25X1 gpproved For Release 2003/03/04 :CIA-RDP78T05161A001200010031-2
Approved For Release 2003/03/04 :CIA-RDP78T05161A001200010031-2
RECORD
COPY
COPY N0.
PUB. DATE
LOCATION
MASTER DATE RECEIVED LOCATION
~I~P. ~T
? b
STOCK MINIMUM MAXIMUM ~v
CUT TO
COPIES Q
DATE
1-73 ~
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
NUMBER OF COPIES
M0.
DAY
YR.
RECEIVED OR ISSUED
REC D
ISS~D
BAl
M0.
DAY
YR.
RECEIVED OR ISSUED
RECD
ISS~D
8AL
~!
!~
6`~
,U Pic ~ /S S
to
~
'
~" Old
~
_ _
TITLE ~ SEC. LA S. A I j
1 N?~. TS ~~~~-~' 25X1
25X1
Approved I{
or Release 20/g~~~ DP78T
strutted of approximately 4,500 linear feet of
masonry and 41,500 linear feet of wire. Figures
KIYEV AIRCRAFT ASSEMBLY PLANT NO 413
KIYEV, USSR
Kiyev Aircraft Assembly Plant No 473
is located approximately
25X15 nautical miles west of the Dnepr River in the
northwest suburbs of Kiyev, USSR, at 50-27-40N
30-23-29E (Figure 1). The plant is adjacent to
Kiyev/Svyatoshino Airfield
which serves the plant as a test and flyaway
25X1 field. The plant is both road and rail served,
with approximately 3,500 linear feet of track
and approximately 16,100 linear feet of hard-
surfaced road, approximately 20 feet in width,
within the plant boundaries. The fence/wall
surrounding the plant area appears to be con-
-1-
Approved For Release 2~~3
2 and 3 show the plant as it appeared in
5161A001200 10031-2 25X1
CIA/PIR-7504925X1
0
Figure 4 shows the plant i~nd
includes a layout drawing of plant facilities,
with item numbers keyed to Table 1.
Kiyev Assembly Plant No 473 was con-
structed in 1918 and possibly was utilized as an
aircraft plant from its beginning. ~ as
the Germans approached, the machinery of the
plant was dismaritled and evacuated to Novosi-
birsk, USSR. During World War II the plant
suffered extensive damage, with estimates
~--~~ Railroad, double track
~-T- Railroad, single track
Road
Bridge
25X1
25X1
25X1
25X1
25X1
25X1
~pprayed For Release 2QQ~0~3~0/~R -RDP78 05161A00120001
0031-2
CIA/PIR-7504925X1
25X
25X1
Approved For Release 2~~b3~~~1;~
25X1
25X1
25X1
Approved
25X1
25X1
2~XT1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Reconstruction of the plant began
construction materials and
machinery were shipped to the site of Plant No
473 from the dismantled German Arado Airframe
Plant, Reconstruction of the facility as it
formerly existed was probably completed by
(Figure 4).
have continued
Analysis of
phy 0 indicated a total roof area of
approximately 310,000 square feet. The total
floorspace of the plant as of 1945 was estimated
to have been slightly less than 360,000 square
feet; Othe total floorspace was enlarged
to an estimated 890,000 square feet and an
estimated 760,000 square feet of roof cover. 2/
When observed on 0 photography of
the aircraft assembly plant contained
approximately 1,383,500 square feet of floor-
space, and analysis of ho-
tography revealed that the total floorspace had
increased to approximately 2,007,500 square
feet. Estimates made fro~photogra-
phy ofOgave the total floorspace as
approximately and the
L/ but new construction projects
revealed the total floorspace to be
approximately (Figure 4).
The fluctuation in the estimated floorspace fig-
ure reflects adifference
in method of estimation fig-
ures are based on floorspace estimates including
the several stories of the various administration
25X1 buildings; the Qfigure is based on roof cover
25X1
25X1
25X1
alone. The latest figures include an area on the
northwest side of the plant which is considered to
be a support area.
For Release 2~~3~~~1
damaged during World War II were razed com-
pletely and supplanted with new and larger
structures. at leastL
major buildings and 1 addition were constructed.
The addition was to the south side of the work-
shop/machine shop (item 1); theL new buildings
were the administration building (item 2) andthe
machine shop (item 5). The engineering/sub-
assembly/final assembly building (item 10)
appeared to have been completed by the spring
The south portion of another large
031-2
building, the final assembly/subassembly build-
ing (item 13), was under construction in
early 0 ?/
A comparison of the photography
with that of revealed much new
construction; a subassembly building/machine
shop (item 9), a workshop (item 12), a warehouse
(item 16), and an addition to the transshipment
building (item 14) were completed. Construction
in progress on these buildings was evident on
photography and
(item 8) were under way by
progress on an addition to the
final assembly/subassembly building (item 13)
was visible; this building was
completed, as well as additions to the forge/
foundry (item 8) and the foundry/steamplant
(item 7). At this time construction could also
be seen on the POL storage area (Figure 4) in
the northwest area of the plant.
Completed0 were 2 warehouses
(item 19), a workshop/warehouse (item 15), the
probable transshipment section of the machine
shop (item 5), and the repair/maintenance
building (iteml1); under construction by this
time were the probable assembly building (item
17), a small building to the north of the assembly
building, and an addition to the warehouse
complex (item 19).
Kiyev/Svyatoshino Airfield serves the plant
Plant No 473 has undergone a construction
program of great proportions. Many of the
buildings built before ~~ and destroyed or
Approved For Release 2~Q~~~~~~-
25X1
25X1
25X
25X
25X
25X
25X1
25X
25X
25X
25X
25X
25X
25X1 Appr ved For Release 2~0~(p~R -RDP78 05161A0012000 0031-2 25X
CIA/PIR-75049 25X1
25X1
as a test and flyaway field. The airfield has a approximately 1,334,025 square feet; one of the
northwest/southeast concrete runway measuring
located at the north end of the runway. Aircraft
taxiways connects with tl~eplant. Approximately
25X1 was in an early stage of construction
~~and appeared to be complete in
25X1
25X1
25X1
25X
25X1
observed at the field on ~ncluded 2
The airfield is served by taxiways and CAT/CUB and 10 COKE.
parking aprons, apparently concrete, totaling
T?ble 1.. Descriytion o~ F?cilities ?t Kiyev Aircraft Assemb,7y Pl?nt Nc 1~~3
(ltem numbers ?re Keyecl to Figure !r)
25X
1 Workshop/machine shop
2 Admin bldg
3 Workshop/machine shop
4 Workshop/machine shop
5 Machine shop with prob transshipment section
6 Workshop
7 Foundry/steamplant
8 Forge/foundry
9 Subassembly bldg/machine shop
10 Engineering/subassembly/final assembly bldg
11 .Admin/engineering bldg
12 Workshop
13 Final assembly/subassembly bldg
1? Transshipment bldg
15 Workshop/warehouse
16 Warehouse
17 Probable assembly bldg, u/c
18 Final checkout hangar
19 Warehouses (2)
20 Storage bldgs (4)
21 Repair/maintenance bldg
Total floorspace & cubic feet of numbered bldgs
Total floorspace & cubic feet of other bldgs
DIIIENSION5 (ft)
(see note)
L 11' H
FLOORSPACE
(sq ft)
NOTE--1i'ith the exception of those heights marked with an asterisk(*), all measurements were calculated by NPIC/TID;
these measurements are accurate to within ?5 ft or 5%, whichever is greater. Measurements were derived from
25X
Approved For Release 2~~103~~~R~I~~DP78T05161A001200010031-2
5X1
Railroad, double track
Railroad, single track
Road
Wa I I
Building under construction
Approved For Release 2~~~~~R~1~,
Approved For Release 20~~3fy~~~-f~
Indicates construction
prior to~~
25X1
25X1
Approved For Release 2003/03/04 : CIS-R.r.-- ~a?'~ 05161A001200010031-2
TOP SECRET
25X1
MAPS OR CHARTS
SAC. US Air Target Chart, Series 200, Sheet 0233-8HL, 2d ed, May 62, scale 1:200,000 (SECRET)
D
CIA/PIR-75049
Kiyev Airer?ft Assembly Plant No 173, Kiyev, USSR, Sep 65 (TOP SECRET
2. CIA. RR RA-37, Estim?ted Floorspace of Kiev Airfr?me Plant No X73, Aug 58 (SECRET)
TOP SECRET
25X1
25X1
Approved For Release 2003/03/04 :CIA-RDP78T05161A001200010031-2
Approved For Release ~~~/0~*~~~P~T05161A001200010031-2
Approved For Release 200'S/03/O~~~CRDP'78T05161A001200010031-2