PHOTOGRAPHIC INTELLIGENCE REPORT MOSKVA AIRFRAME PLANT FILI 23 MOSKVA, USSR,(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A001200010057-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
10
Document Creation Date:
December 28, 2016
Document Release Date:
February 5, 2003
Sequence Number:
57
Case Number:
Publication Date:
January 1, 1967
Content Type:
IR
File:
Attachment | Size |
---|---|
![]() | 1.37 MB |
Body:
GROUP 1
E.c ludod Iro m
downp~adin9 and doc lo.~ilacorion
G~nl GERY
~ LYS IS
Approved For Release
- ..9.
~;
~~.
ISION
O~OC~G3Q
C~~[vlQl~ QC~pOG3~
25X1
Declass Review by NIMA/DOD
25X1
CIA/PIR -75076
25X1
DATE JANUARY 1967
COPY !~ .: ;
PAGES 7
Approved For Release 2003/03/04 :CIA-RDP78T05161A001200010057-4
~:>
25X1 gpproved For Release 2003/03/04 :CIA-RDP78T05161A001200010057-4
Approved For Release 2003/03/04 :CIA-RDP78T05161A001200010057-4
25X1 '~
Approve
CIA/PIR-75076
25X1
~?~~~w ao~~~a~~ p~a~~ ~o~o ~~
-25X1
Moskva Airframe Plant Fili No 23 (BE No
is located in the western suburbs of
Moskva, USSR, at 55-45-30N 037-20-20E (Fig-
ure 1). The plant is ad'acent to Moscow/Fili
25X1 Airfield and is served by
25X1
major roads and rail spurs.
The plant area is surrounded by 18,000 linear
feet of probable masonry/board wall with guard
towers. There are 10,700 linear feet of rail spurs
and 22,300 linear feet of hard surfaced road,
which is 25 feet wide, within the plant. The pre-
ceding measurements are to be considered as
only approximate. Figures 2, 3, and 4 show the
plant area in respectively.
All item numbers are keyed to Figure 5 which
gives the layout of the plant.
Moskva Airframe Plant Fili No 23, originally
called the "Gorbunov Plant," was built in the
late 1920s or early 1930s. 1/ It was called "Air-
frame Plant No 22" until 1941, when it was par-
tially evacuated. 1/ By late 1942, however, the
plant had been restored sufficiently to operate
and was reopened as "Airframe Plant No 23."
Reconstruction of buildings damaged by
World War II bombings was accomplished in
the early post-war years. 1/ Analysis of ~ 25X1
ea a 25X1
a total estimated roof area of approximately 2.1
million square feet with a floorspace estimated
at 2.4 million square feet. 1 / Nine buildings
constructed between provide an
additional 590,370 square feet of roof cover and
Approved For Relea0~
photography rev
25X1
-2 -
25X1
25X1
25X11
pp~e~ryed For Releasg~~Op~(~Q~:
- 1 A0012000 0057-4
PI - 50 6 5X1
FIGURE 2. MOSKVA AIRFRAME PLANT FILI NO 23, MOSKVA, USSR,
Approved For Relea~~
Appr~
ved For Relea~~0~~1~~~~:
161A00120001 057-4 25X1
CIA/PIR-750 6
25X1 ~ ?~ ~ 25X1
25X1
25X1
Approved For Relea~
25X1
Approved Fo~-
Relea
25X1
25X1
25X1
Table 1. Description, Dimensions, Floorspace, and Cubic Feet of Numbered Structures at Moskva Airframe Plant Fili No 23,
Moskaa, USSR (item numbers are keyed to Figure 5).
Workshop
Addition to workshop u/c
Admin bldg (4 story)
Prob engineering/ R&D bldg
Admin/engineering bldgs (2)
a 2 story
b 3 story
' Admin/engineering bldg u/c
Warehouse/storage bldg
Machine shop/workshop
Warehouse/storage bldg
Workshop
Warehouse
Warehouse
Machine shop/workshop
Machine shop/workshop with prob
hangar at west end
Warehouse/storage bldg
Workshop
Steamplant
Steamplant addition
Workshop
Machine shop/workshop
Machine shop/workshop
Maintenance hangar
Workshop/storage bldg
Final assembly bldg
Workshop/warehouse
Machine shop/workshop
Warehouse
Poss POL pumphouse/compressor
bldg
Admin bldgs (4)
a 1 story
b 2-3 story
c 1 story
d 1 story
Subassembly bldg/machine shop
Poss transshipment bldg
Hangar
Subassembly bldg/machine shop
Workshop
Workshop
Machine shop/workshop
Forge/foundry
Workshop
Workshop
Dimensions (ft)
(see note)
L W H
Total floorspace & cubic feet of numbered buildings
Total floorspace & cubic feet of other buildings
Floorspace
(sq ft)
NOTE--With the exception of those dimensions marked with an asterisk (?), all measurements were calculated by
NPIC TID and are accurate to w' + ft or 10%, whichever is greater. Measurements were derived
from
?Dimensions calculated by CIA/IAD project analyst.
Approved For Relea~RO/~~'~~
25X1
25X1
25X
25X1
ed For Relea~0
1A00120 010057-4 25X1
ci - 25X1
Indicates construction prior to
Indicates construction change
Indicates construction change
w-~
W
MOSCOYd/FILI AIRFIELD
RUNWAY 4,600' X 300'
(APPROX)
olo
Q9
~.-- 12
~-~4
v ~ 12
6 15
5 3 ~ ~ 16 ~~
_w_~ `_
ll'-L-.-_.1 ~
w Q 26
2 c b(j ~+--~
~~ ~`'' w W~p
w-1 "
T~ Railroad
Road
-w- Wall
~__, Under construction
0
p on
313
FIGURE 5. LAYOUT OF MOSKVA AIRFRAME PLANT FILI NO 23.
-5-
Approved For Releas 0~~
~/
29
w C'J 2@ c?~
la
25X1
25X1
25X1
25X1
25X1
25X1
Approve
0~~
712,540 square feet of floorspace. 1/
roof cover was 2.7 million square feet with 3.1
million square feet of floorspace. 2/
including the buildings under construction, was
approximately 3,342,150 square feet. 3/
25X1 From ew
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
building construction included: a warehouse/
storage building (item 5), 2 machine shops/
workshops (items 6 and 12), 2 warehouses (items
9 and 24), an administration building (item 26a),
3 workshops (items 14, 31, and 32), and various
support buildings. Additions to existing buildings,
which were completed by0 were made
at a workshop (item 16), a maintenance hangar
(item 19), and the subassembly building/machine
shop (item 27).
The administration/engineering buildings
(items 2, 4a, and 4b), a warehouse/storage build-
ing (item 7), and a workshop (item 8) were
under construction in~and completed
Construction on another warehouse/storage
building (item 13) was started after
but was completed prior to n a -
dition to a workshop (item 14) was also com-
pleted during this period.
Two additional buildings were under con-
IA-RDP78T051
(item 18), the subassembly building/machine
shop (item 27), and a machine shop/workshop
(item 33) were completed. A workshop (item 1)
was under construction in and
appeared complete by The
machine shop/workshop item was under
' ~---
25X1
the total floorspace in the plant,
struction in~he subassembly building/
machine shop item 30) was completed during
the summer of and the probable engineering/
R&D building (item 3) was completed by
~
etween
... .
25X1
25X1
construction prior to and ap- 25X1
peared complete in uring this time,
2 other buildings were started and completed. A
25X1
warehouse (item 10) was started prior to ~~X~
and appeared complete in a X
machine shop/workshop (item 11) was started 25X1
after and appeared complete by 25X1
25X1
ruction of the steamplant addition (item
15), the workshop addition (item 1), and an ad-
ministration/engineering addition (item 4b) was
commenced prior to photography of
The steamplant (item 15) appeared to be complete
by0 whereas the additions (items 1 and
4b) were still under construction at this time.
Additional construction within the plant
since ~ has increased the total floorspace
to approximately This
floorspace figure incorporates both the areas of
buildings under construction and the areas of
multistory administration/engineering buildings.
Moscow/Fili Airfield, which serves the plant
as a flyaway field, has 1 east-northeast/west-
southwest concrete runway measuring
feet. On~ the following aircraft were
observed at the field: 12 HOOK, 1 BOUNDER,
1 COLT, 2 CREEK.
Approved For Rele
R~~~+~
25X1
25X1
25X1
25X1
25X1
25X1
- 25X
25X1
25X1
25X1
25X1
Appro~
CIA-RDP78T051 1 A00120 10057-4
CIA/ PI R-75076
25X1
MAPS OR CHARTS
ACIC series, scale 1:200,000
DOCUMENTS
1. CIA. RR/RA-20, Estimated Floorspace of Moscow/Fill Airframe Plant No. 23, Oct 57 (SECRET)
2. CIA. PIB-1007 61 Moscow/Fill Airframe Plant No. 23, Moscow, USSR, Jul 61 (SECRET
3. ~PIR-42/64, Moscow Airframe Plant Fili No 23, USSR, Dec 64 (TOP SEGRE'I~
REQUIREMENT
CIA. C-RR6-83,650
PROJECT
31260/66 (partial answer)
Approved For Relea~ 0~~3
25X1
25X1
25X
25X
25X
Approved For Release ~~~{p~,(04~;;I~QI~~05161A001200010057-4
Approved For Release 2~~/04~~~~T05161A001200010057-4