GORKIY SHIPYARD 112 GORKIY, USSR (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A001300010049-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 24, 2003
Sequence Number: 
49
Case Number: 
Publication Date: 
July 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A001300010049-2.pdf1.09 MB
Body: 
GOR (D U , USSR DECLASS REVIEW by NIMA/DOD GROUP I E-r d-d from GORMY S1DPYARL 0112 ISION 25X1 CIA/PIR 77013 25X1 DATE JULY 1966 M" ELr COPES 3 GERY NIALYSIS 25X1 Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2 Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2 ed For Release 49PO3NRET -RDP78T 5161AO01300010049-2 GORKIY SHIPYARD 112 GOR.KIY, USSR CIA/FIR- 7 25X1 25X1 25X1 TOP SECRET 25X1 25X1 Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2 Approve For Release 20?dP3jPCkft ~61AO01300010049-2 25X1 25X1 CTA/PIR-77013 SHIPYARD : GORKIY SHIPYARD 112 LOCATION : GORKIY, USSR GEO COORDS: 56-22N 043-53E KEY TO VESSEL ANNOTATIONS 1. Possible transporter dock (could not be measured). 2. Possible transporter dock (visible LOA approx 4401). 3. Unidentified vessel (visible LOA approx 225). 4. Two probable transporter docks (visible LOA of each approx 440'). A. Probable shop type building under construction (length of completed por- tion approximately 500 feet, width of completed portion approximately 110 feet). The'roof appears to be approximately three-quarters complete. B. Large building in a very early stage of construction (overall dimensions approx 1560' x 405'). Excavations, ground scars, and the partially erected upright supports indicate that this building will have three large bays. Each bay will probably be approximately 1235 feet by 135 feet. Ground scars indicate that approximately 325 feet of the westernmost end of the building will be structurally different in that the lengthwise axis: of the much nar- rower bays is perpendicular to the three 1235 foot bays. If this building is to be a construction hall, the transverser would have to be extended approximately 700 feet southward and the winch house would have to be relocated in order to serve all three bays of the con- struction hall. 25X1 25X1 C. A third bay is being added to the new two-bay construction hall. The roof of the third bay is approximately one-third complete and structurally appears identical to the other two hays. 25X1 TOP SECRET 25X1 25X1 Approved For Release 2003/03/28 : CIA-RDP78T05161A001300010049- 25 TOP SECRET = z qz Y D z2 # ; . Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2 Approved For Release TOP/2SF*%UE T05161AO01300010049-2 r-t.,I,%U.T TOP SECRET Approved For Release 2003/03/28 : CIA-RDP78TO5161AO01300010049-2