NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

POSSIBLE PROPULSION TEST COMPLEX, UFA, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200070002-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 18, 2000
Sequence Number: 
2
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200070002-4.pdf119.22 KB
Body: 
Approved For Release 2001/09/03 : CIA-RDP78TO5439A000200070002-4 Approved For Release 2001/09/03 : CIA-RDP78TO5439A000200070002-4 0 VP Declass Review by NIMA f DoD NPIC/R-141/62 PO~?IBLE PROPULSION TEST COMPLEX, UFA, . USSR 25X1 D ILLEGIB ILLEGIB ILLEGIB ILLEGIB ILLEGIB ILLEGIB '4LLEGIB ILLEGIB A possible propulsion test cor1pIL.? \. by KEYHOLE pl4rography of is located on 'high grounj in an isola; area 4 nautical~imil~s (nm) southca:;: oveshchensk an appro)mately 15 ri:; northeast of Ufa at 54-59 0 10 1 5b-( 4 - ure 1). This complek consi is of a P().4 test area and a pose ble support area and could provide ar important link ing the capabilities of Soviet propu. -:.: changes have taken place sine first observed. Two-SA-2 5:-,',1 identified in the 'general area. ities at the complex, it probai,iv: with the Ufa Aircraft Engine F'1 B-26. These plants are located 10.5 'nm 'south of the complex Chernikovsk. The large L'fa petrc?:.. k:: ,,les also are located in the villa. . i ; m south of the complex an,i ma} association with the complex. ii:?, 3sl -; r:Fa; serves the refineries has been extended to serve the A~omplex, and an access road had been con- structed from the Ufa- Blagoveshc;.-he n,;k `i i ._hway, The possible static test area, ~~hi h_ineas ures approximately 1,680 by is situa- ed in a wooded area and is enclosed by a single wire fence. The main features of the area are a possible static test; stand of t%yo and possibly three bays that. measures aprir oximately 200 by 80 "feet, a possible control building, and five support buildings. Logistic support is provided by an all-weather road and.a rail spur, both of which connect with Ufa Aircraft Engine-Plants A-26 and B-26. These routes also pass the eastern boundaries of the Ufa petroleum refin- eries, which may indicate some connection between them and the test complex. i le static test stand appears to be a :situated adjacent to an apron that on the same level as the base of the id,. of the building that faces the apron ix.? open. This arrangement may indi- :t: :est stands are designated for 'fi ring,'although no burn scars -- char- of such an arrangement -- are visible. ximately 300 feet south-southeast of -scble static test stand is another road- building measuring g,40 feet squpre that i s 4erve as a control building. Ground scars 2:e that possibly cable or pipeline connect building with the possible static test stand. t to w,. ve r, dense forest obstructs the line of sight li -t