SOVIET CONSTRUCTION OF NATURAL GAS PIPELINE FROM IRAN

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05162A000100010029-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 2, 2011
Sequence Number: 
29
Case Number: 
Publication Date: 
January 1, 1971
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05162A000100010029-9.pdf146.86 KB
Body: 
Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 2010 NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER PHOTOGRAPHIC INTERPRETATION REPORT SOVIET CONSTRUCTION OF NATURAL GAS PIPELINE FROM IRAN GROUP 1: EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION JANUARY 1971 COPY NO 3 PAGES PIR-068/70 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 TOP SECRET RUFF 1. The USSR section of the natural gas pipeline being constructed from the Aqa Jari oil field in Iran to Kazi-Magomed, USSR, has been studied on KEYHOLE photography to determine its status and course. The pipeline, which will tie into the existing Karadag/Akstafa/Tbilisi gas pipeline, will provide an in- expensive energy source for the economic development of the Transcaucasus region. 2. The USSR section of the pipeline extends 108 nautical miles (nm) from Astara on the Iranian border to a point north of Kazi-Magomed (Figure 1). On KH-4 (search) photography of May 1970, the line appeared generally complete except for a 24-nm section between Prishib and Lenkoran Airfield as well as numerous short segments elsewhere for crossing streams and roads. No branch lines to any of the towns along the course of the line were observed, and no compressor station was yet evident. The exact point north of Kazi-Magomed where the line will join the Karadag/Akstafa/Tbilisi pipeline could not be determined on the photography. The crossing of the Astarachay river from Iran to the western outskirts of Astara was not completed. Meanwhile, the Iranian section of the pipeline, extending 450 nm from Aqa Jari in southern Iran to Astara, is being completed by the National Iranian Oil Company. 3. Analysis of the terrain from photography indicated that there were few problems to cope with in laying the pipeline in the USSR section. The first 18 nm of the pipeline north from Astara crosses cultivated and level land, and further north, in the vicinity of Pensar, it crosses low hills and numerous small intermittent streams. The last, 90-nm leg of the line, from the vicinity of Lenkoran to Kazi-Magomed, crosses terrain that varies only slightly in re- lief. This area is predominantly cultivated and has some marshy areas. The pipeline is not entrenched deeply in the ground and is exposed as it crosses over streams. The highest elevation the pipeline crosses is through a cut on a ridge approximately 280 feet above sea level in the vicinity of Lenkoran. The lowest elevation is approximately 50 feet below sea level at Kazi-Magomed. 4. The early stages of construction on the pipeline began numerous pipe sections, trenching machinery, and support vehicles were observed in a cultivated area at the western edge of Astara and large stockpiles of pipe were observed in the rail yards of Astara and Salyany (Figure 2). a construction unit was observed laying pipe 1.2 nm west of Shaglaser inset, Figure 1). These pipe sections measure 17.0 meters (56 feet 25X1 25X1 25X1 25X1 25X1 25X1 NPIC/IEG/WGD/EURB Project 143261NO - 1 - TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO516 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78T05162A000100010029-9 TOP SECRET RUFF Oys Kllyannskayo Kosa \\.Nosos"yy. APSHERONSKlY P( o,. SUMGAIT \ CY : HTAGF 1 ' s`SUN KARADAG', 'r~ fn,1 OSTROV ri' NARGIN PRISHIB - SALYANY ? U S R \ SHAGLASER SEE INSET A LENKORAN I R A N OSTROV DUVANNYY I !J-LI1JJ J 1 1 1 1~ ~ 1 1 I I I~ 11 1 1 1 t J11 ,:.Y, AIYAT I 1 FIGURE 1. ROUTE OF USSR SECTION OF NATURAL GAS PIPELINE FROM IRAN 2 - TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78T05162A000100010029-9 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78TO5162A000100010029-9 Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78T05162A000100010029-9 TOP SECRET TOP SECRET Sanitized Copy Approved for Release 2011/08/02 : CIA-RDP78T05162A000100010029-9