ARMS PLANT NO 9, SVERDLOVSK, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200290061-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 1, 2000
Sequence Number: 
61
Case Number: 
Publication Date: 
May 1, 1961
Content Type: 
BRIEF
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200290061-5.pdf160.93 KB
Body: 
ILLEGIB Approved For Release 2001/03/03 : CIA-RDP78TO5439A000200290061-5 Approved For Release 2001/03/03 : CIA-RDP78TO5439A000200290061-5 cccn DECLASS REVIEW by NIMA/DOD ARMS PLANT NO J SVEREILOVSK, LJ SSR- ~;i~B 1W111 Wyl Published and Disseminated by CENTRAL INTELLIGENCE AGENCY PHOTOGRAPHIC INTELLIGENCE CENTER PIC/B-1003/61 May 1961 NOFORN 25X10 (DOWNGRADING PROHIBITED) 25X1 C HIBITIED) 25X1 C 25X1 D SVERDLOVSK HEAVY EQUIPMENT PLANT, -011 -ArW Arms Plant No 9 (56-52N 60-35E) is one of two arms plants (Plant No 8 is the other) within the target complex of Sverdlovsk, USSR, that are known major producers of heavy-caliber artillery, antitank, and naval guns. 1/ This plant, in common with other artillery plants, has a good potential for the development and production of guided missiles. Z/ Pho- tography of however, shows only two components that may be connected with missile production: the high-bay production building (Fig- ure 2, item 8) and the secured shipping and receiving area (item.12) . The arms plant has a total ground area of approximately 9, 500, 000 square feet and a total usable floor space of approximately 1,311,909 square feet. The major components of the plant are annotated on Figure 2 and described in the accompanying table of annotations. FIGURE 1. SVERDLOVSK ARMS PLANT NO 9. The plant is in the compound containing the Sverdlovsk Heavy Equipment Plant in north-central Sverdlovsk 25X1 D SECRE EM~~~~ SECRET N14i~6W[+R~ COQ: 25X1 C SECRET 25X1 D 1 Administration bldg u/c 2 Assembly & workshop bldg (rail served) 3 Workshop bldg 4 Workshop (within fenced area; rail spur enters bldg) 5 Probable workshop u/c 6 POL storage area (fenced) Two vertical tanks One horizontal tank Pump house 7 Bridge crane A section B section C section (two rail spurs enter B & C) D section E section u/c F section 9 Four storage bldgs 10 Storage bldg (rail served) 11 Probable workshop 12 Secured shipping and receiving area Two storage-type bldgs Platform (served by through rail spur) 13 L-shaped storage bldg 14 Bldg u/c (footings only) 15 Poss administration bldg u/c SECRET 25X1 C 25X1 C L E G E N D ----------HEAT PIPELINE (OVERHEAD) -?-?-- GAS PIPELINE (OVERHEAD) POL PIPELINE 25X1 D MAPS or CHARTS SAC. US Air Target Chart, Series 200, Sheets 0156-18A & 23A, 1st ed, Apr 59, 1:200, 000 (S) SECRET 25X1 C 1. ACIC. US Target Information Sheet 0156-9999, 3d ed, 2 Nov 55 (S) 2. CIA. OSI Working Paper, PD Z-13, 18 Jun 59 (S) SECRET 25X1 C