SURFACE-TO-AIR MISSILE SUPPORT FACILITY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000100240104-3
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
July 6, 2000
Sequence Number:
104
Case Number:
Publication Date:
March 31, 1960
Content Type:
BRIEF
File:
Attachment | Size |
---|---|
CIA-RDP78T05439A000100240104-3.pdf | 129.91 KB |
Body:
ILLEGIB
Approved For Release 2000/08/04: CIA-RDP78TO5439A000100240104-3
Approved For Release 2000/08/04: CIA-RDP78TO5439A000100240104-3
~~ JOO
2 01
Declassification review by NIMA/DOD
Nb Pages
C Opy No 46
JOINT PHOTOGRAPHIC INTELLIGENCE BRF
ARMY-NAVY-CIA t
(Published and Disseminated by CIA/PIC)
SUBJECT :
Surface-to-Air Missile
NO
PIC/JB-40/60
Support Facility
DATE
31 March 1960
LOCATION :
Saratov Area, USSR
COORD:
51?25'N 46?09'E
Figure 1. SAM SUPPORT FACILITY 4.5 NM SSW OF SARATOV/ENGELS
AIRFIELD.
MINICARI C1Y
111 -'e
13 /'
TOP SECRET CHESS
IPIC /JB-40/60
45?
30?
46?
00?
46?
30-
NOVO-SKATOVKA
Ct11ARDYM
ID OLG A
f
'
TATISHCHEVO
_
' t
I
? 5 t1~` f z
ti
t 5
7
SARATOV
-
'
r
NGELS-
KRASNYY
KVASNIKOVK
'
=
SHCHIK
TEKSTIL
/
1
Z~~ (
UZMOR'YE
k KAZITSKOYE
VOROSHILOVGRAD
SAM
SITE S
O
10
SAM
SUPPORT FACILITY NAUTICAL MILES I
SAM
TRAINING SITE PRIVOLZHSKOYE
SUB
JECT INSTALLATION
45' 30?
KRASNOARMEYSK 46? ow
46?
30?
FIGURE 2. SAM SITES AND SUPPORT FACILITIES IN THE SARATOV AREA.
-2-
25X1 D
Datof information
TOP SECRET CHESS
TOP SECRET CHESS
1IC/JB-40/60
REFERENCE POINT:
Sa.ratov/Engels Airfield, BE No
25X1A
LOCATION:
4.5 rim south-southwest of reference point.
51?29100"$V - 46?11'00"E
8
FUNCT ON:
Tsupport facility serves SAM sites deployed for theE defense
FACILITY STATUS:
Mid stage of construction.
MISSILES:
Nor.e observed.
VEHICLES AND. EQUIPMENT:
None observed.
COMMUNICATIONS:
None observed.-
OVERHEAD POWER and/or COMMUNICATION LINE:
Overhead wire line leads to facility.
No Stories
Di
mensions (feet)
Drive-through checkout/
ma.ir_.tenance building
Base
Gable
2
E
190x 80
Wing
Shed
2
80x 20
Drive-through checkout
Gable
1
65x35
building
Drive-through checkout
building
Rjevetted storage 'bldg.
Gable
Gable
1
R
100x 30
Rjevetted storage bldg.
Gable
1
40x35
Rievetted storage bldg.
Shed
1
25x25
Steam plant
Gable
1
60 x 40
-3-
TOP SECRET CHESS
TOP SECRET CHESS
25X1 D
Oxidizer storage shed
Gable
1
'45 x 35
Administration bldg.
Gable
1
45 x 40
Support bldg.
Gable
1
,30 x 25
2 Support bldgs.
Shed
1
115 x 15
Other features include: 2 revetted horizontal tanks, ''each 1.5 feet long
and? feet in diameter; an excavation for a buried Tank 25 feet in.
diameter; one buried tank= feet in diameter; or.e earthen bunker
30 x 25 feet under construction; and,. a probable waste pit excavation
130 x 90? feet, connected by a ditch to the southwest corner of the
facility.
Iregula.r-shapedAecurity fence encloses facility. r
SECURITY:
25X1 D
Board fence under construction 1, 000 x 650 feet encloses missile assembly
Probable peripheral light poles.
25X1 D
-4-
TOP SECRET CHESS