SUBMARINE TORPEDO/MINE HANDLING FACILITIES CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05162A000400010053-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 14, 2011
Sequence Number: 
53
Case Number: 
Publication Date: 
November 1, 1974
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05162A000400010053-9.pdf185.03 KB
Body: 
Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 25X1 PHOTOGRAPHIC INTERPRETATION REPORT NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER SUBMARINE TORPEDO/MINE HANDLING FACILITIES CHINA ~.~? 25X1 NOVEMBER 1974 COPY NO. 8 PAGES PIR-068/74 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 TOP SECRET RUFF 1. This report describes the five and possibly six torpedo/mine handling facilities which support China's submarine force. The facilities are collocated with China's six submarine operating bases. Three are in the North Sea Fleet area, with one possibly at Hsiao-ping-tao, one at Ching-tao, and one at Lu-shun; two are in the East Sea Fleet area at Ta-hsieh-tao and Hsiang-shan; and one is in the South Sea Fleet area at Yu-lin. 2. The report contains a location map and six photographs. SUBMARINE TORPEDO/MINE HANDLING FACILITIES, CHINA 3. Five and possibly six torpedo/mine handling facilities have been identified in China (Figure 1). They are collocated with China's six submarine operating bases. Three of the facilities are in the North Sea Fleet area, with one possibly at Hsiao-ping-tao Submarine Base (38-49-04N 121-29-31E; one at Ching-tao Submarine Base (36-05-41N 120-18-46E; and one at Lu-shun Submarine Base (38-47-16N 121-14-38E; Two are in the East Sea Fleet area at Ta-hsieh Submarine Base PUG (29-53-55N 121-57-51E; and Hsiang-shan Naval Facility (29-32-13N 121-46-21E; .One is in the South Sea Fleet area at Yu-lin Submarine Base (18-13-32N 109-32-44E; 4. All the facilities consist of three basic components interconnected by narrow-gauge rail lines: a loading/unloading wharf, pier, or quay; an assembly/checkout area; and a storage area. Torpedoes or mines are placed on handling dollies and moved from the storage and/or assembly/checkout area to the loading/unloading area via narrow-gauge rail lines. iND ? 1; MPQ . f `" % :.~~?` ~'~`+, ~~ .~~esr? -??~,?` /_?~?-~ 'J HSIAO-PING-TAO -t: f C H I,N A ~ Cheng- uj ; Chu ni g?chi ng r'?~ ~,J r~NORTN ?`` VIETNAM ~IVAa1 ~?~~''j .~ Nnirva PEKING? Wuchai ~~~,/ Haarh~in ~\ ~~. '/ 1 ~? ~ ~ ,cA '~ ~~ EPJ IaP~a\ I -- r i \ ` Lanchou ~ ! I Cheng~chou !~ ~ tii .e~l~t' F~ t~,N~ "~,~` SOU1H ~\ KOpEP .y yELLD\\ Q~F~: ~A F~~`E~T ~~~ =.~s-s~~ rd~~r .' ,~ ?~chi hang-hai Han?kou YTA-HFI-TAB-? ~,IANG-S~9AN 1 i1 EAST ~Hi.A SEA THAILAND LAOS ~ ~. TOP SECRET RUFF mn~no rte'` ~ ~1 \ron. .i''v' \ C'C ~F.9 i~~~~, snL'7x e~~rnA sea ~ t ~~~\ ~ r r"~~ li( Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 25X1 25X1 25X1 25X1 25X1 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 i iur ~t~rcti Kurr i 5. Hsiao-ping-tao Submarine Base (Figure 2) is on the Liao-tung peninsula approximately 11.0 nautical miles northeast of Lu-shun. It is the operating base for China's probable submarine-launched ballistic missile (SLBM) test platform, the G-class ballistic missile submarine (SSB). Hsiao-ping-tao was the staging base for two series of probable SLBM-associated tests which took place during 1972-1974. 6. The weapons handling facilities at Hsiao-ping-tao and the confirmed torpedo/mine handling facilities observed at the other Chinese submarine bases are similar. They consist of a quay connected by narrow-gauge rail to a high-bay weapons-associated building. However, activity observed at Hsiao- in -tao suggests that the facility has been SLBM related rather than torpedo/mine related. A suspect SLBM container on a dolly was on the narrow-gauge rail Other SLBM-associated equipment was also present. No torpedoes mines, crates, or handling equipment has been observed at Hsiao-ping-tao. 7. Torpedo/mine handling facilities at Ching-tao Submarine Base (Figure 3) consist of a loading/unloading finger pier connected to assembly/checkout buildings by a narrow-gauge rail line. Two probable explosives storage bunkers are in the area but are not rail served. 8. Torpedo/mine handling facilities at Lu-shun Submarine Base (Figure 4) consist of two loading/unloading finger piers connected by a narrow-gauge rail line to two assembly/checkout buildings. 9. Torpedo/mine handling facilities at Ta-hsieh Submarine Base PUG (Figure 5) consist of a loading/unloading wharf connected by a narrow-gauge rail line to three assembly/checkout buildings and a probable storage tunnel. 10. Torpedo/mine handling facilities at Hsiang-shan Naval Facility (Figure 6) consist of a loading/unloading wharf connected by a narrow-gauge rail line to two probable storage tunnels. 11. Torpedo/mine handling facilities at Yu-lin Submarine Base (Figure 7) consist of a loading/unloading quay connected by a narrow-gauge rail line to a large assembly/checkout building. MAPS OR CHARTS DOD. US Air Target Chart, Series 200, Sheets 0381-9 and -24, 0492-12 and -17, and 0618-12 REQUIREMENT Project 143431 NC TnP SECRET RIIFF Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 25X1; 25X1 25X1 25X1 25X1 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 Q Next 5 Page(s) In Document Denied Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9 TOP SECRET TOP SECRET 25X1 Sanitized Copy Approved for Release 2011/07/14 :CIA-RDP78T05162A000400010053-9