CHINESE POWER PLANTS SHANSI PROVINCE

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A001100010049-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
32
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 3, 2003
Sequence Number: 
49
Case Number: 
Publication Date: 
July 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A001100010049-4.pdf2.86 MB
Body: 
E POWER PLANTS SU P!CVU\CE ALYSIS 0"ISION 25X1 25X1 DATE JULY 1966 GROUP 1 E.clvded Irom w ?' -~' rPOO 59CR COPY de.+n9~adin9 and deco:eii ~a~.en PAGES 24 Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Declass Review by NIMA / DOD L !vlI~AGERY Approved For Release 2003/W Q : CIA-RDP78TO5161AO01100010049-4 Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Approved Foj Release 20,059: ~C:1 RDP78T05161 001100010049-4 25X1 25X1 25X1 CHINESE POWER PLANTS (A) (B) Chang-chih Thermal Power Plan Tad-yuan Thermal Power Plant t No. 1 (C) Tai-yuan Thermal Power Plant No. 2 (D) Tai-yuan Thermal Power Plant (Steel Works Plant No. 2) (E) Ta-tung Thermal Power Plant (Ping-wa.ng) REQUIREMENT C-RR5-83,218 CIA/IAD PROJECT 30647-6 25X1 Approved For Release 2q*,A6 RM 25X1 25X1 25X1 25X1 25X1 Chiu- ' t'ung-ch'uan San\yuan (II' Tung- 'uan probe \,\ Sui-te Release 200 Wu-ch'uan Ku-yang Hu-ho-hao-t'e (Kuei-syi D TOP SECRET Hsu-ch'ang Ping-Ling-shan (Chu-ko-miao) Lo yang CHE,NG HOU (CHENG-F SIEN) hang-pei Kalgan Chang-Chia-k ou) / ~Hsuan hua ,, K'ai-feng Shang-cnm (Chu-ch Shang-shui Chou-chia-k'ou 1100010149 4 Fou-yang Te-chou (Te-hsien) Hsie- en-ya Huang-lin itav vd For Rel T IENTSIN f> Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 A Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Approved For Release 2bII3/OWRE A 25X1 25X1 25X1 CHI.NG-CIIIH THERMAL POWER PLANT NPIC NUMBER - 20-E The Chang-chih Thermal Power Plant is located approximately 8.0 nm north of Chang-chih at coordinates 36 19 small reservoir on the Cho-chang-nai Yuan 50N - 113 (River). 04 40E a nd east of a The plant is coal operated, rail served and consists of an integrated control house with five connecting transformers, large substation, switching building, five spray ponds, coal conveyor, and the usual support/storage buildings. An ash disposal area is located just northeast of the powerhouse. The boilerhouce appears to have been expanded twice with a resultant variance in boiler section design. The northern section is served by free-standing masonry stacks C and D, and possibly houses three or four bciler units; the southern section has two smaller free-standing masonry stacks (A and B) and may have three smaller boiler units. A more definitive analysis of the boilerhouse construction was impossible using available coverage. The generator hall is of uniform design and is equipped with two longitudinal monitors. A control house is contiguous to the western side and southern end of the generator hall; five transformers are linked to the control house, suggesting five operable generator units. The only construction during the period 25X1 25X1 Approved For Release 2gIDFD6&&:"_4 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 200$P06$$OR IA-RDP78 05161AO0110001 25X1 Approved For Release 200,31"(WW E 05161A001100010049-4 Approved For Release 2Q031067ZD R&I Preparation for the addition of spray pond E is apparent. Heavy smoke from stack D. Moderate smoke from stack C. Spray ponds A. and B are filled but not in operation. Spray ponds C and D show dense vapor. Light smoke from stacks C and D. Eight sprinkler units are in operation in the spray ponds. 25X1 25X1 25X1 25X1 No apparent change. Spray pond E is completed and in operation. Approved For Release 2bGRO&E?REIiA Light smoke from stacks C and D. Spray ponds A and B are empty. Four sprinkler units are in operation in spray ponds C and D. Light smoke from stacks C and D. Possible light smoke from stacks A and B. Fourteen sprinkler units are in operation in the spray ponds. 25X1 Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 B Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Approve For Release 2MI06/'2RTA TAI-YUAN THERMAL POWER PLANT NO. 1 1QPIG' Tai-yuan Thermal Power Plant No. 1 is located 4.0 nm west of Tai-yuan Strip Airfield at coordinates 37 46 35N - 112 28 20E. The facility is coal-operated, rail-served and includes a sub-station with five transformers (three large and two medium), three possible small transformers, two control houses, eight small oil-storage tanks, three spray ponds, extensive coal handling and treatment facilities, and numerous support/storage buildings of undetermined function. The boilerhouse consists of two distinct sections with nine operable boiler units and one boiler unit under construction. The older section ha.s seven metal roof-stacks and seven small dust-catchers suggesting seven units; the newer and expanding section consists of two larger completed units with framework for a third unit. The completed units are each equipped with a. large dust-catcher and connected by four-duct flues to masonry stack H. There were five visible sets of power cables leading from the generator hall to the control house Two new boiler units and one new generator hall section were completed during the period 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 2TObIfiE(REJTk-DP78TO5161AO01100010049-4 25X1 25X1 25X1 Approved For Release 2 25X1 25X1 25X1 Approved For Release 20 TOP SECRETI Approved For Release 2 6m405161A0011000100 25X1 25X1 25X1 Approved For Release 2003/06/ 25X1 25X1 25X1 25X1 Approved Fo ~ Release 2(T~Th6SCREZ 25X1 25X1 25X1 Uprights for additions to boilerhouse and generator hall are evident. Masonry stack H is complete, but has no flues or ducts in- stalled. Poor quality photography precludes fur- ther analysis. Sides and roof for two boiler units are complete; two dust-catchers are vis- ible on these two new units Minor roofing has occurred on the generator hall. Heavy smoke from plant pre- cludes analysis. No change Heavy smoke from stacks A. B, F and G. Moderate smoke from stacks D, E, and possibly F. Spray pond appears empty. Moderate smoke from stacks A.J. B, C, D, E, F, and G. Spray ponds are empty. Heavy smoke from plant precludes ana.lysis. Spray ponds appear empty. Moderate smoke from stacks A, B, C, D, and E. Possibly stacks F and G are smoking also but smoke precludes analysis. Spray ponds A B and C are empty. Obliquity precludes further ana:Lysi Flue system from masonry stack H to the previously noted two new boiler units is evident. Moderate smoke from stacks B, C, E, and G. Heavy smoke from stack H. Spray ponds A and B appear empty. C is full but not activated. -)+- 25X1 Approved For Release 2ff~jtkff RDP78TO5161AO01100010049-4 Approved or Release 20bb6?%P9i4IDP78T051 25X1 25X1 25X1 TAI-YUAN THERMAL POWER PLANT NO. 1 Several small support buildings are added. None apparent. None apparent. Heavy smoke from stacks preclude analysis. Spray ponds are empty. Heavy smoke precludes a.na.lysis. Spray pond A is empty. Moderate smoke from stacks H, D, E, F, and G. Light smoke from stacks A. BY and C. Spray ponds A. B, and C are empty. 25X1 -5- 25X1 Approved For Release 2 Off (R -RDP78T05161A001100010049-4 Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 C Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Approved For Release ZO'03IO 2DR U TAI-YUAN THERMAL POWER PLANT NO. 2 F I RVIL; Tai-yua.n Thermal Power Plant No. 2 is located west of the Tai-yuan Explosives Ib.nufacturing Plant at coordinates 37 59 20N - 112 31 10E. The plant is rail-served, coal-operated, and includes a sub-station with a control house and three large transformers, three probable transformers, six small oil storage tanks, three reinforced concrete or masonry cooling towers, a, fourth cooling tower under construction, coal conveyor and processing facilities, and numerous support/storage buildings. The powerhouse is being expanded and apparently consists of three operable boiler-generator units. The boilerhouse is equipped with three sets of dust-catchers and is connected by three complete sets of flues to masonry stack A the boilerhouse could accommodate at least two additional boiler er units, but no dust-catchers had been installed and the flue systems were incomplete. One of the incomplete boiler sections will connect to stack A; a fourth set.of flues is already partially completed to stack A. The remaining section and others that will be added will be connected to a second stack (B). Foundations for new stack B and additions to the boilerhouse and generator hall are under construction. Two visible sets'of three-cable power leads connect the generator hall and sub-station. the period Construction of foundations for stack B and a new cooling tower (D) plus considerable continuing expansion of the powerhouse occurred during - 6- Approved For Release 2(f 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 20 03/ / CR94%-RDP78T051$ 25X1 Approved For Release 2nnsi7i( Mfi Tb-PnP7RTrjs161A001100010049-4 Approved For Release 20 - 25X1 25X1 Approved For Releas - T05161A001100010049-4 Approve For Release 21 0&E REi -RDP78T051 1A001100010049-4 TAI-YUAN THERMAL POWER PLANT NO. 2 Uprights for probably two boiler units are evident. The western-most section of the generator hall appears to be only partially roofed. Heavy smoke and haze pre- cludes a detailed assess- ment. The generator hail addition .is roofed. Heavy smoke pre- cludes further analysis. No apparent change. No apparent change. Moderate smoke from stack A. Heavy vapor from cooling towers A and B. Very heavy smoke from stack A. Moderate vapor from cooling towers A and B. Moderate smoke from stack A. Light vapor from cooling tower A. and possible light vapor from cooling tower B. Moderate smoke from stack A. Light vapor from cooling towers All BY and C. No apparent change. Moderate smoke from stack A. Moderate vapor from cooling towers A, B. and C. -7- Approved For Release fpm/QF~f :~Cl -RDP78T05161A001100010049-4 Approved For 4elease 20J 6/9:kT4 Wall for a fourth boiler unit is under construction. 25X1 25X1 25X1 The southern side of the boilerhouse addition is apparently complete; the section, however, is not roofed. TAI-YUAN THERMAL POWER PLANT NO. 2 Moderate smoke from stack A. Moderate vapor from cooling towers Ajo B. and C. Moderate smoke from stack A. Moderate vapor from cooling towers A.) BI, and C. The new boilerhouse addition Moderate smoke from stack A. appears to be largely com- Light vapor from cooling towers plete. The section is roof- Al B. and C. ed, except for a small area. at the open east end. Foundations for more ex- pansion of the boilerhouse and generator hall are evident. Also, foundations for a. new stack (B) and cooling tower (D) are prese . 25X1 25X1 no Approved For Release QR/0S R [P1-RDP78T05161A001100010049-4 Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 D Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Approve d For Release 2'03/OAWIA 25X1 25X1 25X1 (STEEL WORKS PLANT NO. 2) Tai-yuan Thermal Power Plant is located in the southern sector of the Tai-yuan Iron and Steel Complex at coordinates 37 55 1ON - 112 32 19E. The facility is rail-served, coal-operated, and includes three spray ponds, three oil storage tanks, coal conveyor system, and numerous support/storage buildings. A. pipeline connects the plant with the blast furnace and coke oven sections, indicating that the power plant may use gas as an alternate fuel. The boilerhouse contains four dust catcher units, and four sets of ducts, suggesting that four boiler units are installed. No power cables or switching facilities are apparent. The three small sections extending from the eastern side of the generator hall may serve as control facilities. A steam line leads from the power plant to the steel works. There has been no new construction during the period 25X1 25X1 25X1 Approved For Release 2TC#b(8Kj1T1 25X1 Approved For Release 2 TAI YUAN THERMAL POWFR PLANT (STEEL WORKS PLANT NO. 2) Approved For Release 200 RE? A-RDP78 Approved ~ or Release 203/OXRTA TAI - YUAN THERMAL POWER PLANT (STEEL WORKS PLANT NO. 2) Moderate smoke from stack A. Spray ponds A, B, and C appear activated. Moderate smoke from stack A. Spray ponds B and C are activated. 25X1 25X1 25X1 25X1 Light smoke from stack A. Spray pond A appears activated; spray ponds B and C are empty. Moderate smoke from stack A. Spray ponds A., B, and C are activated. Light smoke from stack A. Spray ponds A. B.9 and C are activated. Light smoke from stack A. Spray ponds are apparently inactive. 25X1 Approved For Release 20 6 EC -F DP78T05161A001100010049-4 Approve For Release 206&bCkff- TAI-YUAN THERMAL POWER PLANT (STEEL WORKS PLANT NO. 2) Moderate smoke from stack A. Spray ponds A, B. and C are activated. -11- Approved For Release 2~A3/0~/~~RGIA RDP78TO5161AO01100010049-4 Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 E Approved For Release 2003/06/20 : CIA-RDP78TO5161AO01100010049-4 Approved f{ or Release 20 1067ZCT: CI RDP78TO51 25X1 25X1 25X1 TA-TUNG THERMAL POWER PLANT (PING-WANG) F The Ta-tung Thermal Power Plant is located !.0 nm southwest of Ta-tung on the west bank of the Shih-li Ho (River) at coordinates 240 03 50N - 113 12 20E. The plant is coal-operated, rail-served and consists of a sub-station with five probable transformers, two integrated control houses, a natural draft cooling tower, sedimentation pond, seven spray ponds, three probable oil storage tanks, a canal network for utilization of water, and numerous support/storage buildings. A steam line leads eastward to the Ta-tung Locomotive Factory and a second line leads southward to the possible Ta-tung Diesel Engine Plant. The powerhouse consists of an old section equipped with roof stacks Aand B, a recently completed center section with probably three operable boiler-generator units (served by stack C), and an expanding western section which may house four boiler-generator units when completed. The generator hall has no power cables visible and there are no other indications of the number of operable generator units. Considerable expansion occurred during the period Ito include the completion of one of er-genera or uni , extension o the generator hall and control house, and completion of walls for three additional boiler units. Approved For Release 27QP(SK" 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 2003/69P26Ef@flJl 25X1 TA-TUNG THERMAL POWER PLANT (PING-WANG 25X1 25X1 25X1 Approved For Release 2 TOP SECRET Approved For Release TA TUUN: x THERMAL POWER PLANT (PING-WANG) 25X1 25X1 25X1 25X1 Approved For Release 20 25X1 25X1 Approved Ff or Release 2&GR 6 RX TA-TUNG THERMAL POWER PLANT (PING-WANG) Powerhouse is expanding. The plant presently consists of an old section of probably two units (served by stacks A and B) and a newer section of about three larger units (served by stack C). A second masonry stack (A) is complete but not connected. Uprights for the addition of perhaps two more boiler units are evident. Obliquity pre- cludes further analysis. Obliquity precludes analysis. No apparent change Walls are in place for one unit addition to the gen- erator hall. Integrated control house has been ex- panded along the above new generator hall unit. (Roof is complete on one new (boiler unit. -13- Appears to be light smoke from stack A. Light vapor from cooling tower A. Five units are in operation in spray ponds A. B1 C. and D. Four Of units are in operation in spray ponds E' F. and G. Light smoke from stack A. Five units in operation in spray ponds Al BY C. and D. Four units in operation in spray ponds E. F. and G. No smoke/vapor observed. Four units in operation in spray ponds A) B, C. and D. Four units in operation in spray ponds E, F, and G. Light smoke from stack A. Five units are in operation in spray ponds AJ. B1 C. and D. Four units are in operation in spray ponds El F. and G. Light smoke from stack A. Possible light smoke from stack C. Five units are in operation in spray ponds A. B, C. and D. Four units are in operation in spray ponds E, F. and G. Approved For Release f&/jfa:E-CIj-RDP78T05161A001100010049-4 Approved F TA-TUNG THERMAL POWER PLANT (PING-WANG) CIA IMAGERY ANALYSIS DIVISION r Release 20b91b6W'~1"i~i DP78T05161 001100010049-4 Flue is visible leading from stack D to new boiler unit observed Large dust-catcher is installed in the new boiler unit. No apparent change. Wall is complete for two new boiler units. No apparent change. 25X1 25X1 25X1 Light smoke from stacks A. and B. Three units are in operation in 25X1 spray ponds A. B.9 C.9 and D. Four units are in operation in spray ponds EY F.9 and G. Light smoke from stacks A. and C. Five units are in operation in spray ponds A. B) C. and D. Four units are in operation in spray ponds E. F. and G. Very light smoke from stacks A and C. Light smoke from stacks A.and B. Five units in operation in spray ponds A, B~ Cl and D. Four units in operation in spray ponds E. F.9 and G. -14+- Approved For Release REIF -RDP78T05161A001100010049-4 25X1 25X1 Approved For Release 2003/06/25ECU76T05161A001100010049-4 Approved For Release 2D03/06/2059 A=RDFT8T05161A001100010049-4