GORKIY SHIPYARD 112 GORKIY, USSR (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A001300010049-2
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
February 24, 2003
Sequence Number:
49
Case Number:
Publication Date:
July 1, 1966
Content Type:
IR
File:
Attachment | Size |
---|---|
![]() | 1.09 MB |
Body:
GOR (D U , USSR
DECLASS REVIEW by NIMA/DOD
GROUP I
E-r d-d from
GORMY S1DPYARL 0112
ISION
25X1
CIA/PIR 77013
25X1
DATE JULY 1966
M" ELr COPES 3
GERY
NIALYSIS
25X1 Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2
Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2
ed For Release 49PO3NRET -RDP78T 5161AO01300010049-2
GORKIY SHIPYARD 112
GOR.KIY, USSR
CIA/FIR- 7
25X1
25X1
25X1
TOP SECRET
25X1
25X1
Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2
Approve
For Release 20?dP3jPCkft ~61AO01300010049-2 25X1
25X1
CTA/PIR-77013
SHIPYARD : GORKIY SHIPYARD 112
LOCATION : GORKIY, USSR
GEO COORDS: 56-22N 043-53E
KEY TO VESSEL ANNOTATIONS
1. Possible transporter dock (could not be measured).
2. Possible transporter dock (visible LOA approx 4401).
3. Unidentified vessel (visible LOA approx 225).
4. Two probable transporter docks (visible LOA of each approx 440').
A. Probable shop type building under construction (length of completed por-
tion approximately 500 feet, width of completed portion approximately
110 feet).
The'roof appears to be approximately three-quarters complete.
B. Large building in a very early stage of construction (overall dimensions
approx 1560' x 405').
Excavations, ground scars, and the partially erected upright supports
indicate that this building will have three large bays. Each bay will
probably be approximately 1235 feet by 135 feet. Ground scars indicate
that approximately 325 feet of the westernmost end of the building will
be structurally different in that the lengthwise axis: of the much nar-
rower bays is perpendicular to the three 1235 foot bays.
If this building is to be a construction hall, the transverser would
have to be extended approximately 700 feet southward and the winch house
would have to be relocated in order to serve all three bays of the con-
struction hall.
25X1
25X1
C. A third bay is being added to the new two-bay construction hall. The
roof of the third bay is approximately one-third complete and structurally
appears identical to the other two hays. 25X1
TOP SECRET
25X1
25X1
Approved For Release 2003/03/28 : CIA-RDP78T05161A001300010049-
25 TOP SECRET = z qz Y D z2 # ; .
Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2
Approved For Release TOP/2SF*%UE T05161AO01300010049-2
r-t.,I,%U.T
TOP SECRET
Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2