 'IQ :
Appruvg
t
d For ReleastdQ0W T
IA-RDP78T051
61A0010000 0053-0 NX
ula/ 5
GLADKAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
i
t
I
LAUNCH SITE Hl+
H2**
H3*
H4
H5
H6
H7
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
27
0
1
8
26
2
4
MISSION/DATE
CON
STRU
CTION
STA
GE
TT)
TT)
TT)
TD
TT)
Tn
TT)
TT)
ID
9
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Site H3 was erroneously reported on last update as TDI 29.
I Approved For Release'M93 : IA-RDP78TO5161AO01000010053-0
Approved F+
r Relea_ f17POSTERPT
IA-RDP78T0516 A0010 0010053-0
CIA/PIR-71005
1
1
I
Approved For Releat 00$1aft:
zt
1
t
i
Approved
For Releasq
I MEN I GA ST ELLO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
A1+
A2
A4
A
A6
B1
B2
B
B4
B
B6
PREVIOUS DESIGNATION
D
E
F
C
B
A
G
H
K
L
J
I
TDI SITE DESIGNATION
4
6
2
1
8
11
12
10
MISSION/DATE
CON
STRU
CTION
STA
GE
9
6B
4A
4A
4A
4A
ID
C
TT)
C
6
ID
ID
6B
D
4A I
ID
ID
TT)
C
TT)
TD
!D
ID
ID
6-g
ID
6B
ip
4A
TT)
ID
Tr)
ID
4
ID
C
TT)
TT)
TT)
TT)
ID
r) -R
A
A
4A
4A
A
C
6B
4A
4A
4A
4A
4A
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For ReleasTGFO 1RET~
Approved ~
or IMI&
IA-RDP78T051
I MEN I GASTELLO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
C1+
C2
C
C4
C5
C6
PREVIOUS DESIGNATION
R
0
N
M
P
TDI SITE DESIGNATION
17
18
15
14
13
16
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
1
TT)
TT)
TT)
TD
Tn
P
TT)
7F)
T1)
TT)
TT)
TT)
ID
11)
TT)
ID
IT)
ID
TD
ID
-
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Sites Cl C2, C3, C4, and C6 were negated on 2
Site C5 was negated on 2
Approved For ReleasgM03*E. IA-RDP78T05161 A001000010053-0
Approved
For ReleasTvp03S@ g' q
hA00100 010053-0 25X1
C JA/ 5
I
t
Approved For ReleassOp0IRRET
25X
Approve
61AO010000 0053-0
CIA PIR-71005
For Releas00gfeffl
IA-RDP78TO51
KARTALY ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
A1+
A2
A
A4
A
A6
B1+
B2
B
B4
B
B6
PREVIOUS DESIGNATION
A
F
E
C
D
B
H
G
J
K
P
I
TDI SITE DESIGNATION
1
6
a --
L4
2
8
12
11
1
10
MISSION/DATE
CONSTRU
CTION
STA
GE
TI)
TT)
TT)
TT) TT)
TT)
TT)
I TT)
TT)
TT)
TT)
TT)
ID
TT)
4A
TT)
TT)
TT)
ID
TT)
ED
TT)
TT)
ID
()R
TT)
TT)
TT)
IT)
ID
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For ReleasT?r:~ETRT
Approve
For ReleasTOP05PRET
KARTALY ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
1
LAUNCH SITE
Pl+
OP
(,3
_r4
c5
c6
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
14
15
1 18
19
1 21
20
MISSION/DATE
CON
STRU
CTIO
N STA
GE
ID
N
N
N
N
TT)
TT)
TT)
4A
4B
ID
ID
ID
ID
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X
25X1
Approved For Relea 05W [OT
Approvedl
For Relealvr_os
Approved For Releaml? % t/ Q
21
1
zf
1
Approved
For Release"3EJC
KOSTROMA ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
1
LAUNCH SITE
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
9
10*
MISSION/DATE
T-D
CON
STRU
CTION
STA
GE
Probable site REMARKS: Site 9 was negated on
Possible site
ID Identification only
C Completed site
+ Control site
N Negation
Approved For Releases (103 R .TC~-RDP78T05161A001000010053-0
or Relea-RW09ECR T
KOSTROMA ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
42
MISSION/DATE
CON
STRU
CTION
STA
GE
TT)
W
ID
ID
* Probable site REMARKS: Probable Site 12 was negated on
Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Releasf Q90 E?R(T
t
Approved
for ReleasTQPOSIE(T
61A00100 010053-0
Approved For Releas' GPOMEIRET
Approv$
d For ReleasTOPO WRET
KOZELSK ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
7+
8
9
10
11
12
14*-
MISSION/DATE
TT)
7
7
B
7
TT)
4A
CON
IT)
TT)
7
STRU
N
TT)
5
CTION
N
5
STA
ID
GE
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Sites 7-10 were negated
Site 14 was negated on
Approved For ReleaOgT-
Approvefd
For Releas(TWSK Tc
CIA IMAGERY ANALYSIS DIVISION
11 30' 115 45'
OLOVYANNAYA
ICBM COMPLEX
OLOVYANNAYA
U 50,45, -
1A0010 0010053-0
CIA PIR-710 5
2X
25X
Approved For Releasf W33KRET~IA-RDP78T05161A001000010053-0
LAUNCH SITE
X+
D1
D2
D
D4
D
D6
D7+
D8
D
D10
PREVIOUS DESIGNATION
Fl
TDI SITE DESIGNATION
24
4
8
10
6
12
13
11
MISSION/DATE
ID
TT)
A
T1)
TT)
Tn
TT)
TT)
TT)
CON
TT)
TT)
TT)
C
STRU
'TT)
TD
TT
C
CTION
TT)
TD
(I.
'?
STA
IT)
TT)
TT)
GE
ID
TT)
TT)
T)
9
TT)
TT)
ID
TT)
TT)
TT)
TT)
TT)
C
TT)
TT)
C
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approve
For ReleasT?pO RtT
001000010053-0 25X
'CIA PIR-71005
OLOVYANNAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
I
1
LAUNCH SITE
E1+
E2
E3
E4
E5
E6
E7
E8
E9
E10
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
17
14
15
16
19
18
20
21
22
23
MISSION/DATE
CONSTRUCTION STAGE
9
6B
ID
9
9
TD
TT)
TT)
TT)
TT)
T1)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
Tn
TT)
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X1
Approved For Releasi03,[D [BT kA-RDP78T05161A001000010053-0
Approve
For ReleasTo"Mfffti
lAO01000010 - 2(
5
OLOVYANNAYA' I CBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
Fl+
F2
F
F4
F
F6
F7-1
F8
F
F10
PREVIOUS DESIGNATION
F
P11
TDI SITE DESIGNATION
40
6
8
-39
41
4
44
42
MISSION/DATE
CON
STRU
CTION
STA
GE
5
6B
5
5
5
6A
4A
4A
5
6B
4A-
4A
5
4A
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
9
TT)
9
6A
TD
TT)
I
TT)
Tn
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
ID
6B
ID
ID
ID
ID
ID
ID
ID
ID
ID
TT)
TT)
TT)
TT)
TD
TD
TD
T Tn)
TT)
TD
TD
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For ReleaserP3ff E IA-RDP78T05161A001000010053-0
25X
I
Approved For Releasygp03gEt1RtT IA-RDP78T05161A001000010053-0 25X
PIE-71005
OLOVYANNAYA ICBM COMPLEX'
SITE CONSTRUCTION STATUS
LAUNCH SITE
G1+
2
G4
G
G6
G
8
0
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
-25_
1 26
2
28
29
1 0
1
2
.
MISSION/DATE
CON
STRU
CTIO
N STA
GE
9
6B
9
9
7
16A
6A
6A
6A
6A
6A
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
6B
9
7
ID
6A
6
6
9
TT)
TT)
TT)
ID
TD
TT)
TT)
TT)
TT)
TT)
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X1
I Approved For Relea"OSV pT ICIA-RDP78TO5161AO01000010053-0
pprov
OLOVYANNAYA 'ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
H1+
H2
H3
H4
H5
H6
H7
H8
H9
H10
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
46
47
49
0
4
1
48
2
8
MISSION/DATE
CON
STRU
CTION
STA
GE
5
6B
4A
4A
N
4A
4A
N
N
6B
4A
ID
ID
ID
ID
D
TT)
TT)
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
TT)
Tp
6A
F -TT)
I TT)
TT)
TT)
TT)
TT)
TT)
T1)
Tn
Tn
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
d For Releast ffy tt j?T IA-RDP78TO5161AO01000010053-0
Approved For Release35VE
t
Approved
For Release1.3 IA-RDP78T05161
OLOVYANNAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
55
56
MISSION/DATE II CONSTRUCTION STAGE
t
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
TT)
4A
00100001 053-0 P?X1
CIA PIR-71005
25X1
Approved For ReleaseIos3k REtI
Approved
OLOVYANNAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
X1
MISSION/DATE
For Relea I VrI,~0,9,AT - -
64
65
CONSTRUCTION STAGE
21(
t
I
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
ID
4B
Approved For ReleaTO VOQRa&:
25X
I
Approve
t
MISSION/DATE
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
63
CONSTRUCTION STAGE
25X
25X1
Approved For Releaq"009m .ICIA-RDP78T05161A001000010053-0
For ReleasTOp0WgT
OLOVYANNAYA ICBM COMPLEX
SITE CONSTRUCTION STATUS
57?30?-
Approved
55?45-
1
For ReleaseTp3 * IA-RDP78T0516
PERM
ICBM COMPLEX
41
10053-0
Approved For Releas1. 93,jq,9J. IA-RDP78T05161 A001000010053-0
Approve
1
For Relea03`.
61A0010000 0053-0 25X
CIA PIR-71005
PERM ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
f
f
1
t
LAUNCH SITE
G1+
G2
G3
G4
G5
G6
G7
G8
G9
G10
PREVIOUS DESIGNATION
7+
20
12
15 .
1
1
8
14.
2
TDI SITE DESIGNATION
18
1 _
L15_
12
20
11
MISSION/DATE
CONSTRUCTION STAGE
ID
ID
9
ID
TT)
9
TT)
TT)
TT)
TT)
ID
TT)
TT)
TT)
TT)
II)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
TT)
C
6a
C
TT)
C
C
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X
25X
I Approved For RelealQP0&kQ :ICIA-RDP78T05161A001000010053-0
Approved
For ReIeaseT?W3?KVW1 A-RDP78TO51
053-0
cIA./PIR-71005
F
1
PERM ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
,
TDI SITE DESIGNATION
2
30
1
32
33
34+
36
37
40
42
MISSION/DATE
CONSTRUCTION STAGE
i
ID
ID
ID
ID
ID
ID
ID
ID
ID
D
ID
ID
9
9
9
9
9
9
7
ID
ID
'
7
7
ID
i
i
ID
ID
ID
ID
1
i
2,J
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Release1Z p3I QRE IA-RDP78T05161A001000010053-0 2f
Approved If
or ReleasTOP/RT
IA-RDP78T051 1A00100001 053-0 25X
CIA PIR-71005
PERM ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
t
LAUNCH SITE
I1+
12
I
14
I
16
17
18
I
I10
PREVIOUS DESIGNATION
16
10
1
18
TDI SITE DESIGNATION
0
1
8
41
16
4
22
8
2
MISSION/DATE
CON
STRU
CTION
STA
GE
9
9
9
ID
ID
ID
ID
ID
ID
9
9
TD
-9--
9
9
ID
9
ID
ID
9
ID
9
ID
6B
9
9
9
9
9
9
9
9
9
TT)
ID
ID
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For ReleasIQB0 '6GR T IA-RDP78T05161 4001000 10053-0
25X
Approves
For Releaserff3:
1A001000010 -
'~IA PIR-71005
PERM ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
Jl+
J2
IAD
oss
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
4
1
4
4
5
58
46
, 48
2*
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
5
TT)
9
T1)
11)
TD
TT)
TT)
TT)
TT)
TT)
TT)
TT)
7n
TT)
TT)
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
IAD possible site is located at 57-28-30N 56-41-30E.
Approved For ReleasT SKKT A-RDP78TO5161A001000010053-0
i
Approvefd
For Releasyop03J, QERET
IA-RDP78TO51 1A0010001 0053-0 25X1
C PIR-
t
127?45-
SVOBODNYY
ICBM COMPLEX
128?00- 128?15- 128-30-
0 \ AIRFIELD?
25
27
SVOBODNYY
25X
Approved For ReIeas 90ife IA-RDP78T05161A001000010053-0
Approved
:or Releasp909r9 f91
SVOBODNYY ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
10
11
12
14
1
16
1
21
22
23
MISSION/DATE
CONSTRUCTION STAGE
T"D
ID
7
9
9
4
ID
ID
ID
7
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Sites 10, 11, 14, 15 and 23 were negated on
t
2t
2
Approved For Releas GPOSEj3 T IA-RDP78T05161A001000010053-0
Approve For Releaser&3 IA-RDP78T05161A001000010053-0 25X1
SVOBODNYY ICBM COMPLEX
SITE CONSTRUCTION STATUS
MISSION/DATE
1
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
CONSTRUCTION STAGE
25X
Approved For Releas(T@A&RETdIA-RDP78T05161A001000010053-0
SVOBODNYY ICBM COMPLD
SITE CONSTRUCTION STATUS
pprov
d For Relea 1 GO SE CET
MISSION/DATE
CIA IMAGERY ANALYSIS DIVISION
1
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
A00100001903-CI 21
29
CONSTRUCTION STAGE
Approved For Releas UPO P eT
t
I
45000 45?15'
TATISHCHEVO
ICBM COMPLEX
Approved F
or ReleaseT&3ftkW
IA-RDP78T0516 A001000010
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
t
I
LAUNCH SITE
X+
A1+
A2
A3
A4
A5
A6
A7
A8
A9
Al0
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
1
2
3
11
5
6
8
10
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
9
9
R
TT)
TT)
TT)
r
TT)
TT)
TT)
TT)
TT)
Tp
9
TT)
TT)
TT)
T1)
Tl~
Tl~
TT)
TT)
ID
TT)
T-D
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
2?Xl
25X
Approved For ReleaseT B3&9fETCIA-RDP78T05161A001000010053-0
Approved F
r ReleasTOPOIWRET IA-RDP78TO51 lAO0100001
TAT I S HCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
B1
B2+
B
B4
B
BE
B
B8
B
B10
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
14
12
17
15
16
19
13
29
21
30
MISSION/DATE
CONSTRUCTION STAGE
ID
IT)
TD
TT)
Tn
ID
ID
9
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Releas OP05?ET
Approved
33jk7RETcIA-RDP78TO51
lAO0100001 053-0 ~~((1
CIA. PIR-71005
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
C1
C2
C3
CSI
C5+
C6
C7
C8
C
Cl0
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
20
28
25
27
26
22
24
32
57
56
MISSION/DATE
CON
STRU
CTIO
N STA
GE
6A
TT)
ip
9
6-R
Tp
6A
TT)
TT)
9
6B
6A
ID
6A
6$
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X
Approved For ReleasTGRoMMET
Approved
For ReleasTOPOI t1RET IA-RDP78T05161A001000010053-0 21(
-105
TAT I SHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
Dl
D2
D
D4*
D5*
D6+
D
D8
D
D10
PREVIOUS DESIGNATION
C10
TDI SITE DESIGNATION
38
140 1
39
41
42
36
73
72
54
37
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
TT)
TT)
TD
TT)
7
6B
ID
11)
ID
ID
ID
ID
ID
6B
ID
ID
ID
TT)
TT)
ID
-R
TT)
IT)
IT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
1
I
2t1
Approved For Release?f033g~.1~T IA-RDP78T05161A001000010053-0
Approveq
For Releasq
-SW k. IA-RDP78TO5161AO01000010053-0 25X
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
t
LAUNCH SITE
El*
E3
E4+
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
4
82*
147
1 77
76*
94*
MISSION/DATE
ID
ID
TD
ID
5
CON
N
ID
ID
6-R
STRU
ID
CTION
ID
STA
GE
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Contro! site
REMARKS: Site El was negated on
25X
25X
Approved For ReleasiOlb j-&&jR(T~IA-RDP78T05161A001000010053-0
Appruve
For Releasl,,3rf A-RDP78T0516
A00100001 053-0
C IA/ PIR- 7-1770-5
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
Fl+
F2*
F3
F4-
F5*
F6-
F7*
F$-
F
F10
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
58
59
51
89
61
62
63
65
66
90
MISSION/DATE
CON
STRU
CTION
STA
GE
TT)
Tn
TD
TD
TD
TT)
TT)
TT)
ID
11)
ID
ID
46B
ID
ID
ID
ID
ID
ID
ID
ID
ID
TT)
TT)
TT)
TT)
TT)
TT) I
I
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: All sites in the group were negated on
except 89 and 90 on
u
Approved For ReleasIg1033 RETFIA-RDP78T05161A001000010053-0
1
25X
Approved
For Releasertpl. IA-RDP78T05161A001000010053-0
- 5
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
G1+
G
G4-*
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
67 1
1
70
71
88*
75*
92
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
7
4B
ID
ID
ID
ID
ID
ID
TT)
I TT)
ID
* Probable site
** Possible site
*** Suspect site
N Negation
REMARKS: Sites G1 and G3 were negated on
Site 88 was negated on F
25X
25X
ID Identification only
C Completed site
+ Control site
25X
Approved For ReleaseTfiB3&6?E IA-RDP78TO5161A001000010053-0
Approve
For ReleasTOPO a lRET
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
0053-0
CIA/PIR-71005
LAUNCH SITE
Hl+
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
81
80*
195*
6
MISSION/DATE
N
TT)
CON
1
STRU
CTIO
N STA
GE
* Probable site
REMARKS: Hl was negated on
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For ReIea*M03 R@T
25X
I
Approved If
or ReleaseTQD3SWTc1
CIA IMAGERY ANALYSIS DIVISION
TATISHCHEVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
+
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
91
86*
83
84
85*
93*
74
MISSION/DATE
Ti)
TT)
TT)
T-n
11)
TT)
CON
ID
7
STRU
N
TT)
CTION
ID
Tn
STA
ID
-M
GE
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: 'Sites 91, 84, 83, 93, 86, and 74 were negated
Approved For Releas~E003)09i8'(!-T A-RDP78TO5161A001000010053-0
Approve
Id For ReleasyGPOSEERET
TYURATAM MISSILE TEST CENTER
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
2
TDI SITE DESIGNATION
Il+
14
15
1 Kl
K2
K3+
16
12
I
Ml
DR-
1-M3
MISSION/DATE
CON
STRU
CTION
STA
GE
9
6B
9
ID
ID
ID
ID
8
3
3
ID
ID
ID
ID
-
......
......
......
.......
......
.......
......
.......
.v:.Uutv::
............
.
.
.
.
.
.
.
...........
......
.......
......
.......
......
.......
...........
...........
...........
.
.
.
.
.
............
............
............
...........
............
............
............
...........
...........
...........
...........
............
............
............
r.
P
f,
ID
3
3
ID
ID
ID
ID
ID
ID
:.
I.
-0
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Sites Il, 14, and 15 were complete on
Control Facilities at I1 were complet
Approved For Releas BOSGA51
11
Approved F
pr Release 35"E A-RDP78T051
TYU RATA M MISSILE TEST CENTER
SITE CONSTRUCTION STATUS
t
LAUNCH SITE
PREVIOUS DESIGNATION
G8
G9
K3
TDI SITE DESIGNATION
N2
N3
1
Ll
L2
L3
L4
L5
L6
L7
L8
L9
L10
MISSION/DATE
CON
STRU
C
C
CTION
STA
GE
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Site Ni was complete on ~
and N3 were complete on
Sites N2 25X1
25X1
' Approved For ReleasEM3, $ ET IA-RDP78TO5161AO01000010053-0
xi
Approvo
d For Relea pOSfeWFq :
161AOO10 0010053-0
CIA PIR-71005
Approved For Rele WOp ( ( f :
Approved
or Releasd'l3 A-RDP78T0516
UZHUR ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
+
A2
A~
A4
A9
L(L
R1 +
'RP
m
R4
i3q
-R6
PREVIOUS DESIGNATION
-
-
TDI SITE DESIGNATION
MISSION/DATE
CONSTRUCTION STAGE
ID
C
TT)
T7)
TT)
ID
ID
4A
4
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Release %003 9T:IA-RDP78T05161A001000010053-0
Approved
For Releas POSTE eT
UZHUR ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
C1+
C2
C
C4
C
C6
X+
PREVIOUS DESIGNATION
L
P
R
0
M
S
TDI SITE DESIGNATION
12
16
18
17
15
13
19
MISSION/DATE
CON
STRU
CTION
STA
GE
ID
ID
ID
ID
ID
ID
ID
TT)
TT)
ID
6B
ID
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X1
Approved For ReleasIQB0:i6RETfIA-RDP78T05161A001000010053-0
For Releastd?0 //e/ t
IA-RDP78T051
UZHUR ICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
PREVIOUS DESIGNATION
T
U
V*
W*-
TDI SITE DESIGNATION
20
21
22
23
MISSION/DATE
CON
STRU
CTION
STA
GE
N
1
N
N
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Site 21 was negated on
Nx1
25X
25X
Approved For Releass0POS?hT
Approved
For ReleasTOPOS/pMgT
IA-RDP78T051
1AO010 0010053-0 21
Approved For Relea pOSTRET
211
Approved
33E ET
YEDROVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
1
1 A001000010053-0
CIA/PIR-71005
LAUNCH SITE
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
11+
10
12
13
1 14
15
1 16
23*
1 24*
2
ID
TT)
6A
413
TT)
ID
N.
TT) I
4A
TT)
I
ID
TT)
5
TT)
I
CON
N
TT)
4A
TT)
STRU
N
TT)
4A
TT)
D
CTION
N
I
4A
TT)
ID
STA
ID
TT)
Tp
TT)
GE
N
1
Tp
TT)
N
1
Tp
Ti)
TT)
-u
Ti~
TT)
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
REMARKS: Sites 11, 12, 16, and 25 were negated on
Site 24 was negated on
Approved For Releaslopo gs/l T A-RDP78TO5161AO01000010053-0
Approved
For ReleasTOP3WRET
PIR-71005
YEDROVO ICBM COMPLEX
SITE CONSTRUCTION STATUS
MISSION/DATE
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
CONSTRUCTION STAGE
Approved For ReleaiTM YKRET
2f
Approved F
pr Releas 0 OPT
IA-RDP78T05161 A001000010053-0
25X1
25X
I Approved For Releas 900feffT ILIA-RDP78T05161A001000010053-0
Approve
For Releastdftee T
ZHANGH IZ TOBEICBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
A1+
A2
A
A4
A
A6
B1+
B2
B
B4
B
B6
PREVIOUS DESIGNATION
A
B
E
F
D
C
J
K
L
H
I
G
TDI SITE DESIGNATION
1
2
6
4
10
11
12
8
MISSION/DATE
CON
STRU
CTION
STA
GE
9
8
6
4
6A
9
A
4B
TD
N
4A
4A
ID
ID
6B
ID
ID
ID
ID
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
Approved For Releas 90g 9 9T PIA-RDP78TO5161AO01000010053-0
1
25X
I
25X1
Approved If
or ReleaserUD3 .lC A-RDP78T05161A001000010053-0
ZHANGHIZ TOBEACBM COMPLEX
SITE CONSTRUCTION STATUS
LAUNCH SITE
C1+
C2
C3
C4
C5
C6
PREVIOUS DESIGNATION
TDI SITE DESIGNATION
MISSION/DATE
CON
STRU
CTION
STA
GE
TT)
TT)
I
46B
3
3
3
L
-
I
-
* Probable site
** Possible site
*** Suspect site
N Negation
ID Identification only
C Completed site
+ Control site
25X
Approved For ReleasJOR
399MTdIA-RDP78T05161 A001000010053-0
Approved For Release TOl?/3SEfTT05161A001000010053-0
1
1
Approved For Release JOQ!/3c.T8TOSl6lAOOlOOOOlOOS3-O