COMMUNICATIONS SYSTEMS HUNAN PROVINCE, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05162A000300010008-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
9
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 9, 2011
Sequence Number: 
8
Case Number: 
Publication Date: 
December 1, 1972
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05162A000300010008-0.pdf213.7 KB
Body: 
Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 PHOTOGRAPHIC INTERPRETATION REPORT NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER COMMUNICATIONS SYSTEMS HUNAN PROVINCE, CHINA 25X1 DECEMBER 1972 COPY NO. 2 2 7 PAGES P1R-056/72 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78T05162A000300010008-0 25X1 TOP SECRET RUFF COMMUNICATIONS SYSTEMS HUNAN PROVINCE, CHINA TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78T05162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 25X1 TOP SECRET RUFF Yung shun (Ling-,h',) ?10 ~I-Yang 5 Sha-shen-ch? \ Chu cho s (L.-k' Shao-YO \ n9 s h h chenI %Afe ng-s hang C g -t,- -n 9 ung-an P 06VY~ ? RADIO RELAY STATION -- PREVIOUSLY REPORTED TELECOMMUNICATIONS LINE NEWLY IDENTIFIED TELECOMMUNICATIONS LINE ? PROBABLE SPACE TRACKING FACILITY A TV TRANSMISSION FACILITY so ,oo NAUTICAL MILES FIGURE 1. COMMUNICATIONS SYSTEMS, HUNAN PROVINCE, CII [N1` Table 1. Facilities Associated With New Communications System, Hunan Province (Items numbers keyed to Figure 1) Item Installation 1 Li-hsien Radio Relay Station Bunkered 2 Ch~-,.ng-te Radio Relay Station Bunkered 3 San-tang-chieh Radio Relay Station Bunkered 4 I-yang Radio Relay Station Bunkered 5 Yin-tien Radio Relay Station Bunkered 6 Cha-yuan-pu Radio Relay Station Bunkered 7 Heng-yang Radio Relay Bunkered Station 8 Lei-yang Radio Relay Bunkered Station 9 Tzu-chi-shih Probable Tracking Facility Space 10 I-yang Probable Space Facilit Tracking y 11 Chang-sha TV Transmission Facility Coordinates 29-35-50N 111-40-15E 29-08-51N 111-42-05E 28-42-30N 111-55-53E 28-29-35N 112-21-OOE 27-54-25N 112-22-50E 27-38-38N 112-58-20E 26-55-08N 112-53-28E 26-18-50N 112-51-38E 26-21-26N 111-10-07E 28-42-30N 112-16-40E 28-02-1ON 113-03-40E TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78T05162A000300010008-0 TOP SECRET RUFF Communications Systems Hunan Province China 1. This report describes two communications systems current- ly being developed in Hunan Province. The report includes text, a location map, four photographs, and references and is based on photography between July 1971 and September 1972. 2. Two major communications systems are being developed in Hunan Province (Figure 1). One system, an underground telecommuni- cations line, is more than 520 nautical miles (nm) long. The other is a series of eight bunkered, radio relay communications facili- ties. Possibly related facilities include a TV transmission tower near Chang-sha and two probable space tracking facilities. Underground Telecommunications Line 3. The 520 nm of underground telecommunications line was identified on photography The line runs generally north and south, connecting the Chung-ching/Shang-hai telecommunications line in the north with Canton. Two branch lines, totaling approximately 115 nm, have been identified since March 19721 One branch extends from the trunk line at 29-33N 111-32L west for approximately 32 nm to the vicinity of Tzu-li at '19-26N 111-07E. The second branch extends from the main trunk line at 27-08N 111-23E near Shao-yang east for approximately 83 nm to the vicinity of Nan-yueh at 27-15N 112-44E. The main trunk line crosses wide streams or rivers at at least six locations. At these points the line splits into either two or four segments, crosses the river, and then rejoins on the opposite shore (Figure 2) Radio Relay Communications Facilities 4. A series of bunkered, radio relay communications facili- ties have also been identified Eight 25X1 sites are generally parallel to the main portion of the under- ground telecommunications line. Other sites in Kwangtung Province indicate that this system will extend to Canton. 5. A typical site is at Li-hsien (Figure 3). This facility consists of a bunkered operations building and several support buildings on a hilltop. The bunkers at all sites are open on two ends. The open end of the bunker at one site is in line with the open end of the bunker at the next site in the network. These sites are generally from 25 to 35 nm apart and are usually on the highest point of land in the immediate area. 6. The Chang-sha TV Transmission Facilit 25X1 was identified just south of Chang-sha 25X1 This facility consists of a 25X1 lattice TV transmitting tower on- a hilltop 10.5 nm south- 25X1 southeast of Chang-sha at 28-02-10N L13-03-40E. TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78T05162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Iq Next 1 Page(s) In Document Denied Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78T05162A000300010008-0 TOP SECRET RUFF 7. Two facilities in Hunan Province have been tentatively identified as probable space tracking facilities. Tzu-chi-shih Probable Space Tracking Facility at 26-21-26N 111-10-07E, was identified in southern Hunan This facility contains two pe esta -mounte , solid-dish parabolic antennas. One antenna is 16.0 meters (51 feet) in diameter Each is next to a control building. Cable trenching con- nects both antennas. I-yang Probable Space Tracking Facility at 28-42-30N 112-16-40E was identified in north- central Hunan This facility contains three pedestal-mounted, solid-dish parabolic 8. Lack of good coverage between October 1969 and February 1972 precludes an accurate negation date for most of the system. It can be established, however, that it has been constructed since October 1969. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78T05162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 TOP SECRET RUFF 1. NPIC.I I, PIN-029/72, Continuing Construction Underground Telecommunications Line, South China, Mar 72 (TOP SECRET RUFF) 2. NPIC. RCA-15/8011,/72, Tzu-chi-shih Probable Space Tracking Facility, Mar 7 2 (TOP SECRET RU F REQU I REMENT NPIC/IEG/EGD/SECB Project 120301NT TOP SECRET RUFF Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0 TOP SECRET TOP SECRET Sanitized Copy Approved for Release 2011/08/09: CIA-RDP78TO5162A000300010008-0